If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-23740 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.153966831,"lon":-81.6508401,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wheeling Township | |
Operator Name: HOPCO RESOURCES INC | |
Well Pad ID: | |
Farm/Lease Name: MCCLELLAN | |
License Status: Producing | |
License Date: 2017-06-22 | |
Spud Date: 1989-03-10 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1989-03-15 | |
Well Total Depth: 4720 ft | |
Configuration: Vertical | |
Latitude: 40.153966831 | |
Longitude: -81.65084010 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1988-03-10 | IP. 1.5 BO & .5 BBL BRINE |
Oil and Gas | 1988-06-15 | Issued Date 6/15/88 Expired Date 6/15/89 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04720 Proposed Drill Depth 04720 |
Completed | 1989-03-15 | IP. 1.5 BO & .5 BBL BRINE |
Reached Total Depth | 1989-03-15 | IP. 1.5 BO & .5 BBL BRINE |
CO | 1989-03-21 | 534 POWER RESOUR OPER CO INC GeoDate 6/15/88 |
Completion Report Received | 1991-02-15 | IP. 1.5 BO & .5 BBL BRINE |
CO | 1992-12-16 | 157 LANDPROVEST INC GeoDate 6/15/88 |
Last Compliance Report | 2008-05-07 | IP. 1.5 BO & .5 BBL BRINE |
APP | 2011-08-03 | Proposed Formations:ORISKANY, Issued Date:8/3/2011, Expired Date:8/2/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Plugged Back | 2011-10-10 | IP. 1.5 BO & .5 BBL BRINE |
APP | 2017-06-22 | Proposed Formations:HELDERBERG LIMESTONE, Issued Date:6/22/2017, Expired Date:6/22/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Change of Owner | 2019-02-26 | Operator changed from 1634, NORTHWOOD ENERGY CORP to 37, HOPCO RESOURCES INC |
Record Last Modified | 2019-02-26 | IP. 1.5 BO & .5 BBL BRINE |
Construction Permit Expires | 2019-06-22 | IP. 1.5 BO & .5 BBL BRINE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-06-28 | 3144 | 3168 | 54 |
1997-06-29 | 4494 | 4582 | 0 |
2006-09-11 | 4517 | 4581 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-01-30 | H2O | 20 | 39052 Gal | 5700 | Producers Service Corporation | NOTE ON WCR: WELL WAS BROKE DOWN ON 11/2/11 THEN CIRCULATED, PAD WAS PERFORMED ON 12/7/11 W/ 2 7/8" ON PACKER THEN PACKER FAILED, REMAINDER OF PAD AND SAND WAS DONE ON 1/30/12 |
H2O | 0 | 2400 Bbl | 50000 | N2 FOAM FRAC | ||
2011-12-07 | H2O | 20 | 17588 Gal | 5700 | Producers Service Corporation |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0289847603 | 2007-09-28 | Production Wells | No Violations | PRODUCING WELL |
0685906729 | 2004-10-14 | Production Wells | No Violations | STATUS CHECK, RECORDS SHOW NO PRODUCTION RECORDED SINCE 2002. |
1477890261 | 2006-12-19 | Production Wells | No Violations | ID REPOSTED |
1532207092 | 2017-01-23 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included a 100 barrel tank, a 50 barrel tank, a horizontal separator, a drip and a 2 inch salesmeter with a .125 inch orifice all within an earthen dike. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 2.875 inch diameter tubing reduced to a 1 inch flowline with valves open on the 2.875 tubing and closed on the flowline. Also present near the well a disconnected 100 barrel tank. No identification was present and production records were current with zero production reported since 2013. I contacted Northwood Energy and requested a plan for the well. |
1567841804 | 2008-03-10 | Production Wells | No Violations | PRODUCING WELL |
1937335389 | 2006-11-03 | Production Wells | No Violations | PRODUCING WELL |
For data sources see[9]