If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-033-26998 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.090114,"lon":-78.531649,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Pine Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 144573 | |
Farm/Lease Name: DCNR TRACT 323 P-2 | |
License Status: Plugged and Abandoned | |
Spud Date: 2011-07-22 | |
Permit Date: 2011-03-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 41.090114 | |
Longitude: -78.531649 |
Date | Event |
---|---|
2011-03-17 | New Permit Application |
2011-07-19 | Performed Spud Operation |
2011-10-09 | Drilling Completion |
2011-11-03 | Perforation |
2011-11-03 | Performed Stage 1 of Stimulation |
2011-11-03 | Performed Stage 2 of Stimulation |
2011-11-04 | Perforation |
2011-11-04 | Performed Stage 3 of Stimulation |
2011-11-04 | Performed Stage 4 of Stimulation |
2011-11-04 | Performed Stage 5 of Stimulation |
2011-11-04 | Performed Stage 6 of Stimulation |
2011-11-05 | Perforation |
2011-11-05 | Performed Stage 10 of Stimulation |
2011-11-05 | Performed Stage 7 of Stimulation |
2011-11-05 | Performed Stage 8 of Stimulation |
2011-11-05 | Performed Stage 9 of Stimulation |
2011-11-06 | Perforation |
2011-11-06 | Performed Stage 11 of Stimulation |
2011-11-06 | Performed Stage 12 of Stimulation |
2012-09-28 | DEVIATED |
2014-11-18 | NEWLY DRILLED |
2019-02-12 | Inactive Well Request Granted |
2019-08-26 | Begin Plugging |
2019-09-04 | Finished Plugging |
2020-01-13 | Fully Plugged |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-11-03 | 2011-11-03 | 7,133 | 4,637,003 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 3 HCl Acid | Calfrac Well Services | Perforation Breakdown | Hydrochloric acid | 7647-01-0 | 100.00 | 0.73 | |
DAP-923 | Calfrac Well Services | Corrosion Inhibitor | Olefin | 5.00 | 0.00006000 | |||
Polyoxyalkylenes | 30.00 | 0.00039000 | ||||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00039000 | |||||
Methanol | 67-56-1 | 60.00 | 0.00078000 | |||||
Fatty acids | 30.00 | 0.00039000 | ||||||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00013000 | |||||
Water | Base Fluid | Water | 100.00 | 85.86 | ||||
DAP-901 | Calfrac Well Services | Scale Inhibitor | Organic phosphonate | 30.00 | 0.00564000 | |||
Amine salt | 5.00 | 0.00094000 | ||||||
Oxyalkylated polyamine | 5.00 | 0.00094000 | ||||||
Phosphoric acid ammonium salt | 5.00 | 0.00094000 | ||||||
Methanol | 67-56-1 | 30.00 | 0.00564000 | |||||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00188000 | |||||
DWP-944 | Calfrac Well Services | Biocide | Polyethylene glycol | 25322-68-3 | 70.00 | 0.02 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
DAP-103 | Calfrac Well Services | Iron Control | Citric acid | 77-92-9 | 60.00 | 0.00324000 | ||
DWP-612 | Calfrac Well Services | Friction Reducer | No Hazardous Materials | 100.00 | 0.08 | |||
Sand (Proppant) | Calfrac Well Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 13.23 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-11-03 | 1 | Silica Sand | 5,406,880 | 7,406 | 0 |
2011-11-03 | 2 | Silica Sand | 5,406,880 | 7,353 | 0 |
2011-11-04 | 3 | Silica Sand | 5,406,880 | 7,440 | 0 |
2011-11-04 | 4 | Silica Sand | 5,406,880 | 8,204 | 0 |
2011-11-04 | 5 | Silica Sand | 5,406,880 | 7,785 | 0 |
2011-11-04 | 6 | Silica Sand | 5,406,880 | 7,436 | 0 |
2011-11-05 | 7 | Silica Sand | 5,406,880 | 7,781 | 0 |
2011-11-05 | 8 | Silica Sand | 5,406,880 | 7,669 | 0 |
2011-11-05 | 9 | Silica Sand | 5,406,880 | 7,521 | 0 |
2011-11-05 | 10 | Silica Sand | 5,406,880 | 7,657 | 0 |
2011-11-06 | 11 | Silica Sand | 5,406,880 | 7,220 | 0 |
2011-11-06 | 12 | Silica Sand | 5,406,880 | 7,545 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 12,243.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 1,739.05 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2017 | EXCO RESOURCES PA LLC | Synthetic Liner Materials | 55.36 Tons | LANDFILL | 101397 |
2019 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 850.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1970110 | Primary Facility | 2011-05-03 | Compliance Evaluation | No Violations Noted | |
1988415 | Primary Facility | 2011-07-18 | Compliance Evaluation | No Violations Noted | |
1990857 | Primary Facility | 2011-07-28 | Incident- Response to Accident or Event | Pending | |
1991860 | Primary Facility | 2011-08-01 | Compliance Evaluation | No Violations Noted | |
1994348 | Primary Facility | 2011-08-09 | Compliance Evaluation | No Violations Noted | |
2002458 | Primary Facility | 2011-09-14 | Compliance Evaluation | No Violations Noted | |
2006040 | Primary Facility | 2011-09-28 | Compliance Evaluation | No Violations Noted | |
2028179 | Primary Facility | 2011-12-20 | Routine/Complete Inspection | No Violations Noted | |
