If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20759 | Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Mount Pleasant Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001541 | |
Farm/Lease Name: MARQUARD W MTP JF | |
License Status: Producing | |
License Date: 2018-04-10 | |
Spud Date: 2018-04-23 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-06-03 | |
Well Total Depth: 22482 ft | |
Configuration: Horizontal | |
Latitude: 40.190143438 | |
Longitude: -80.79965006 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-03-05 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/5/2018, Expired Date:3/4/2020 12:00:00 PM, Drilling unit acres:157.389, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2018-04-10 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/10/2018, Expired Date:4/9/2020 12:00:00 PM, Drilling unit acres:619.41, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-06-03 | |
Correction to Well | 2018-09-14 | TAKE/TARGET AS-DRILLED PLAT |
Completion Report Received | 2018-11-06 | |
Record Last Modified | 2018-11-08 | |
Construction Permit Expires | 2020-04-09 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-11-07 | 10004 | 10144 | 0 |
2018-11-07 | 22261 | 22310 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/05/2018 | 08/08/2018 | 9722 | 16,408,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 |
SCALECHEK LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
Polymer | CAS Not Assigned | 68 | 0.000389955 | 602 | ||||
Emulsifier | 9002-92-0 | 10 | 0.00005735 | 89 | ||||
PH Buffer | 8055-55-8 | 15 | 0.00008602 | 133 | ||||
Acrylamide acrylate polymer | Proprietary | 30 | 0.0160178 | 24728 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00001749 | 27 | ||||
Citric acid | 77-92-9 | 60 | 0.00517237 | 7985 | ||||
Ethanol | 64-17-5 | 1 | 0.000213841 | 331 | ||||
Olefins | Proprietary | 5 | 0.000148435 | 232 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000371086 | 573 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000002 | 1 | ||||
Telmer | Proprietary | 10 | 0.00230018 | 3551 | ||||
Ethylene glycol | 107-21-1 | 60 | 0.0138011 | 21306 | ||||
Hydroteated light petroleum distillate | 64742-47-8 | 30 | 0.0160178 | 24728 | ||||
Sodium polyacrylate | 9003-04-7 | 1 | 0.000230018 | 356 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.123564 | 1,526,030.0 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000371086 | 573 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.000123695 | 191 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 9.59975 | 14,819,700.0 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002138 | 34 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.0010692 | 1651 | ||||
Acrylic acid | 79-10-7 | 0.01 | 0.00000230 | 4 | ||||
Inorganic salt | Proprietary | 30 | 0.0160178 | 24728 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00641522 | 9904 | ||||
Methanol | 67-56-1 | 60 | 0.00077211 | 1193 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000371086 | 573 | ||||
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
EXCELERATE PS-2 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.71628 | 2,649,530.0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 88.6445 | 136,846,000.0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Gel 1100 | Mountain Supply & Service, LLC | Gelling Agent | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-08-06 | H2O | 15 | 207335 Gal | 237160 | Halliburton | STAGE 70/70
STAGES 2-69 SEE IMAGES |
2018-07-15 | H2O | 15 | 245900 Gal | 241440 | Halliburton | STAGE 1/70
STAGES 2-69 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 2701623 | 0 | 108 |
2019 | ASCENT RESOURCES UTICA LLC | 2579913 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 13024 | 108 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 12320 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0096074304 | 2018-04-25 | Casing String Witnessed | No Violations | Pad address is 640 TOWNSHIP ROAD 107A DILLONVALE 43917. On the day of my inspection I witnessed Precision Rathole had augured a 36 inch diameter hole to a depth of 105 feet. 100 feet of 30 inch diameter conductor casing was run. CJ/Otex was onsite with 310 sacks of class A cement. Additives include 2% CaCl and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% percent excess ran. . Cement was displaced with 75 barrels of fresh water. Cement returned to surface and fell back to 39 feet. Top out schedule for 4/26 morning. Company Man Doug Bennett and Cement supervisor Steven Long onsite. |
