X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-105-21866

Well Details

Well ID: 37-105-21866
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Sweden Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 153661
Farm/Lease Name: REESE HOLLOW 117 3HU
License Status:
Spud Date:
Permit Date: 2016-05-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.800210
Longitude: -77.959560

For data sources see[1][2][3]

Well History

Date Event
2016-05-06 New Permit Application
2016-07-23 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-12 2017-06-21 10,976 17,357,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Ascent Carrier/Base Fluid Water 7732-18-5 100 41.9878 144,848,000.0
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 0.0356258 122901
KFR-23 Keane Friction Reducer Alcohols, C12-16, ethoxylated 68551-12-2 2 0.000918063 3167.11
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0206564 71260
copolymer of 2-propenamide Proprietary 10 0.00459032 15835.6
oleic acid diethanolamide 93-83-4 2 0.000918063 3167.11
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Hydrochloric Acid 7647-01-0 7.5 0.0244754 84434.7
Water 7732-18-5 92.5 0.301864 1,041,360.0
KAI-12 Keane Acid Inhibitor xylene 1330-20-7 5 0.00003303 113.934
Fatty imidazoline 61790-69-0 5 0.00003303 113.934
isoproyl alcohol 67-63-0 5 0.00003303 113.934
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00003303 113.934
ethylbenzene 100-41-4 1 0.00000661 22.787
prop-2-yn-1-ol 107-19-7 5 0.00003303 113.934
Methanol 67-56-1 90 0.000594479 2050.82
HydroProp (Proppant) Keane Proppant Ceramic materials and wares, chemicals 66402-68-4 100 57.6023 198,715,000.0
Other Chemical(s) Listed Above See Trade Name(s) List prop-2-yn-1-ol 107-19-7 5 0.00003303 113.934
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.000918063 3167.11
copolymer of 2-propenamide Proprietary 10 0.00459032 15835.6
oleic acid diethanolamide 93-83-4 2 0.000918063 3167.11
Water 7732-18-5 92.5 0.301864 1,041,360.0
ethylbenzene 100-41-4 1 0.00000661 22.787
isoproyl alcohol 67-63-0 5 0.00003303 113.934
Citric acid 77-92-9 40 0.000535566 1847.58
xylene 1330-20-7 5 0.00003303 113.934
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00003303 113.934
Fatty imidazoline 61790-69-0 5 0.00003303 113.934
KFEAC-30 Keane Iron Control acetic acid 64-19-7 60 0.000803349 2771.38
Citric acid 77-92-9 40 0.000535566 1847.58

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2016 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 JKLM ENERGY LLC 514,347.00 81 0.00 0 0.00 0
2018 JKLM ENERGY LLC 2,313,654.00 364 0.00 0 0.00 0
2019 JKLM ENERGY LLC 1,194,938.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2016 JKLM ENERGY LLC Other Oil & Gas Wastes 127.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 JKLM ENERGY LLC Produced Fluid 26.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 JKLM ENERGY LLC Drill Cuttings 1,585.75 Tons LANDFILL 301358
2016 JKLM ENERGY LLC Produced Fluid 352.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Other Oil & Gas Wastes 2,435.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Drilling Fluid Waste 668.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 JKLM ENERGY LLC Other Oil & Gas Wastes 380.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 116.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 2,334.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 JKLM ENERGY LLC Produced Fluid 56.73 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Produced Fluid 128.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017 JKLM ENERGY LLC Produced Fluid 24,964.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 JKLM ENERGY LLC Other Oil & Gas Wastes 1,435.75 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drilling Fluid Waste 1,456.50 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Drill Cuttings 569.50 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Synthetic Liner Materials 37.75 Tons LANDFILL 301358
2017 JKLM ENERGY LLC Produced Fluid 4,477.50 Bbl REUSE (AT WELL PAD)
2017 JKLM ENERGY LLC Produced Fluid 208.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 JKLM ENERGY LLC Produced Fluid 8,072.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Produced Fluid 19,737.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 361.07 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Produced Fluid 12,365.94 Bbl REUSE (AT WELL PAD)
2018 JKLM ENERGY LLC Other Oil & Gas Wastes 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 JKLM ENERGY LLC Produced Fluid 111.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 JKLM ENERGY LLC Produced Fluid 656.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 JKLM ENERGY LLC Produced Fluid 2,045.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 JKLM ENERGY LLC Produced Fluid 219.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 JKLM ENERGY LLC Produced Fluid 714.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 JKLM ENERGY LLC Produced Fluid 4.11 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Waste Water Treatment Sludge 3.23 Tons LANDFILL 301358
2018 JKLM ENERGY LLC Produced Fluid 2,643.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 JKLM ENERGY LLC Synthetic Liner Materials 10.09 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 1,912.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 JKLM ENERGY LLC Produced Fluid 690.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 JKLM ENERGY LLC Synthetic Liner Materials 3.13 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 17.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Produced Fluid 124.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 JKLM ENERGY LLC Waste Water Treatment Sludge 57.84 Tons LANDFILL 301358
2019 JKLM ENERGY LLC Produced Fluid 1,418.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 JKLM ENERGY LLC Produced Fluid 262.00 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 JKLM ENERGY LLC Produced Fluid 702.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 JKLM ENERGY LLC Other Oil & Gas Wastes 550.00 Bbl REUSE (AT WELL PAD)
2019 JKLM ENERGY LLC Produced Fluid 2,637.50 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2492245 Primary Facility 2016-06-10 Routine/Partial Inspection No Violations Noted Preconstruction meeting for the Reese Hollow 117 well site. JKLM, New Growth Resources and J.L. Watts were present. New Growth Resources will be conducting logging/chipping operations and J.L. Watts is the construction contractor. The site will consist of improvement of a 6,000' pre-existing access road, a 350' x 500' well pad and two sediment traps. Four wells have been permitted (Reese Hollow 117 1HU - 4HU). Logging operations are anticipated to begin in the near term. TLT
2504109 Primary Facility 2016-07-22 Preoperation Inspection No Violations Noted Pre-spud inspection. Drainage controls in place. Soil temporarily stabilized.
2513829 Primary Facility 2016-08-25 Routine/Complete Inspection No Violations Noted
2541149 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted
2548298 Primary Facility 2016-12-29 Routine/Partial Inspection No Violations Noted Partial inspection. Site was snow covered. The H&P 500 rig was drilling the 1HU well and will move onto the 4HU well next. The 2HU and 3HU wells have been drilled to total depth. Equipment and materials were staged on containment. Housekeeping appeared to be good. No violations noted during the inspection. TLT
2561585 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted
2601562 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted
2613295 Primary Facility 2017-06-06 Routine/Complete Inspection No Violations Noted
2613332 Primary Facility 2017-06-20 Routine/Complete Inspection No Violations Noted
2626407 Primary Facility 2017-08-10 Routine/Complete Inspection No Violations Noted
2633243 Primary Facility 2017-08-22 Routine/Complete Inspection No Violations Noted 20x13 vented/conductor x surface = 0 LEL and 0 METHANE/volume

