If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-121-45788 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.382119,"lon":-79.763614,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Venango | |
Municipality: Cranberry Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: DEEP HOLLOW | |
License Status: Active | |
Spud Date: 2015-07-08 | |
Permit Date: 2014-11-03 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.382119 | |
Longitude: -79.763614 |
Date | Event |
---|---|
2014-11-03 | New Permit Application |
2015-07-08 | Performed Spud Operation |
2015-07-10 | Drilling Completion |
2016-07-20 | Perforation |
2016-07-28 | Perforation |
2016-07-29 | Performed Stage 1 of Stimulation |
2016-07-29 | Performed Stage 2 of Stimulation |
2016-07-29 | Performed Stage 3 of Stimulation |
2016-07-29 | Performed Stage 4 of Stimulation |
2016-07-29 | Performed Stage 5 of Stimulation |
2016-07-29 | Performed Stage 6 of Stimulation |
2016-07-29 | Performed Stage 7 of Stimulation |
2016-07-29 | Performed Stage 8 of Stimulation |
2016-08-18 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2016-07-29 | 1 | Sand | 0 | 1,650 | 2,500 |
2016-07-29 | 2 | Sand | 0 | 1,100 | 1,500 |
2016-07-29 | 3 | Sand | 0 | 1,800 | 2,180 |
2016-07-29 | 4 | Sand | 0 | 1,950 | 3,900 |
2016-07-29 | 5 | Sand | 0 | 2,100 | 500 |
2016-07-29 | 6 | Sand | 0 | 2,100 | 2,400 |
2016-07-29 | 7 | Sand | 0 | 2,100 | 3,600 |
2016-07-29 | 8 | Sand | 0 | 1,550 | 3,300 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CATALYST ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CATALYST ENERGY INC | 0.00 | 0 | 1419.57 | 213 | 0.00 | 0 |
2017 | CATALYST ENERGY INC | 0.00 | 0 | 471.68 | 365 | 0.00 | 0 |
2018 | CATALYST ENERGY INC | 0.00 | 0 | 286.05 | 365 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 2,163.85 Bbl | CENT WASTE TRT FAC NPDES | PA0101508 |
2016 | CATALYST ENERGY INC | Produced Fluid | 84.62 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 17.69 Bbl | ROAD SPREADING | |
2017 | CATALYST ENERGY INC | Produced Fluid | 80.77 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 64.62 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 11.54 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CATALYST ENERGY INC | Produced Fluid | 3,451.83 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 157.69 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 46.92 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | CATALYST ENERGY INC | Produced Fluid | 21.08 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2018 | CATALYST ENERGY INC | Produced Fluid | 2,118.35 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2018 | CATALYST ENERGY INC | Produced Fluid | 8.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 155.38 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | CATALYST ENERGY INC | Produced Fluid | 688.46 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0101508 |
2019 | CATALYST ENERGY INC | Produced Fluid | 55.00 Bbl | INJECTION DISPOSAL WELL | PAS2D215BWAR |
2019 | CATALYST ENERGY INC | Produced Fluid | 278.46 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 50.77 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | 001-A |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2386622 | Primary Facility | 2015-07-08 | Routine/Complete Inspection | No Violations Noted | |
2386635 | Primary Facility | 2015-07-09 | Administrative/File Review | No Violations Noted | |
2390450 | Primary Facility | 2015-07-14 | Routine/Complete Inspection | No Violations Noted | |
2394546 | Primary Facility | 2015-08-03 | Administrative/File Review | No Violations Noted | |
2416330 | Primary Facility | 2015-10-13 | Routine/Complete Inspection | No Violations Noted | |
2422182 | Primary Facility | 2015-10-28 | Site Restoration | No Violations Noted | |
2506776 | Primary Facility | 2016-08-02 | Drilling/Alteration | No Violations Noted | |
2508168 | Primary Facility | 2016-08-03 | Routine/Complete Inspection | No Violations Noted | |
2510788 | Primary Facility | 2016-08-16 | Administrative/File Review | No Violations Noted | |
2644362 | Primary Facility | 2017-10-05 | Site Restoration | No Violations Noted | Onsite for a well site restoration inspection. The well is producing, labeled, and the annulus is vented. The site has greater thank 70% vegetative cover and is stable. There are no E&S issues. The site is considered restored. |
2683465 | Primary Facility | 2018-01-17 | Routine/Complete Inspection | No Violations Noted | Onsite for a routine inspection. The well is producing, labeled, and the annulus is vented. The site is frozen and snow covered. There are no E&S issues. |
For data sources see[8]