If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-43040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.540271,"lon":-79.57458,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Oilcreek Township | |
Operator Name: VISTA PETRO INC | |
Well Pad ID: | |
Farm/Lease Name: HUIDEKOPER J-1 | |
License Status: | |
Spud Date: | |
Permit Date: 1992-01-22 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.540271 | |
Longitude: -79.574580 |
Date | Event |
---|---|
1992-01-22 | New Permit Application |
1992-04-03 | Performed Spud Operation |
1992-04-10 | Drilling Completion |
1993-09-24 | NEWLY DRILLED |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2750593 | Primary Facility | 2018-07-03 | Administrative/File Review | No Violations Noted | Vista Petro Inc. called and is requesting a release of their bond. A review of the Departments files revealed that the well was drilled after April 18, 1985 and requires a bond. A review of the files also revealed that the operator has failed to file production report under 3222(a) and Mechanical Integrity report under 78.88(a)(e). I spoke with Harry Rhoades (814-474-1099) on 7/3/18 concerning the bond and the required reports. Files will be reviewed at a later date to see if the reports have been filed with the Department. |
For data sources see[5]