{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.530925711,"lon":-81.43779982,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Cuyahoga | |
Municipality: Mayfield Heights | |
Operator Name: BAAY OIL LLC | |
Well Pad ID: | |
Farm/Lease Name: DEFABIO-STONECREEK UNIT | |
License Status: Producing | |
License Date: 2010-06-23 | |
Spud Date: 2010-07-21 | |
Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING | |
Final Drill Date: 2010-08-01 | |
Well Total Depth: 1101 ft | |
Configuration: Directional | |
Latitude: 41.530925711 | |
Longitude: -81.43779982 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-06-23 | Proposed Formations:OHIO SHALE/ORISKANY/NEWBURG/CLINTON, Issued Date:6/23/2010, Expired Date:6/23/2011 6:00:00 AM, Drilling unit acres:21.5, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-08-01 | |
Construction Permit Expires | 2011-06-23 | |
Completion Report Received | 2011-07-13 | |
Change of Owner | 2016-01-29 | Operator changed from 1304, SEAGULL DEVELOPMENT CORP to 8560, BAAY OIL LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-09-21 | 3400 | 3450 | 24 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-08-23 | H2O | 0 | 38241 Gal | 25000 | Superior Well Services |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | SEAGULL DEVELOPMENT CORP | 0 | 0 | 0 |
2011 | SEAGULL DEVELOPMENT CORP | 60831 | 297 | 365 |
2012 | SEAGULL DEVELOPMENT CORP | 70864 | 33 | 366 |
2013 | SEAGULL DEVELOPMENT CORP | 56710 | 50 | 365 |
2014 | SEAGULL DEVELOPMENT CORP | 109028 | 150 | 365 |
2015 | SEAGULL DEVELOPMENT CORP | 95188 | 63 | 365 |
2016 | BAAY OIL LLC | 60973 | 78 | 365 |
2017 | BAAY OIL LLC | 61203 | 0 | 365 |
2018 | BAAY OIL LLC | 52107 | 77 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | SEAGULL DEVELOPMENT CORP | Brine | 1325 | 0 |
2011 | SEAGULL DEVELOPMENT CORP | Brine | 371 | 365 |
2012 | SEAGULL DEVELOPMENT CORP | Brine | 80 | 366 |
2013 | SEAGULL DEVELOPMENT CORP | Brine | 104 | 365 |
2014 | SEAGULL DEVELOPMENT CORP | Brine | 187 | 365 |
2015 | SEAGULL DEVELOPMENT CORP | Brine | 105 | 365 |
2016 | BAAY OIL LLC | Brine | 32 | 365 |
2017 | BAAY OIL LLC | Brine | 70 | 365 |
2018 | BAAY OIL LLC | Brine | 57 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0031267954 | 2010-08-04 | Drill / Deepen / Reopen | No Violations | Drilling pits fenced, silt fence installed along east side of site and orange fence installed in driveway to preventing access to site . |
0039292687 | 2010-10-13 | Urban Drill / Deepen / Reopen | No Violations | Still waiting on the weather to dry up location .No violation. |
0105540181 | 2010-07-25 | Drill / Deepen / Reopen | No Violations | Drilling at 1600 on fluid. Running Directional survey to check direction on target. |
0272181686 | 2010-09-10 | Urban Drill / Deepen / Reopen | No Violations | Crew on site grading area level. |
0275241366 | 2010-07-21 | Urban Drill / Deepen / Reopen | No Violations | Supervisor Cheslock and I on site to check pit placement for compliance, and frac tanks placement for sound barriers. The reserve pit to be dug to the west of well and barriers placed between vacant home and pit. Drilling conductor, cemented around 8 Pm. Good cement returns to surface. |
0363950299 | 2010-12-01 | Drill / Deepen / Reopen | No Violations | waiting on road boring permit from city. Too complete the well hook up. |
0383249924 | 2013-01-03 | UrbanProduction Wells | No Violations | I inspected this unit pursuant to an earlier complaint regarding the preliminary restoration. The unit consists of a mechanical plunger lift at the wellhead, enclosed in a 6-foot, board-on-board enclosure. The tank battery (TB) is located 50 feet to the east and is within an 8-foot board-on-board enclosure. There are three 8-foot pine trees on the west side of the TB enclosure. There are several pine trees south of the wellhead, but nothing surrounding the unit. I will contact Seagull Development and inform them that screening will be required around the wellhead as stipulated by the permit conditions. |
0389528797 | 2010-07-24 | Urban Drill / Deepen / Reopen | No Violations | Site check in compliance with permit condition. Drilling on fluid at 1100. |
0536844271 | 2010-07-25 | Urban Drill / Deepen / Reopen | No Violations | At the time, a contractor was rigging up a wire line. Total depth was at 1596 feet. Conditions were satisfactory. |