0553870233 | 2018-08-01 | Completion Testing | No Violations | On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company man Louis. Halliburton frac crew is onsite and pumping on the 3H well. Stage 50/70 has plug set at 13697, bottom perforation at 13685, and top perforation at 13549. intermediate annular pressure is 686 psi. |
0580380678 | 2018-05-25 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patteron 284 drilling the lateral section of the well at 12744 feet with an 8.5 inch diameter bit. No flare during my inspection. Rig using a mud weight of 13.2 ppg. Kick off point for curve was 9180 feet and landed at 10318 feet. |
0616192158 | 2018-05-09 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Patterson 284 was moving onto location. Mine string was set by falcon 26 and surface remains to be set by this rig. Company man Will was informed I need to be kept abreast of information pertaining to cement job timing. |
0699948282 | 2018-05-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 284 drilling a 12.25 inch diameter hole at 7540 feet. Plan to drill to approximately 8900 feet and set 9.625 inch diameter casing. Casing is being brought onsite during my inspection. Walk around location revealed containment is clean and functioning. |
0858630459 | 2018-04-26 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that cement had dropped back to 39 feet and 10 yards of 9-sack grout was dumped down the backside to surface. The cement level was dropping very slowly and I do not expect another top out will be necessary. I will wait to hear from Company man Doug Bennett on where cement finally sets up at. |
0940217155 | 2018-04-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Prcesion Rathole has augered this hole to a depth of 105 feet. No casing has been run yet and plans to cement all three wells tomorrow. |
1239628531 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I found a Halliburton frac crew on location. This well is on stage 7. Plug is at 21308, bottom perforation at 21296, and top perforation is at 21155. Surface annular pressure is 0 and intermediate is 420. They just finished stimulating this well. ISIP is 6437. Average rate was 74.65 barrels, average pressure was 11155. Breakdown pressure was 8976 at 30 barrel per minute. |
1382470270 | 2018-07-24 | Completion Testing | No Violations | On the day of my inspection I found a Halliburton frac crew on location. This well is on stage 21. Surface annular pressure is 0 and intermediate is 55. Stage 14 was abandoned in this this well because the formation would not accept the sand they were trying to pump. No stimulations occurring while on location. |
1526927341 | 2018-05-21 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the second stage of the intermediate casing cement job. Patterson 284 drilled a 12.25 inch diameter open hole to a depth of 8922 feet. Previous casing set and cemented was 13.375 inch diameter surface (61 lbs/foot) casing at a depth of 1558 feet. Wyoming casing ran 8912 feet of 9.625 inch diameter casing, l-80, 40 lbs/foot. Casing was centralized with 225 centralizers. Shoe track is 83 feet long. DV tool set at 4800 feet. Schlumberger was onsite with 1580 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 30% excess ran in open hole. Cement displaced with 364 barrels of fresh water. 40 barrels of 13 ppg mudpush pumped ahead of cement. 59 barrels of cement returned to surface, and floats held. |
1534344308 | 2018-08-15 | Completion Testing | No Violations | On the day of my inspection I found this pad to contain two wells that have been drilled and fracked. Also one well not drilled below the surface casing. Production equipment includes two 500 barrel steel tanks, two GPUs, two line heaters, and 4 sand seperators. ID to Ascent construction inspector Jordy Bernard. Production equipment and well connect construction is occuring. Surface annular pressure is zero and intermediate annular pressure is 0. Frac plugs have not been drilled out. |
1535557202 | 2018-08-29 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well onlocation with a snubbing unit. Identified myself to Company Man James Edwards. This well has no been drilled out yet. They are tripping out of the 3H. Surface annular pressure is 0 and intermediate annular is 0 psi. |
1596878122 | 2018-08-06 | Completion Testing | No Violations | On the day of my Inspection I witnessed Halliburton frac crew moving off of location. ID to company man Louis. 2 kill plugs were set in this wellbore at 9607 and 9528. Surface and interediate annular pressures are zero. |
For data sources see[10]