X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-27553

Well Details

Well ID: 37-059-27553
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Aleppo Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 149520
Farm/Lease Name: WALTER STINGER 12
License Status:
Spud Date: 2017-12-28
Permit Date: 2017-11-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.802225
Longitude: -80.501639

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-11-29 New Permit Application
2017-12-28 Performed Spud Operation
2018-07-18 Drilling Completion

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-30 2018-09-16 7,888 17,728,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Keane Carrier/Base Fluid Water 7732-18-5 100 84.9273 147,942,000.0
Methanol 67-56-1 90 0.000135781 236.528
Non-hazardous substances proprietary 90 0.0118387 20622.9
Bis(HexaMethylene Triamine Penta(Methylene
Phosphonic Acid)(BHMT)
34690-00-1 10 0.00131542 2291.43
Guar gum 9000-30-0 60 0.00001722 30.002
Ethylbenzene 100-41-4 1 0.00000151 2.628
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.019051 33186.5
Trade secret Proprietary 10 0.00000287 5
Prop-2-yn-1-ol 107-19-7 5 0.00000754 13.14
Xylene 1330-20-7 5 0.00000754 13.14
Isopropyl alcohol 67-63-0 5 0.00000754 13.14
Prop-2-yn-1-ol 107-19-7 5 0.00000754 13.14
Copolymer of 2-propenamide 69418-26-4 20 0.000570695 994.14
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00005707 99.414
Alcohols, C7-9-Iso-, C8-rich 68526-83-0 5 0.00000754 13.14
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.00001722 30.002
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00317517 5531.08
Didecyl dimethyl ammonium chloride 7173-51-5 3 0.000265992 463.353
oleic acid diethanolamide 93-83-4 2 0.00005707 99.414
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00005707 99.414
Non-hazardous substances proprietary 90 0.00797976 13900.6
Glutaraldehyde 111-30-8 20 0.00177328 3089.02
Alcohols, C7-9-Iso-, C8-rich 68526-83-0 5 0.00000754 13.14
Guar gum 9000-30-0 60 0.00001722 30.002
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.00001722 30.002
Alkyl dimethyl benzyl ammonium chloride 68391-01-5 3 0.000265992 463.353
Fatty imidazoline 61790-69-0 5 0.00000754 13.14
Xylene 1330-20-7 5 0.00000754 13.14
Non-hazardous substances proprietary 90 0.0118387 20622.9
oleic acid diethanolamide 93-83-4 2 0.00005707 99.414
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.000570695 994.14
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.000570695 994.14
Fatty imidazoline 61790-69-0 5 0.00000754 13.14
Copolymer of 2-propenamide 69418-26-4 20 0.000570695 994.14
Trade secret Proprietary 10 0.00000287 5
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.00317517 5531.08
Hydrochloric Acid 7647-01-0 15 0.0164022 28572.3
Ethylbenzene 100-41-4 1 0.00000151 2.628
Silica Substrate 14808-60-7 100 14.8748 25,911,500.0
Bis(HexaMethylene Triamine Penta(Methylene
Phosphonic Acid)(BHMT)
34690-00-1 10 0.00131542 2291.43
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.019051 33186.5
Hydrochloric Acid (15%) Keane Acidizing Listed Below
Sand (Proppant) Keane Proppant Listed Below
KAI-12 Keane Acid Inhibitor Listed Below
Clearal 268 ChemStream Biocide Listed Below
KFR-23 Keane Friction reducer Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 50 0.00142674 2485.35
StimSTREAM FR 9700 ChemStream Friction reducer Listed Below
KWG-11L Keane Gel Water 7732-18-5 50 0.00142674 2485.35
StimSTREAM SC-398 ChemStream Scale Inhibitor Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2018 RICE DRILLING B LLC 919,012.00 52 0.00 0 0.00 0
2019 RICE DRILLING B LLC 2,724,944.00 354 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 RICE DRILLING B LLC Other Oil & Gas Wastes 1.00 Bbl REUSE (AT WELL PAD)
2017 RICE DRILLING B LLC Drilling Fluid Waste 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Drill Cuttings 212.87 Tons LANDFILL 100172
2018 RICE DRILLING B LLC Produced Fluid 653.43 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Drill Cuttings 1,180.40 Tons LANDFILL 100419
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 313.34 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Filter Socks 0.75 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2018 RICE DRILLING B LLC Waste Water Treatment Sludge 12.00 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 235.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 115.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 RICE DRILLING B LLC Produced Fluid 91.56 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 RICE DRILLING B LLC Soil Contaminated by Oil 0.28 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 11.34 Tons LANDFILL 100277
2018 RICE DRILLING B LLC Produced Fluid 655.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 RICE DRILLING B LLC Synthetic Liner Materials 95.28 Tons LANDFILL 100419
2018 RICE DRILLING B LLC Drilling Fluid Waste 1,480.00 Bbl REUSE (AT WELL PAD)
2018 RICE DRILLING B LLC Soil Contaminated by Oil & Gas Related Spills 0.28 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2018 RICE DRILLING B LLC Other Oil & Gas Wastes 7.76 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 RICE DRILLING B LLC Produced Fluid 177.42 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 RICE DRILLING B LLC Produced Fluid 43.52 Bbl INJECTION DISPOSAL WELL 34-009-23823
2019 RICE DRILLING B LLC Produced Fluid 95.74 Bbl INJECTION DISPOSAL WELL 34-167-29543
2019 RICE DRILLING B LLC Produced Fluid 95.74 Bbl INJECTION DISPOSAL WELL 2D0859721
2019 RICE DRILLING B LLC Produced Fluid 98.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 RICE DRILLING B LLC Produced Fluid 631.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 RICE DRILLING B LLC Other Oil & Gas Wastes 393.33 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Produced Fluid 10,171.16 Bbl REUSE (AT WELL PAD)
2019 RICE DRILLING B LLC Filter Socks 0.30 Tons RESIDUAL WASTE PROCESSING FACILITY 301280
2019 RICE DRILLING B LLC Produced Fluid 86.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2680036 Primary Facility 2018-01-09 Drilling/Alteration No Violations Noted Well permit on site. The well was spud on 12/28/17. The operator drilled a 30-inch borehole to 40 feet and set and cemented a 26" x 40' conductor pipe. Cellartech well cellar in place.

