34-081-20759

Well Details

Well ID: 34-081-20759
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Country: United States
State: Ohio
County: Jefferson
Municipality: Mount Pleasant Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001541
Farm/Lease Name: MARQUARD W MTP JF
License Status: Producing
License Date: 2018-04-10
Spud Date: 2018-04-23
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-06-03
Well Total Depth: 22482 ft
Configuration: Horizontal
Latitude: 40.190143438
Longitude: -80.79965006

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-05 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/5/2018, Expired Date:3/4/2020 12:00:00 PM, Drilling unit acres:157.389, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2018-04-10 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/10/2018, Expired Date:4/9/2020 12:00:00 PM, Drilling unit acres:619.41, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-06-03
Correction to Well 2018-09-14 TAKE/TARGET AS-DRILLED PLAT
Completion Report Received 2018-11-06
Record Last Modified 2018-11-08
Construction Permit Expires 2020-04-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-11-07 10004 10144 0
2018-11-07 22261 22310 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/05/2018 08/08/2018 9722 16,408,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
SCALECHEK LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
Polymer CAS Not Assigned 68 0.000389955 602
Emulsifier 9002-92-0 10 0.00005735 89
PH Buffer 8055-55-8 15 0.00008602 133
Acrylamide acrylate polymer Proprietary 30 0.0160178 24728
Sodium persulfate 7775-27-1 100 0.00001749 27
Citric acid 77-92-9 60 0.00517237 7985
Ethanol 64-17-5 1 0.000213841 331
Olefins Proprietary 5 0.000148435 232
Modified thiourea polymer Proprietary 30 0.000371086 573
Sodium sulfate 7757-82-6 0.1 0.00000002 1
Telmer Proprietary 10 0.00230018 3551
Ethylene glycol 107-21-1 60 0.0138011 21306
Hydroteated light petroleum distillate 64742-47-8 30 0.0160178 24728
Sodium polyacrylate 9003-04-7 1 0.000230018 356
Hydrochloric acid 7647-01-0 7.5 0.123564 1,526,030.0
Fatty acids, tall oil Proprietary 30 0.000371086 573
Propargyl alcohol 107-19-7 10 0.000123695 191
Crystalline silica, quartz 14808-60-7 100 9.59975 14,819,700.0
Phosphoric acid 7664-38-2 0.1 0.00002138 34
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.0010692 1651
Acrylic acid 79-10-7 0.01 0.00000230 4
Inorganic salt Proprietary 30 0.0160178 24728
Glutaraldehyde 111-30-8 30 0.00641522 9904
Methanol 67-56-1 60 0.00077211 1193
Ethoxylated alcohols Proprietary 30 0.000371086 573
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG Halliburton Proppant Listed Below Listed Below 0 0 0
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 1.71628 2,649,530.0
Fresh Water Operator Base Fluid Water 7732-18-5 100 88.6445 136,846,000.0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
Gel 1100 Mountain Supply & Service, LLC Gelling Agent Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-08-06 H2O 15 207335 Gal 237160 Halliburton STAGE 70/70