0567731054 | 2010-07-31 | Drill / Deepen / Reopen | No Violations | drilling at 3285 |
0658375519 | 2010-07-20 | Urban Drill / Deepen / Reopen | No Violations | Rig moving on site. Company wanted to change where reserve pit is to be from west to south side. I said no they have to be to the west. Phone call to Supervisor Cheslock he said he will be on site in the morning, to check site. I advised Rig contractor to wait to dig pits. |
0691501633 | 2010-07-30 | Drill / Deepen / Reopen | No Violations | Drilling at 3200 no violation. |
0727215948 | 2010-08-02 | Drill / Deepen / Reopen | No Violations | TD reached rigging up to run 4.5 casing to cement. |
0751931646 | 2010-07-24 | Urban Drill / Deepen / Reopen | No Violations | The rig was drilling at 1150 feet. Conditions were satisfactory. |
0784794319 | 2010-08-06 | Drill / Deepen / Reopen | No Violations | Still working on dewatering pits.
Trucks arrived with solidification material to do both pits closed . |
0826621736 | 2010-07-22 | Urban Drill / Deepen / Reopen | No Violations | Witnessed BOP test passed.
Note: During the afternoon the fire hydrant at driveway was hit and knock off at ground level by a salt water truck that was hauling salt water to site. The Driller on site was working on finding name of the driver to have him report it to Police Department. The company( Pander Trucking) driver still unknown Received complaint from Mr. Hughes of lights shining into his home from lease road. The lights were from trucks parked in the lease road. Advised company to have trucks turn lights off when parked in the leased road. Case closed |
0872667493 | 2010-07-29 | Drill / Deepen / Reopen | No Violations | Drilling 3097 no violation. |
0921176644 | 2010-10-15 | Urban Drill / Deepen / Reopen | No Violations | crew on site to survey the tank battery location.
Tank battery flagged off. |
0949669463 | 2010-08-01 | Drill / Deepen / Reopen | No Violations | Drilling at 3600 no violation. |
0980573441 | 2012-09-26 | UrbanProduction Wells | No Violations | Due to a complaint concerning the brine tank being collapsed at this well , I enlisted the assistance of Steve Tompkins, ODNR inspector for Lake County to inspect this well for me. While in the process of doing so the maintenance crew for Seagull Development arrived on location and repaired the tank in question by raising the collapsed portion of the brine tank to original condition. The integrity of the tank was never compromised and no leaks or spills were discovered. The well is in compliance with 1501-9-9-05, urban well producing operations. |
1036062717 | 2015-02-20 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The wellhead mechanical plunger lift and tank battery enclosures are locked and secure. System fittings and connections are secure and free from signs of leakage or problems. Load-outs are plugged, locked and secure. ID signage is present and accurate. |
1036923289 | 2010-07-26 | Drill / Deepen / Reopen | No Violations | Drilling at 1875 no violation. |
1153407451 | 2016-10-11 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. At the time of this inspection, I observed the following: The well was comprised of a mechanical plunger-lift system in a board-on-board enclosure. The enclosure gate was locked and secure. Fittings and connections at the wellhead were secure and free from signs of leakage. The tank battery was comprised of one 100-barrel steel production tank, one 50-barrel plastic brine tank, horizontal mechanical separator, and associated valve and tubular appurtenances. There were no signs or indications of problems or leakage. Load-line valves were locked and secure. Secondary containment was comprised of an earthen berm which was intact. The areas surrounding the well consist generally of grassy and wooded areas that border a small creek to the north. I did not observe any signs or evidence of problems or environmental degradation. |
1212629039 | 2010-07-26 | Drill / Deepen / Reopen | No Violations | checking drill site drilling at 1800 Tripping out bit and drill collars to rig up directional tools on to drill stem. |
1214628565 | 2010-08-26 | Drill / Deepen / Reopen | No Violations | on site crew working on moving frac tanks to next site.