Operator installing containment. Rig moving on site.

2680198 Primary Facility 2018-01-04 Routine/Complete Inspection No Violations Noted On January 4, 2018, the Department performed an inspection of the EQT Walter Stinger well pad site. The site is located in Aleppo Twp., Greene Co. The inspection was a routine inspection after restoration of the site and conductor set for two new wells for the site.

The access road and well pad are in good condition.

The operator has removed all E&S BMPs to include the three sediment traps which were on site. The operator has set conductor on two newly permitted wells for the site.

The 8H well is still listed as inactive, and operator has set conductor on the 10H and 12H wells.

2688399 Primary Facility 2018-01-30 Drilling/Alteration No Violations Noted Surface, coal, and intermediate casings have been set and cemented to the surface. Review casing pressure test information. Discuss casing and cementing information. Current depth 2,742'. Site is snow covered at the time of the inspection.

All depths from KB elevation KB - 12.5'

2758125 Primary Facility 2018-07-31 Drilling/Alteration No Violations Noted Drilling has been completed. The operator has drilled the well to 17,879' TMD and set and cemented production casing @ 17,855'. The production casing was cemented on 7/21/18. Estimated production casing TOC 5,000'.
2770597 Primary Facility 2018-08-29 Routine/Complete Inspection No Violations Noted On August 29, 2018, the Department performed an inspection of the EQT/Rice Energy Walter Stinger well site. Present at time of inspection was Andrew Harsh and Aaron Parker (EQT). The site is located in Aleppo Twp., Greene Co. The inspection was routine inspection during hydraulic fracturing operations, related to a request by the operator for a minor modification to the ESCGP1 permit.

The operator has requested a minor modification to the ESCGP1 permit to add rock check dams in the access road collection channel as needed. The minor modification was reviewed and approved by the Department in the field.

At the tome of the inspection, the well pad was initially shutdown, due to a 10 gallon biocide spill on the secondary containment. The well pad was cleared to resume hydraulic fracturing operations. The AST on the well pad was filled with freshwater to test the containment. During hydraulic fracturing operations the tank will hold fresh and reuse water. The well pad secondary containment was in good co

2777742 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted On September 12, 2018, the Department performed an inspection of the EQT/Rice Energy Stinger well site. Present at time of inspection was Carey Bell (EQT). The site is located in Aleppo Twp., Greene Co. The inspection was routine inspection during hydraulic fracturing operations.

The operator has requested a meeting on site to review the condition of the site prior to submitting a Notice of Termination for the ESCGP permit.

The well site is stable with greater than 70% uniform perennial vegetative cover. The operator has reclaimed the three sediment traps on site and has removed all the E&S BMPs except for the triple stacked silt sock along the bottom of the north facing well pad fill slope. The Department would recommend termination of the ESCGP permit after the operator removes the last of the E&S BMPs on the fill slope, given the condition of the site at time of inspection.

The AST on the well pad was filled with reuse water and appeared in good condition. During hydraulic fracturing operations t

2788827 Primary Facility 2018-10-10 Routine/Complete Inspection No Violations Noted On October 10, 2018, the Department performed an inspection of the EQT/Rice Energy Stinger well site. Present at time of inspection was Carey Bell and Harry Good (EQT). The site is located in Aleppo Twp., Greene Co. The inspection was a restoration inspection related to a Notice of Termination for the ESCGP1 permit by the operator.

The operator has submitted a Notice of Termination for the ESCGP1 permit.

The well site is stable with greater than 70% uniform perennial vegetative cover. The operator has reclaimed the three sediment traps on site and has removed all the E&S BMPs. Given the condition of the site during the inspection, the Department recommends termination of the ESCGP1 permit.

The AST on the well pad was filled with reuse water and appeared in good condition. During hydraulic fracturing operations the tank will hold fresh and reuse water. The well pad secondary containment was in good condition and functional.

The operator will need to remediate the small hydraulic spill on the well p

For data sources see[8]

References