STAGES 2-69 SEE IMAGES

2018-07-15 H2O 15 245900 Gal 241440 Halliburton STAGE 1/70

STAGES 2-69 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 2701623 0 108
2019 ASCENT RESOURCES UTICA LLC 2579913 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 13024 108
2019 ASCENT RESOURCES UTICA LLC Brine 12320 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0096074304 2018-04-25 Casing String Witnessed No Violations Pad address is 640 TOWNSHIP ROAD 107A DILLONVALE 43917. On the day of my inspection I witnessed Precision Rathole had augured a 36 inch diameter hole to a depth of 105 feet. 100 feet of 30 inch diameter conductor casing was run. CJ/Otex was onsite with 310 sacks of class A cement. Additives include 2% CaCl and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% percent excess ran. . Cement was displaced with 75 barrels of fresh water. Cement returned to surface and fell back to 39 feet. Top out schedule for 4/26 morning. Company Man Doug Bennett and Cement supervisor Steven Long onsite.
0553870233 2018-08-01 Completion Testing No Violations On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company man Louis. Halliburton frac crew is onsite and pumping on the 3H well. Stage 50/70 has plug set at 13697, bottom perforation at 13685, and top perforation at 13549. intermediate annular pressure is 686 psi.
0580380678 2018-05-25 Drill / Deepen / Reopen No Violations On the day of my inspection I found Patteron 284 drilling the lateral section of the well at 12744 feet with an 8.5 inch diameter bit. No flare during my inspection. Rig using a mud weight of 13.2 ppg. Kick off point for curve was 9180 feet and landed at 10318 feet.
0616192158 2018-05-09 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson 284 was moving onto location. Mine string was set by falcon 26 and surface remains to be set by this rig. Company man Will was informed I need to be kept abreast of information pertaining to cement job timing.
0699948282 2018-05-17 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 284 drilling a 12.25 inch diameter hole at 7540 feet. Plan to drill to approximately 8900 feet and set 9.625 inch diameter casing. Casing is being brought onsite during my inspection. Walk around location revealed containment is clean and functioning.
0858630459 2018-04-26 Casing String Witnessed No Violations On the day of my inspection I witnessed that cement had dropped back to 39 feet and 10 yards of 9-sack grout was dumped down the backside to surface. The cement level was dropping very slowly and I do not expect another top out will be necessary. I will wait to hear from Company man Doug Bennett on where cement finally sets up at.
0940217155 2018-04-24 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Prcesion Rathole has augered this hole to a depth of 105 feet. No casing has been run yet and plans to cement all three wells tomorrow.
1239628531 2018-07-18 Completion Testing No Violations On the day of my inspection I found a Halliburton frac crew on location. This well is on stage 7. Plug is at 21308, bottom perforation at 21296, and top perforation is at 21155. Surface annular pressure is 0 and intermediate is 420. They just finished stimulating this well. ISIP is 6437. Average rate was 74.65 barrels, average pressure was 11155. Breakdown pressure was 8976 at 30 barrel per minute.
1382470270 2018-07-24 Completion Testing No Violations On the day of my inspection I found a Halliburton frac crew on location. This well is on stage 21. Surface annular pressure is 0 and intermediate is 55. Stage 14 was abandoned in this this well because the formation would not accept the sand they were trying to pump. No stimulations occurring while on location.
1526927341 2018-05-21 Casing String Witnessed No Violations On the day of my inspection I witnessed the second stage of the intermediate casing cement job. Patterson 284 drilled a 12.25 inch diameter open hole to a depth of 8922 feet. Previous casing set and cemented was 13.375 inch diameter surface (61 lbs/foot) casing at a depth of 1558 feet. Wyoming casing ran 8912 feet of 9.625 inch diameter casing, l-80, 40 lbs/foot. Casing was centralized with 225 centralizers. Shoe track is 83 feet long. DV tool set at 4800 feet. Schlumberger was onsite with 1580 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 30% excess ran in open hole. Cement displaced with 364 barrels of fresh water. 40 barrels of 13 ppg mudpush pumped ahead of cement. 59 barrels of cement returned to surface, and floats held.
1534344308 2018-08-15 Completion Testing No Violations On the day of my inspection I found this pad to contain two wells that have been drilled and fracked. Also one well not drilled below the surface casing. Production equipment includes two 500 barrel steel tanks, two GPUs, two line heaters, and 4 sand seperators. ID to Ascent construction inspector Jordy Bernard. Production equipment and well connect construction is occuring. Surface annular pressure is zero and intermediate annular pressure is 0. Frac plugs have not been drilled out.
1535557202 2018-08-29 Completion Testing No Violations On the day of my inspection I witnessed Deep Well onlocation with a snubbing unit. Identified myself to Company Man James Edwards. This well has no been drilled out yet. They are tripping out of the 3H. Surface annular pressure is 0 and intermediate annular is 0 psi.
1596878122 2018-08-06 Completion Testing No Violations On the day of my Inspection I witnessed Halliburton frac crew moving off of location. ID to company man Louis. 2 kill plugs were set in this wellbore at 9607 and 9528. Surface and interediate annular pressures are zero.