If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-25488 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.751196,"lon":-78.927043,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Grant Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: HELEN DAUGHERTY 1 | |
License Status: ACTIVE | |
Spud Date: 1980-05-09 | |
Permit Date: 1980-04-29 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.751196 | |
Longitude: -78.927043 |
Date | Event |
---|---|
1980-04-29 | New Permit Application |
1980-05-09 | Performed Spud Operation |
1980-05-13 | Drilling Completion |
1980-05-27 | Perforation |
1980-08-11 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | PHILLIPS PROD CO | 1390.00 | 198 | 0.00 | 0 | 0.00 | 0 |
1993 | PHILLIPS PROD CO | 1524.00 | 140 | 0.00 | 0 | 0.00 | 0 |
1994 | PHILLIPS PROD CO | 1517.00 | 202 | 0.00 | 0 | 0.00 | 0 |
1995 | PHILLIPS PROD CO | 2165.00 | 273 | 0.00 | 0 | 0.00 | 0 |
1996 | PHILLIPS PROD CO | 1377 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | PHILLIPS PROD CO | 1519 | 279 | 0.00 | 0 | 0.00 | 0 |
1998 | PHILLIPS PROD CO | 1695 | 318 | 0.00 | 0 | 0.00 | 0 |
1999 | PHILLIPS PROD CO | 1192 | 299 | 0.00 | 0 | 0.00 | 0 |
2000 | PHILLIPS PROD CO | 1376 | 329 | 0.00 | 0 | 0.00 | 0 |
2001 | PHILLIPS PROD CO | 1195 | 292 | 0.00 | 0 | 0.00 | 0 |
2002 | PHILLIPS PROD CO | 1201 | 246 | 0.00 | 0 | 0.00 | 0 |
2003 | PHILLIPS PROD CO | 1096 | 364 | 0 | 364 | 0.00 | 0 |
2004 | PHILLIPS PROD CO | 1257 | 360 | 0.00 | 0 | 0.00 | 0 |
2005 | PHILLIPS PROD CO | 1310 | 357 | 0.00 | 0 | 0.00 | 0 |
2006 | PHILLIPS PROD CO | 1,009.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | PHILLIPS PROD CO | 997.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | PHILLIPS PROD CO | 586.00 | 277 | 0.00 | 0 | 0.00 | 0 |
2009 | PHILLIPS PROD CO | 546.00 | 333 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS PROD CO | 267.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS PROD CO | 454.00 | 268 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 644.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 610.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 514.00 | 299 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 556.36 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 523.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 387.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 454.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
1994 | PHILLIPS PROD CO | Brine | 164.00 Bbl | ||
1995 | PHILLIPS PROD CO | Brine | 154.00 Bbl | ||
1996 | PHILLIPS PROD CO | Brine | 70.00 Bbl | Treated On-Site, NPDES Discharge | |
1997 | PHILLIPS PROD CO | Brine | 180.00 Bbl | Brine or Industrial Waste Treatment Plt | GROUP |
1998 | PHILLIPS PROD CO | Brine | 151.00 Bbl | Brine or Industrial Waste Treatment Plt | 033-WAST2 |
1999 | PHILLIPS PROD CO | Brine | 70.00 Bbl | Brine or Industrial Waste Treatment Plt | SEE END |
2000 | PHILLIPS PROD CO | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | SEE END |
2001 | PHILLIPS PROD CO | Brine | 70.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2002 | PHILLIPS PROD CO | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2003 | PHILLIPS PROD CO | Brine | 65.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2004 | PHILLIPS PROD CO | Brine | 30.00 Bbl | Brine or Industrial Waste Treatment Plt | |
2005 | PHILLIPS PROD CO | Brine | 160.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2006 | PHILLIPS PROD CO | Brine | 80.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2015 | XTO ENERGY INC | Produced Fluid | 47 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 47.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2213631 | Primary Facility | 2013-10-15 | Administrative/File Review | In Compliance with Policy | On-site meeting as requested by XTO representative Dan Rice to discuss maintenance/replacement of access road galvanized culvert; AR is shared by landowner. |
2283439 | Primary Facility | 2014-06-25 | Routine/Partial Inspection | In Compliance with Policy | On-site inspt to monitor replacement and installation of twin culverts as original culvert became structurally compromised, thereby restricting water flow.Dept notified of culvert failure on 6/20. Opr submitted an emergency permit application on 6/20 which the Dept subsequently approved.Culvert shared by homeowner and Opr.General permit previously not issued to Opr and/or homeowner as culvert was installed prior to GP regulatory requirements.At time of inspt, replacement culverts on-site, not yet installed.Compromised culvert previously removed with temporary wooden bridge in place.E&S BMPs not yet installed.While on-site, Dept contacted Opr rep Dan Rice via phone to inquire about timeline for the culvert installations.Mr. Rice stated that Opr was waiting for the delivery of the second culvert, in which Dept confirmed that second culvert is now on-site.Mr. Rice stated that he will notify the contractor to begin work immediately.Inspection conducted with WQSS April Weiland, WPBS Dan Counahan, and Environmental Engineer Tae-Uk Kim. |
For data sources see[7]