2042935 | Primary Facility | 2012-02-15 | Routine/Complete Inspection | No Violations Noted | Cellar was bubbling heavily; OGI Andrew Albert informed 2/15/12 |
2060287 | Primary Facility | 2012-04-18 | Routine/Complete Inspection | No Violations Noted | |
2070883 | Primary Facility | 2012-05-22 | Routine/Complete Inspection | No Violations Noted | |
2070886 | Primary Facility | 2012-05-23 | Routine/Complete Inspection | No Violations Noted | |
2070888 | Primary Facility | 2012-05-24 | Routine/Complete Inspection | No Violations Noted | |
2119975 | Primary Facility | 2012-12-03 | Routine/Complete Inspection | No Violations Noted | |
2121930 | Primary Facility | 2012-12-07 | Follow-up Inspection | No Violations Noted | |
2178532 | Primary Facility | 2013-06-27 | Routine/Complete Inspection | No Violations Noted | |
2189924 | Primary Facility | 2013-08-08 | Routine/Complete Inspection | No Violations Noted | |
2266429 | Primary Facility | 2014-04-29 | Routine/Complete Inspection | No Violations Noted | |
2338465 | Primary Facility | 2015-01-26 | Routine/Complete Inspection | No Violations Noted | |
2380965 | Primary Facility | 2015-06-22 | Routine/Complete Inspection | No Violations Noted | |
2443455 | Primary Facility | 2016-01-26 | Routine/Complete Inspection | No Violations Noted | |
2492697 | Primary Facility | 2016-06-14 | Routine/Complete Inspection | No Violations Noted | |
2506054 | Primary Facility | 2016-07-28 | Routine/Complete Inspection | No Violations Noted | |
2513680 | Primary Facility | 2016-08-24 | Routine/Complete Inspection | No Violations Noted | |
2562914 | Primary Facility | 2017-02-16 | Routine/Complete Inspection | No Violations Noted | |
2765899 | Primary Facility | 2018-08-14 | Routine/Complete Inspection | No Violations Noted | Department representatives Sue Herzing, Sara Metz, and Mike Jurbala conducted a routine site inspection at Exco Resources COP Tract 323 Pad 2 on August 14, 2018. The site sign, weekly E&S inspection log, and ESCGP were onsite for review.
The freshwater impoundment (FWI) was restored and PCSMs installed during the Summer of 2017. All disturbed and/or restored areas have been seeded and mulched. We observed regraded soils in the rain garden. The rain garden has been reseeded and mulched. Fencing has been installed surrounding the restored FWI. No trees have been planted in the restored impoundment area to date per the agreement between DCNR and EXCO. A few bare spots with little to no vegetation were observed near the restored FWI fence. The Department recommends spot seeding those sections. There is one drilled Marcellus well (033-26998) onsite. According the the Departments efacts records this well was granted regulatory inactive status (RIS) on February 8, 2013; therefore this status has expired on Fe |
2774184 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | The weather is 70 Deg. F, cloudy at time of inspection. Routine inspection of EXCO Resources PA LLC., DCNR Tract 323 P-2 Pad, Well # 31H on September 12, 2018. There is 1 well on location, currently in regulatory inactive status. Inactive Well Status has been granted on 02/02/2013, expired on 02/08/2018. Well was shut in upon arrival to location. After opening valves, pressure gauge on the top of the production xmas tree reads 3,840 PSI, backside casing pressure gauge reads 1,336 PSI. Annulus (9-5/8¿ x 4-1/2¿) was opened and vented into a tank, pressure gauge reads 0 PSI, another annulus (13-3/8¿ x 9-5/8¿) was open and shut into a pressure gauge, that also reads 0 PSI. 0% combustible gas was detected in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection.
EXCO Resources, LLC. Representative ¿ Sam Unch, Production Operator and Brian Rushe, Regulatory Manager. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. |
2854181 | Primary Facility | 2019-03-14 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at EXCO Resources PA LLC COP Tract 323 Pad 2 on March 14, 2019.
The freshwater impoundment (FWI) was restored and PCSMs installed during the Summer of 2017. The restored FWI is surrounded by a fence enclosure per the PCSM plans. Trees have been planted within the restored FWI fence enclosure per the agreement with EXCO and DCNR. All previously disturbed and/or restored areas have been seeded and mulched. The overall site is mostly snow covered. The rain garden is nearly full to the top with water and ice/snow covered. The trash rack was covered debris. The Department recommends removing the debris on the track rack as outlined in your long term operation and maintenance plan. Large amounts of water and ice were observed on the well pad. As recommended in previous inspections reports but myself, I recommend regrading the well pad so ponded flows off the well pad into the designed PCSMs. There is one drilled Marcellus well (033-2699 |
For data sources see[9]