Fluid around well head oil tested for chlorides above 10,000 advised company to get crew to removed fluid and soil around wellhead area approximately 8 radius of well casing. I proceeded to take samples of fluid (1 presv,1not Presv) and one soil. Asked Antoney company as to where the fluid came from he said from when company was swabbing the well this area was under where lines when to the frac tanks. Soil was then removed and area filled in with fresh fill. |
1280068350 | 2010-07-23 | Urban Drill / Deepen / Reopen | No Violations | Drilling at 460 on fluid. Crew running survey to check bit deviation Less than 1 degree off. |
1281104169 | 2010-06-16 | Administrative Inspection | No Violations | Held on site meeting to discuss the on site construction and permit condition. |
1282569853 | 2010-08-23 | Drill / Deepen / Reopen | No Violations | On site to check the status of frac job. Superior Well Service on site fracing the well. At the time of inspection operator was pumping frac water to form the pad for the sand. Drainage controls were in place. No annular circulation noted. Total slurry ran for the job, 68241. Max casing pressure 1621-psi Safety fence is in place. Permit sign is posted. Ground on site is damp. Frac job observed from the edge of location. Operator has frac tanks set up on the south side of location. Pits have been closed. Lease road is stable. |
1283176885 | 2010-08-26 | Drill / Deepen / Reopen | No Violations | On site to meet with Norburt Lowder Cuyahoga county inspector. Frac tanks have been removed from site. Lease road is stable. Temporary fence has been built around the well head. Soil conditions on site were damp. There was standing water in the wheel ruts east side of site. Operator had cleaned up fluid around the wellhead before I arrived on site. Pictures taken of site; Picture #1 West end of site, Picture #2 center of location, Picture #3 North side of site, Picture #4 Center of location, Picture #5 area where fluid was removed, Picture #6 south east corner of location, Picture #7 same as 6, Picture #8 wellhead, Picture #9 drainage controls, Picture # 10 & 11 site, Picture #12 drainage controls. |
1285781101 | 2010-07-21 | Drill / Deepen / Reopen | No Violations | cemeted surface casing good retures to surface. |
1287416642 | 2010-07-28 | Drill / Deepen / Reopen | No Violations | Drilling on fluid (2880)No gas checked with Gas meter. |
1348700862 | 2012-09-26 | UrbanProduction Wells | No Violations | I observed the wellhead, which consists of a mechanical plunger-lift unit enclosed within a slat-board fence. The fence is locked. The tank battery (TB) is located 75 feet to the east. The TB is also enclosed within a wood-slat fence, which is approximately 8 feet high. The TB is comprised of one, 100-barrel (BBL) steel production tank and one, 10-barrel poly brine tank. The domed top portion of the poly tank is somewhat depressed downward, but is otherwise in good condition. The remaining mechanical appurtenances include a mechanical separator, and standard valves. The production tank is fitted with a charcoal canister filter, a spark arrestor, and a low-pressure relief valve as required. The interior of the TB is enclosed within an earthen dike. The TB interior area is gravel lined and has been recently weeded. Unit appears to be in good working order and producing. There is an ID sign on the TB, but not at the wellhead unit. A prior inspection had noted the presence of production tubing and casing along the lease road. These materials have been removed and the lease road appears to be well maintained. While I was onsite, contractors for the owner arrived to repair the brine tank. The contractors were successful at restoring the top of the poly tank to the rounded shape. I discussed with the contractors maybe putting the ID sign on the wellhead fence where it might be more visible. They indicated that they had been told previously to put the sign at the tank battery, possibly by the fire department. I observed the load-out couplings to be locked. I did not observe any evidence of active or historic leaks or releases of gas, oil, or brine in or around the unit. The contractors indicated that there is a current Spill Prevention Control and Countermeasures (SPCC) plan for the TB. |
1349279091 | 2011-05-13 | UrbanProduction Wells | No Violations | Travelled to this well on May 13, 2011 with Inspector Norburt Lowder to investigate noise complaint #3123 issued 5/10/2011. Investigated well site to include well head, tank battery and sales lines. . Well is constructed under 1509: 9-9-05, producing operations, sub section Urban Producing Operations. The owner has gone to the additional measures of applying 2 foam panels to abate the noise issues. No violations were found during the inspection and the well is in compliance with the laws of the State of Ohio. |
1350589669 | 2011-05-13 | UrbanProduction Wells | No Violations | 05-10-2011 Phone call to company and talked to John Visnar He said he will look into a solution to the noise from the tank battery (stated the problem is that when the well was turned on and flowing into the sales line it flowed 24 hour a day7days and it did not slow down!). Mr. Visnar stated there is an agreement between the company and the lease holders, along the north property line that several trees to be planted along the property line as a sound and visual barrier.
