If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 31-029-30007 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":42.606667,"lon":-78.897626,"icon":""}]} |
Well Name: Guadagno Unit #1 | |
Country: United States | |
State: New York | |
County: Erie | |
Municipality: North Collins | |
Operator Name: | |
Well Status: Active | |
Spud Date: 2012-01-16 | |
Permit Date: 2011-12-28 | |
Well Completion Date: 2012-02-09 | |
Configuration: Vertical | |
Measured Well Depth (ft): 2477 | |
Latitude: 42.606667000 | |
Longitude: -78.89762600 |
For data sources see[1]
Period | Operator Name | Fluid Type | Fluid Quantity | Fluid Production Time |
---|---|---|---|---|
2012 | U. S. Energy Development Corporation | GAS | 5937 Mcf | 11 Months |
2012 | U. S. Energy Development Corporation | OIL | 0 Bbl | 11 Months |
2013 | U. S. Energy Development Corporation | GAS | 2824 Mcf | 12 Months |
2013 | U. S. Energy Development Corporation | OIL | 0 Bbl | 12 Months |
2014 | U. S. Energy Development Corporation | GAS | 1780 Mcf | 12 Months |
2014 | U. S. Energy Development Corporation | OIL | 0 Bbl | 12 Months |
2015 | U. S. Energy Development Corporation | GAS | 1327 Mcf | 12 Months |
2015 | U. S. Energy Development Corporation | OIL | 0 Bbl | 12 Months |
2016 | U. S. Energy Development Corporation | GAS | 1306 Mcf | 9 Months |
2016 | U. S. Energy Development Corporation | OIL | 0 Bbl | 9 Months |
2017 | U. S. Energy Development Corporation | GAS | 1414 Mcf | 12 Months |
2017 | U. S. Energy Development Corporation | OIL | 0 Bbl | 12 Months |
2018 | U. S. Energy Development Corporation | GAS | 1013 Mcf | 5 Months |
2018 | U. S. Energy Development Corporation | OIL | 0 Bbl | 5 Months |
For data sources see[2]
Period | Operator | Waste Type | Quantity | Time Produced |
---|---|---|---|---|
2012 | U. S. Energy Development Corporation | WATER | 109 Bbl | 11 Months |
2013 | U. S. Energy Development Corporation | WATER | 135 Bbl | 12 Months |
2014 | U. S. Energy Development Corporation | WATER | 80 Bbl | 12 Months |
2015 | U. S. Energy Development Corporation | WATER | 40 Bbl | 12 Months |
2016 | U. S. Energy Development Corporation | WATER | 32 Bbl | 9 Months |
2017 | U. S. Energy Development Corporation | WATER | 0 Bbl | 12 Months |
2018 | U. S. Energy Development Corporation | WATER | 0 Bbl | 5 Months |
For data sources see[2]
Event Date | Event Description |
---|---|
2011-12-28 | New Permit Issued. |
For data sources see[1]