If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-23579 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.183597372,"lon":-81.27837613,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Ravenna Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: WEBB UNIT | |
License Status: Producing | |
License Date: 1986-12-31 | |
Spud Date: 1987-01-27 | |
Spud Drilling Contractor: EDCO DRLG | |
Final Drill Date: 1987-02-02 | |
Well Total Depth: 4360 ft | |
Configuration: Vertical | |
Latitude: 41.183597372 | |
Longitude: -81.27837613 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1987-01-27 | CHG. ACG. 3-21-87 |
Completed | 1987-02-02 | CHG. ACG. 3-21-87 |
Reached Total Depth | 1987-02-02 | CHG. ACG. 3-21-87 |
Completion Report Received | 1987-03-12 | CHG. ACG. 3-21-87 |
Record Last Modified | 2017-02-15 | CHG. ACG. 3-21-87 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1998-09-22 | 4182 | 4244 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 102000 Gal | 64000 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0229217488 | 2018-04-19 | UrbanProduction Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the well equipped with 2.375 rods and tubing and operating with the aid of an electric powered pumping unit. A gauge on the 4.5 production casing indicates a pressure of 40psi. This well produces to a diked tank battery on location and contains one (1) 140 barrel tank, a concrete brine vault, and a horizontal separator. There is a domestic tap and meter on the separator sales line and the required ID is posted at the wellhead and at the tank battery. This well was drilled pre-HB278 and its location does not require compliance with urban rules at this time. No violations. |
For data sources see[9]