If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-27039 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.934581,"lon":-80.354375,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Center Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 152379 | |
Farm/Lease Name: WILEY 15H | |
License Status: | |
Spud Date: | |
Permit Date: 2016-01-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.934581 | |
Longitude: -80.354375 |
Date | Event |
---|---|
2016-01-27 | New Permit Application |
2016-08-23 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | VANTAGE ENERGY APPALACHIA II LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 615,951.32 | 81 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 2,766,368.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 1,601,037.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 242.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 172.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 214.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 82.94 Tons | LANDFILL | 100620 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 316.33 Tons | LANDFILL | 100172 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Servicing Fluid | 1.60 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 227.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 1.66 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Waste Water Treatment Sludge | 20.75 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 11.06 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 107.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 7.10 Tons | LANDFILL | 100172 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 58.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1.50 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 4.43 Tons | LANDFILL | 100620 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Synthetic Liner Materials | 5.56 Tons | LANDFILL | 100663 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Filter Socks | 0.45 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 133.06 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2017 | RICE DRILLING B LLC | Produced Fluid | 17.78 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 3,912.72 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 298.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 142.81 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1,743.83 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Drill Cuttings | 58.33 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Produced Fluid | 1.39 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2017 | RICE DRILLING B LLC | Produced Fluid | 33.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2014-4 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 578.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Unused Fracturing Fluid Waste | 2.32 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid | 54.58 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Other Oil & Gas Wastes | 952.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil | 0.01 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Produced Fluid | 24.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 39.79 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Soil Contaminated by Oil & Gas Related Spills | 0.01 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 1,429.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Drilling Fluid Waste | 50.00 Bbl | REUSE (AT WELL PAD) | |
2017 | VANTAGE ENERGY APPALACHIA II LLC | Produced Fluid | 1,051.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 83.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 181.10 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 1,872.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 25.12 Bbl | INJECTION DISPOSAL WELL | 34-009-23823 |
2018 | RICE DRILLING B LLC | Produced Fluid | 31.73 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | RICE DRILLING B LLC | Produced Fluid | 12.67 Bbl | INJECTION DISPOSAL WELL | 34-105-23619 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 115.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Produced Fluid | 914.98 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Produced Fluid | 24.31 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2019 | RICE DRILLING B LLC | Produced Fluid | 64.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 85.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | RICE DRILLING B LLC | Produced Fluid | 152.68 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 324.47 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 3,047.14 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Produced Fluid | 121.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes | 45.83 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2515611 | Primary Facility | 2016-08-31 | Drilling/Alteration | No Violations Noted | Well spud on 8/24/2016. Operator drilled 30-inch borehole and set 24-inch conductor pipe at 40 ft. Conductor pipe cemented in place. |
2528076 | Primary Facility | 2016-09-26 | Drilling/Alteration | No Violations Noted | Rig WSG #3. Operator drilled a 23-inch borehole to 570’ and set 550’ of 18 5/8” of surface casing. Surface casing was cemented to the surface by the displacement method. Operator reported no issues noted during cementing. 20 bbls of cement circulated to the surface. Floats held. |
2528081 | Primary Facility | 2016-09-26 | Drilling/Alteration | No Violations Noted | Rig WSG #3. Operator drilled a 17 ½” borehole to 1,328’ and set 1,308’ of 13 3/8” of coal protective casing. Coal protective casing was cemented to the surface by the displacement method. 35 bbls of cement circulated to the surface. Floats held. |
2576332 | Primary Facility | 2017-03-08 | Routine/Complete Inspection | No Violations Noted | On March 8, 2017, the department performed an inspection of Vantage/Rice Energy Wiley well pad site with Joel Keller (DEP). The site is located in Center Township, Greene county. The inspection was performed as a routine inspection during completion of drilling on the wells on site.
The act 9 sign was in place and legible. The site is stable with greater than 70% vegetative cover. The PCSM structures are in place. The operator is currently moving the larger rig off site because the nine wells have been drilled TD. The operator is currently tearing down drilling equipment on site for a move to the Rice Energy Cholak well pad. Site inspection indicated some small spills on the well pad during drilling activity which the operator will need to remediate and clean up. |
2700276 | Primary Facility | 2018-03-02 | Routine/Complete Inspection | No Violations Noted | Well is properly identified and equipped for production. Annuli open. Well is producing and flowed through sand separator. 18 flowback tanks on site in intact containment. Nine gas production units on site. Gas production units not located in containment. |
For data sources see[7]