If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22634 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.643213077,"lon":-81.0746968,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Washington Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: US-OH-001172 | |
Farm/Lease Name: KIKO UNIT | |
License Status: Producing | |
License Date: 2014-11-07 | |
Spud Date: 2014-11-16 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2015-02-12 | |
Well Total Depth: 13464 ft | |
Configuration: Horizontal | |
Latitude: 40.643213077 | |
Longitude: -81.07469680 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-07 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/7/2014, Expired Date:11/6/2016 12:00:00 PM, Drilling unit acres:349.09, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-02-12 | |
Correction to Well | 2015-04-24 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2016-03-18 | change in target per as drilled plat ALE |
Completion Report Received | 2016-06-15 | |
Construction Permit Expires | 2016-11-06 | |
Change of Owner | 2018-10-03 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC |
Record Last Modified | 2018-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-02-10 | 7884 | 13426 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/18/2015 | 12/06/2015 | 7565 | 10,609,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid (7.5%) | PVS | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.140117 | 144710 |
Water | 7732-18-5 | 92.5 | 1.7281 | 1,784,750.0 | ||||
TEA Breaker Activater | Sagar Enterprise | Gel Breaker | Triethanolamine | 102-71-6 | 72.5 | 0.00053827 | 555.916 | |
Diethanolamine | 111-42-2 | 13 | 0.00009652 | 99.681 | ||||
Chlorine Dioxide | Baker Hughes | Biocide | Chlorine Dioxide | 10049-04-4 | 0.3 | 0.001509 | 1333.08 | |
ECM FR Pro 200 | ECM Supply | Friction Reducer | Other - (non-hazardous) | NA | 75 | 0.0536918 | 55451.9 | |
Petroleum Distillate Hydrotreated Light | 64742-47-8 | 25 | 0.0178973 | 18484 | ||||
AP Breaker | Sagar Enterprise | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00004260 | 44 | |
Scaletrol 767W | Baker Hughes | Scale Inhibitor | Ammonium Chloride | 12125-02-9 | 1 | 0.000195 | 172.578 | |
Water | 7732-18-5 | 75 | 0.014647 | 12943.4 | ||||
Methanol | 67-56-1 | 30 | 0.005859 | 5177.34 | ||||
Oraganophosphonate | 129828-36-0 | 15 | 0.002929 | 2588.67 | ||||
Sand (Proppant) | Sargent/Momentive/Preffered | Proppant | Silica Substrate | 14808-60-7 | 100 | 12.4397 | 12,847,500.0 | |
Slurry Gel, WGA-7 SLR | PolyFrac Plus | Gel | Surfactant | 154518-36-2 | 5 | 0.000157785 | 162.957 | |
Petroleum Distillate | 64742-47-8 | 45 | 0.00142006 | 1466.61 | ||||
Clay | 14808-60-7 | 5 | 0.000157785 | 162.957 | ||||
Guar Gum | 9000-30-0 | 45 | 0.00142006 | 1466.61 | ||||
Water | Rex Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.6157 | 88,422,300.0 | |
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Short Chained Glycol Ether | 112-34-5 | 60 | 0.000499121 | 515.483 | |
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000291154 | 300.699 | ||||
Methanol | 67-56-1 | 5 | 0.00004159 | 42.957 | ||||
Thiourea | 62-56-6 | 1 | 0.00000832 | 8.591 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000832 | 8.591 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000832 | 8.591 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-12-06 | H2O | 0 | 6754 Bbl | 0 | Universal Well Services Inc. | STAGE 37/37
60 SHOTS |
2015-11-11 | H2O | 0 | 2934 Bbl | 0 | Universal Well Services Inc. | STAGE 1/37
60 SHOTS STAGES 2-36 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | R E GAS DEVELOPMENT LLC | 510392 | 45708 | 305 |
2017 | R E GAS DEVELOPMENT LLC | 375727 | 20431 | 360 |
2018 | PENNENERGY RESOURCES LLC | 298983 | 30770 | 350 |
2019 | PENNENERGY RESOURCES LLC | 63347 | 2158 | 89 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | R E GAS DEVELOPMENT LLC | Brine | 21742 | 305 |
2017 | R E GAS DEVELOPMENT LLC | Brine | 7066 | 360 |
2018 | PENNENERGY RESOURCES LLC | Brine | 6667 | 350 |
2019 | PENNENERGY RESOURCES LLC | Brine | 1363 | 89 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0360097744 | 2018-06-27 | Production Wells | No Violations | I conducted a status check of the well and production pad. The pad is equipped with three producing wells (permit numbers 22634, 22635, & 22637). This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped with a pressure-relief valve and a pressure gauge which displayed a reading of zero psi. Proper identification was posted. The tanks and production equipment were contained inside a steel lined steel dike. Less than an inch of standing water was present in areas inside the tank battery. The access road was in good condition. Erosional controls were in place and appeared functioning.
