If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-083-56300 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.773489,"lon":-78.697053,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Lafayette Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: YOUNG PINE RUN 4074 | |
License Status: | |
Spud Date: | |
Permit Date: 2013-09-23 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.773489 | |
Longitude: -78.697053 |
Date | Event |
---|---|
2013-09-23 | New Permit Application |
2013-11-12 | Performed Spud Operation |
2013-11-14 | Drilling Completion |
2014-05-14 | Perforation |
2014-08-27 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 498.00 | 165 | 133.90 | 165 | 26.67 | 165 |
2015 | CATALYST ENERGY INC | 570.85 | 274 | 228.15 | 274 | 25.74 | 274 |
2016 | CATALYST ENERGY INC | 160.5 | 274 | 115.29 | 274 | 5.45 | 274 |
2017 | CATALYST ENERGY INC | 390.75 | 365 | 190.06 | 365 | 13.75 | 365 |
2018 | CATALYST ENERGY INC | 942.67 | 365 | 272.87 | 365 | 30.77 | 365 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 694.58 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 694.58 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 43.33 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2015 | CATALYST ENERGY INC | Produced Fluid | 232.84 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 145.24 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2015 | CATALYST ENERGY INC | Produced Fluid | 232.84 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 43.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 204.17 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | CATALYST ENERGY INC | Produced Fluid | 18.33 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 8.33 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 25.00 Bbl | ROAD SPREADING | |
2016 | CATALYST ENERGY INC | Produced Fluid | 94.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | CATALYST ENERGY INC | Produced Fluid | 8.33 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2017 | CATALYST ENERGY INC | Produced Fluid | 8.33 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 212.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | CATALYST ENERGY INC | Produced Fluid | 171.67 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 74.44 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 108.33 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 36.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2018 | CATALYST ENERGY INC | Produced Fluid | 313.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 281.67 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 51.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
2019 | CATALYST ENERGY INC | Produced Fluid | 45.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2222275 | Primary Facility | 2013-11-15 | Routine/Complete Inspection | No Violations Noted | |
2228931 | Primary Facility | 2013-12-10 | Administrative/File Review | No Violations Noted | |
2286416 | Primary Facility | 2014-07-07 | Site Restoration | No Violations Noted | |
2286418 | Primary Facility | 2014-07-07 | Site Restoration | No Violations Noted | |
2289793 | Primary Facility | 2014-07-28 | Administrative/File Review | No Violations Noted |
For data sources see[7]