If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24220 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.08334932,"lon":-81.1575023,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Edinburg Township | |
Operator Name: C & T ENERGY OF EAST CANTON IN | |
Well Pad ID: | |
Farm/Lease Name: EHASZ | |
License Status: Final Restoration | |
License Date: 2000-03-23 | |
Spud Date: 1998-12-09 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 1998-12-22 | |
Well Total Depth: 7580 ft | |
Configuration: Vertical | |
Latitude: 41.083349320 | |
Longitude: -81.15750230 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1998-11-23 | Proposed Formations:KNOX (MAY NOT PRODUCE CLINTON), Issued Date:11/23/98, Expired Date:11/23/99 6:00:00 AM, Drilling unit acres:44.55, Proposed Well Type:OG, Proposed Well Class:EOUT |
Original Spud | 1998-12-09 | DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99 |
Completed | 1998-12-22 | DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99 |
Reached Total Depth | 1998-12-22 | DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99 |
Completion Report Received | 1999-06-21 | DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99 |
Change of Owner | 1999-10-28 | Operator changed from 4884, EASTERN STATES OIL & GAS INC to 4969, C & T ENTERPRISES |
APP | 2000-03-23 | Proposed Formations:ROSERUN, Issued Date:3/23/00, Expired Date:3/23/01 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2000-06-05 | DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99 |
Construction Permit Expires | 2001-03-23 | DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99 |
Record Last Modified | 2013-03-14 | DRY HOLE: TO BE PLUGGED PER EASTERN STATES 9/24/99 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1999-09-24 | 7334 | 7343 | 28 |
1999-09-24 | 7366 | 7374 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 1251 Bbl | 62000 | 500 GALLONS HCL ACID |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
iDIAN00560 | 2000-09-13 | Final Restoration | No Violations |
For data sources see[5]