If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-24998 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.098024142,"lon":-82.05925629,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Chatham Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: KOSTECKI | |
License Status: Final Restoration | |
License Date: 2005-05-17 | |
Spud Date: 2005-10-04 | |
Spud Drilling Contractor: HARLEY DRLG | |
Final Drill Date: 2005-10-06 | |
Well Total Depth: 305 ft | |
Configuration: Vertical | |
Latitude: 41.098024142 | |
Longitude: -82.05925629 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-05-17 | Proposed Formations:BEREA, Issued Date:5/17/2005, Expired Date:5/17/2006 6:00:00 AM, Drilling unit acres:39.4, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2005-10-04 | RBDMS Rec |
Completed | 2005-10-06 | RBDMS Rec |
Reached Total Depth | 2005-10-06 | RBDMS Rec |
Construction Permit Expires | 2006-05-17 | RBDMS Rec |
Plugged/Abandoned | 2006-08-24 | RBDMS Rec |
Completion Report Received | 2006-09-07 | RBDMS Rec |
Record Last Modified | 2013-03-14 | RBDMS Rec |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | HARLEY DRILLING & PRODUCING LT | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | HARLEY DRILLING & PRODUCING LT | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0010153645 | 2006-12-11 | Final Restoration | No Violations | Called Steve Harley to advise him drilling pit is open. Well was plugged 8-24-2006. Restoration is due in February 2007. Sun, 50 degrees. |
2037463704 | 2007-08-22 | Final Restoration | No Violations | Final restoration approved. P&A 8-24-2006 |
For data sources see[7]