Well Details

Well ID: 37-105-21782
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: West Branch Township
Operator Name: TILDEN MARCELLUS LLC
Well Pad ID:
Farm/Lease Name: KEN TON 902 7V
License Status: INACTIVE
Spud Date:
Permit Date: 2011-03-21
Well Type: GAS
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 41.686131
Longitude: -77.605344

For data sources see[1][2][3]

Well History

Date Event
2011-03-21 New Permit Application
2011-03-25 Performed Spud Operation
2011-04-08 Drilling Completion
2011-09-22 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2012 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2013 ULTRA RESOURCES INC 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 0.00 0 0.00 0 0.00 0
2017 SWEPI LP 0.00 0 0.00 0 0.00 0
2018 SWEPI LP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1960259 Primary Facility 2011-03-26 Drilling/Alteration No Violations Noted
1963698 Primary Facility 2011-04-06 Drilling/Alteration No Violations Noted
1970027 Primary Facility 2011-04-27 Routine/Partial Inspection No Violations Noted
2003880 Primary Facility 2011-09-13 Routine/Complete Inspection No Violations Noted
2012339 Primary Facility 2011-10-12 Routine/Complete Inspection No Violations Noted
2044477 Primary Facility 2012-02-16 Routine/Complete Inspection No Violations Noted
2125907 Primary Facility 2012-12-04 Routine/Complete Inspection No Violations Noted
2190175 Primary Facility 2013-08-08 Routine/Partial Inspection No Violations Noted On August 8, 2013 an inspection was conducted at the Ken-Ton 902 pad in West Branch Township, Potter County. The 1H, 2H, 3H, 4H, 5H and 6H wells are drilled and are in production. The 7V well is drilled, but not in production, the status of the well is Inactive. The 9H well is not drilled, but the permit is active. The well permits posted on site are destroyed / missing, the site ID sign is in need of repair and updating. The site is stable and well vegetated. The conductance of the puddles screened on the pad surface ranged from 200 - 850uS/cm. No issues were noted and no violations were cited during this inspection.
2317674 Primary Facility 2014-10-28 Routine/Complete Inspection No Violations Noted Routine inspection. 1H - 6H & 7V wells are drilled. Ultra Resources completed site restoration. Site to be transferred to SWEPI LP. TLT
2329956 Primary Facility 2014-11-21 Routine/Complete Inspection No Violations Noted
2571172 Primary Facility 2017-03-13 Routine/Complete Inspection No Violations Noted
2587266 Primary Facility 2017-04-26 Routine/Partial Inspection No Violations Noted Areas of the pad surface have been vegetated. Impervious area have been minimized. No erosion issues were noted. No violations were cited during this inspection
2623200 Primary Facility 2017-08-07 Site Restoration No Violations Noted On 8/7/17 at 0902 hrs I conducted an inspection of the Ken Ton 902 well site. No one was present during the inspection. It was overcast and 61 degrees F.

I observed the site and reviewed the erosion and sedimentation (E&S) routine inspection log, the Notice of Termination (NOT) and the Well Site Restoration Report (WSRR).

The site consists of the access road and well pad. Seven wells, the Ken Ton 1H - 6H and 7V (Photos #1-3), have been drilled. According to DEP records, the 1H - 6H wells are in production. The 7V well was placed on inactive status on 1/29/13.

Produced water is stored in a production tank, which has built-in containment (Photo #4). Routine secondary containment inspections are being completed; the last inspection was on 8/5/17. Puddles on the pad surface were tested for field measured specific conductance; readings ranged between 531 - 1,030 micro Siemens/cm.

The well site has been restored and post-construction stormwater management (PCSM) BMPs have been installed (Photo #4). Temporary E

2643590 Primary Facility 2017-09-12 Routine/Complete Inspection No Violations Noted This well is listed as Regulatory Inactive Status. No flow lines attached , is not in production.