Equipment on the pad consisted of the following: Nine 400 bbl production tanks; six labelled as containing condensate and three as containing produced water Three gas processing units with vertical separators Two combustor units Three vapor recovery units One oil stabilization unit and tower |
0600579127 | 2015-01-28 | Casing String Witnessed | No Violations | I was on the Kiko # 5 - H location to observe the cementing of the 13.375 surface casing on 1/28/2015. Sidewinder Drilling Rig # 63 drilled a 17.5 borehole from 120 to 1020. The borehole made 1116 barrels of water from 763 to 1020 and was finished on fluid. The casing was placed in the borehole to 998. Universal Well Services cemented the casing with 841 sacks of Class A blended with 3 % CaCl2, 0.25% lbs. / sack of celloflake. Displacement was achieved with 147 barrels of water and a top plug. Once the plug landed the pressure was increased to 1005 psi and held for 5 minutes without any loss. Ater bleeding the pressure off 1 barrel of fluid flowed back and stopped. All floats held. A walk around inspection revealed no violations. |
1134976770 | 2015-01-31 | Casing String Witnessed | No Violations | While on location to witness the 9.625 casing cement job I was informed that 20 gallons of recycled water was spilled outside of the frac tank containment and 28 gallons were spilled insde the containment. The spill occurred while Stallion Services was loading drill water for disposal. A hose failure led to the release. The release consisted of fresh water used for drilling the intermediate section of the borehole. I prescribed that the water ( now frozen ) be mixed with the cedar dust and placed into the half round solids tank for disposal. Upon the completion of the cement job an examination of the area indicated that the previous spill had been remedied. No violation at this time. |
1810202791 | 2015-02-02 | Drill / Deepen / Reopen | No Violations | I was on the Kiko # 5 - H to observe the status of the drilling progress. Sidewinder Drilling Rig # 63 was drilling a 8.75 @ 4083 KB. A walk around inspection revealed the previous ( 1/31/2015 ) release was cleaned up and no reoccurrences had taken place. A blind flange was missing from the SOBM tank # FT - 0029. I brought this matter to Aaron Wilhite ( R E Gas Development company man ) who had it replaced. No violations observed. |
1874675695 | 2015-01-31 | Casing String Witnessed | No Violations | I was on the Kiko # 5 - H well to witness the cementing of the 9.625 intermediate casing. Sidewinder Drilling Rig # 63 drilled a 12.25 borehole to 2,020 KB. KCS ran 52 joints of 9.625 casing to 2009. Universal Well Services mixed and displaced a cement slurry comprised of Gas Block, 2% CaCl2, 0.15% CR - 3 through the interval 2009 to surface with 20 barrels of cement slurry returned back to surface. Mix water temperature was 54 F and pH was 7. |
2091652321 | 2014-11-16 | Casing String Witnessed | No Violations | I was on the Kiko # 5 - H location to witness the placement and cementing of the 20 conductor casing. H A D Inc. drilled a 22.25 borehole to 110 GL with an Air Rotary drilling rig. H A D Inc. placed 108 ( 6 joints ) 20, 88 lbs. / foot, welded joint casing into the borehole. The conductor casing had circulation windows cut into the pipe up 5 from the bottom ( 103 ) for the placement of the cement slurry. Universal Well Services ( UWS ) connected to the casing and established circulation by pumping 10 barrels of fresh water ahead. UWS mixed and circulated a cement slurry back to surface. Mix water temperature was 39 degrees and ph was 7. The cement slurry consisted of 110 sacks of Type 1 with 3% CaCl2 ( blended ). I observed 5 barrels of cement slurry returned back to surface. |
For data sources see[10]