Inspection on 05-13-2011 Ray Wallace(Inspector1)and Norburt Lowder (Inspector 3), Found landscape not done due to weather gave extenstion. A crew for the company was working on sound proofing being placed on the inside of the perimeter fencing of the tank battery. Case # 11-001 Closed |
1454598538 | 2016-02-04 | UrbanProduction Wells | No Violations | I inspected this well location as part of routine inspection activity. At the time of this inspection, I observed the following: Ingress and egress to from the well area is afforded by a short, dedicated lease road which enters from SOM Center Road. A wellhead with mechanical plunger lift system is located in a board-on-board enclosure in an otherwise undeveloped parcel. The well enclosure was locked and secure. Fittings and connections at the wellhead are secure and free from leakage. The 8.625-inch casing annulus was exposed and plumbed into the system. Areas around the wellhead consist of turf grass which was free from signs of stress or impact. The tank battery is located 50 feet east of the wellhead within the same grassy and wooded area which slopes off to the east to a small drainage stream. The battery is comprised of one 100-barrel, steel production tank, one 50-barrel poly brine tank. At the time of this inspection, the access gate to the battery was locked and secure. Signage was present. Fittings and connections were secure and free from signs of leakage or problems. Process safety gear and carbon filter system was present. Secondary containment was intact and dry. Tank lids were closed and sealed. The load-outs are located remotely from the battery near the edge of the access road, and were plugged and locked. Evergreen screening was present surrounding the battery and in good condition. I walked the area surrounding the battery and observed normal grassy vegetation with no signs of erosional deficits or impacts associated with the production operation. |
1524230422 | 2010-07-22 | Urban Drill / Deepen / Reopen | No Violations | Cemented surface casing, good cement returns to surface. Working on reserve pit to the west |
1575775243 | 2010-08-05 | Drill / Deepen / Reopen | No Violations | Pits being dewatered. |
1609249856 | 2010-08-20 | Drill / Deepen / Reopen | No Violations | Crew rigging up to perf well casing. |
1635106098 | 2010-08-31 | Drill / Deepen / Reopen | No Violations | Area being graded around well head. |
1697163881 | 2012-03-06 | UrbanProduction Wells | No Violations | My inspection found that the brine tank is collapsed and needs to be repaired or replaced. Also, the trash in the tank battery and the tubing and casing, along the driveway, needs to be removed. |
1770641501 | 2010-08-02 | Drill / Deepen / Reopen | No Violations | Rig moving to well west of SOM center RD on Ridge bury rd P#2177 |
1859126371 | 2010-09-30 | Urban Drill / Deepen / Reopen | No Violations | Area still to wet to work on restoration. |
1941648549 | 2010-07-20 | Urban Drill / Deepen / Reopen | No Violations | Site made, orange fencing around site and silt fencing installed per permit condition . Equipment moving on site. |
2056344854 | 2017-11-22 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The well and battery are located on a small, undeveloped tract adjacent to the school board building. At the time of this inspection, I found the following: a wellhead plunger-lift unit and associated battery. The separate board-on-board enclosures were locked and secure. The fittings and connections were secure and free from leakage or problems. Fittings and connections at the battery were secure. The load-lines were plugged and locked. ID signage was present and current. The secondary containment was intact with no signs of leakage, spills, or problems. The well was in active production. The chart recorder was active. Production reports were current. Bonding and insurance was in place and current. |
2057833046 | 2010-07-27 | Drill / Deepen / Reopen | No Violations | Drilling at 2710 no violations. |
For data sources see[9]