X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-103-23694

Well Details

Well ID: 34-103-23694
Loading map...
Country: United States
State: Ohio
County: Medina
Municipality: Chatham Township
Operator Name: HARLEY DRILLING & PRODUCING LT
Well Pad ID:
Farm/Lease Name: CUMMINGS & LEMASTER UNIT
License Status: Producing
License Date: 1984-03-14
Spud Date: 1984-07-26
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 1984-08-08
Well Total Depth: 440 ft
Configuration: Vertical
Latitude: 41.108181487
Longitude: -82.04204207

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1984-03-14 Issued Date 3/14/84 Expired Date 9/10/84 Acres 0085120 Tool Type CT Proposed Formation BEREA Proposed Depth 00440 Proposed Drill Depth 00440
Original Spud 1984-07-26
Completed 1984-08-08
Reached Total Depth 1984-08-08
CO 1984-08-15 475 R & E ENTERPRISES GeoDate 3/14/84
Construction Permit Expires 1984-09-10
Completion Report Received 1985-11-08
Change of Owner 2004-05-24 Operator changed from 475, R & E ENTERPRISES to 337, HARLEY DRILLING & PRODUCI
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 354 440 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
NITR 0 0 0 SHOT;NITRO

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 R & E ENTERPRISES 0 217 365
1986 R & E ENTERPRISES 0 105 365
1987 R & E ENTERPRISES 0 161 365
1988 R & E ENTERPRISES 0 100 365
1991 R & E ENTERPRISES 0 35 365
1993 HARLEY DRILLING & PRODUCING LT 0 34 365
1994 HARLEY DRILLING & PRODUCING LT 0 59 0
1995 HARLEY DRILLING & PRODUCING LT 0 54 0
1996 HARLEY DRILLING & PRODUCING LT 0 24 0
1997 HARLEY DRILLING & PRODUCING LT 0 22 0
1999 HARLEY DRILLING & PRODUCING LT 0 110 365
2001 HARLEY DRILLING & PRODUCING LT 0 22 365
2003 HARLEY DRILLING & PRODUCING LT 0 0 0
2004 HARLEY DRILLING & PRODUCING LT 0 27 365
2005 HARLEY DRILLING & PRODUCING LT 0 6 365
2007 HARLEY DRILLING & PRODUCING LT 0 0 365
2008 HARLEY DRILLING & PRODUCING LT 0 0 0
2009 HARLEY DRILLING & PRODUCING LT 0 0 365
2010 HARLEY DRILLING & PRODUCING LT 0 36 365
2011 HARLEY DRILLING & PRODUCING LT 0 42 365
2012 HARLEY DRILLING & PRODUCING LT 0 37 366
2013 HARLEY DRILLING & PRODUCING LT 0 12 365
2014 HARLEY DRILLING & PRODUCING LT 0 12 365
2015 HARLEY DRILLING & PRODUCING LT 0 23 365
2016 HARLEY DRILLING & PRODUCING LT 0 25 365
2017 HARLEY DRILLING & PRODUCING LT 0 12 365
2018 HARLEY DRILLING & PRODUCING LT 0 12 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 R & E ENTERPRISES Brine 30 365
1986 R & E ENTERPRISES Brine 10 365
1987 R & E ENTERPRISES Brine 45 365
1988 R & E ENTERPRISES Brine 22 365
1991 R & E ENTERPRISES Brine 32 365
1993 HARLEY DRILLING & PRODUCING LT Brine 22 365
1994 HARLEY DRILLING & PRODUCING LT Brine 40 0
1995 HARLEY DRILLING & PRODUCING LT Brine 60 0
1996 HARLEY DRILLING & PRODUCING LT Brine 11 0
1997 HARLEY DRILLING & PRODUCING LT Brine 11
1999 HARLEY DRILLING & PRODUCING LT Brine 0 365
2001 HARLEY DRILLING & PRODUCING LT Brine 23 365
2003 HARLEY DRILLING & PRODUCING LT Brine 13 0
2004 HARLEY DRILLING & PRODUCING LT Brine 13 365
2005 HARLEY DRILLING & PRODUCING LT Brine 3 365
2007 HARLEY DRILLING & PRODUCING LT Brine 0 365
2008 HARLEY DRILLING & PRODUCING LT Brine 0 0
2009 HARLEY DRILLING & PRODUCING LT Brine 23 365
2010 HARLEY DRILLING & PRODUCING LT Brine 60 365
2011 HARLEY DRILLING & PRODUCING LT Brine 55 365
2012 HARLEY DRILLING & PRODUCING LT Brine 25 366
2013 HARLEY DRILLING & PRODUCING LT Brine 2 365
2014 HARLEY DRILLING & PRODUCING LT Brine 7 365
2015 HARLEY DRILLING & PRODUCING LT Brine 45 365
2016 HARLEY DRILLING & PRODUCING LT Brine 0 365
2017 HARLEY DRILLING & PRODUCING LT Brine 7 365
2018 HARLEY DRILLING & PRODUCING LT Brine 1 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
000PL11625 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1407761617 2014-08-06 Production Wells No Violations Inspected production well on 08/06/2014. The tank battery consists of 2-100 bbl steel tanks and 1-100 bbl steel tank (on its side) located within an earthen dike. The tank battery is used by multiple wells (8); well identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. No well identification is posted at the wellhead as required. Tim Harley with Harley Drilling arrived on location during the inspection and was notified of the need for well identification at the wellhead. The signs are at the printer and will be posted as soon as they are ready. No other problems were noted at the time of the inspection.

For data sources see[9]

References