If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-033-26030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.004626,"lon":-78.770556,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Brady Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: GRAPE 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2006-02-27 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.004626 | |
Longitude: -78.770556 |
Date | Event |
---|---|
2006-02-27 | New Permit Application |
2006-11-24 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2004 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2005 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | DANNIC ENERGY CORP | 1,755.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2008 | DANNIC ENERGY CORP | 687.11 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 809.14 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 531.06 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 86.31 | 273 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 134.88 | 274 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 128.37 | 273 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 120.00 | 273 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 104.88 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 126.00 | 214 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 203.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 63.86 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | DANNIC ENERGY CORP | Produced Fluid | 324.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | DANNIC ENERGY CORP | Produced Fluid | 169.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2011 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2015 | DANNIC ENERGY CORP | Produced Fluid | 3,360.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2017 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]