13x9 vented/ intermediate x surface = 0 LEL and 0 METHANE/ volume

9x5 vented / intermediate x production = 0 LEL and 0 METHANE/ volume

2705634 Primary Facility 2018-03-08 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. All annulus vents , flow lines, and fittings were tested for gas . Results of this testing was that no gas was detected on the wellhead assembly or the well area.
2721154 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted Minimal activity on site when I arrived. I met Sean Bacha, production consultant for JKLM. AST present on the site, filled to within 8-10' of the top. Secondary tank contained little to no water. Puddles on the pad and around the tank showed conductance from .19-.38 mS/cm. Puddles immediately in front of the offloading area for the tank were slightly higher (.85-2.15 mS/cm). A bank of Baker tanks was also present on the site; Sean informed me that the produced water from the pad had been going to SWEPI, but at present they are not taking any. Overall, site looked good; however, I was unable to locate any well tags on the wells. I recommend that tags be affixed ASAP, or if they were present, that they be made more visible and obvious.
2742333 Primary Facility 2018-06-14 Routine/Complete Inspection No Violations Noted The DEP conducted a ROUTINE inspection of the JKLM – Reese Hollow 117 on 6/14/2018 @1245 hours. The weather was 70 degrees, 38% humidity, winds WNW 20 mph. The well site is currently in production.

The site was last inspected by company personnel on 6/14/2018 with the comment “elevated conductivity readings recorded in two areas outside of containment.”

A puddle was observed along the edge of containment in front of the AST load/offload area. The puddle had a field measured conductivity of 2.9 -3.5 mS/cm (see photo #2). Fluid inside the larger containment was measured at 9.04 mS/cm (photo #3) and “Or” in the smaller duck pond containment (photo #4 and #5). A smaller duck pond containment was laying adjacent to the AST with a field measured conductivity of “Or” or over range (photo #7).

A puddle was observed on the pad surface in front of the tank battery with a field measured conductivity of 3.73mS/cm (photo #9 and #10). A vac truck driver was located onsite. I informed him of the areas with elevated cond

2746421 Primary Facility 2018-06-27 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. No violations were noted at the time of this inspection.
2765859 Primary Facility 2018-08-20 Routine/Complete Inspection No Violations Noted I arrived on the site and met Sean Bacha, consultant for JKLM. Little activity was occurring on the pad. Puddles around the offloading area for the MASS showed low conductance (.53-.75 mS/cm); water in the containment itself was slightly higher (.87 mS/cm), and was within 2-3" of the top of the berm. A vac truck was already on location, and Sean informed me that it would be vaccing this containment. The MASS was fairly full, with approximately 3-3 1/2' of freeboard, and the secondary containment had no standing water. On the remainder of the pad, all puddles showed low conductance (.33-.68 mS/cm).
2768254 Primary Facility 2018-08-28 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. A digital gauge on the 3" production line leaving the well head assembly and going to the production equipment read 1015 psi (pounds per square inch) at this inspection. No violations noted at this inspection.
2803116 Primary Facility 2018-11-14 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are four (4) annulus vents openly venting on this well. No annulus vents were noted venting at this inspection. No violations noted at the time of this inspection.
2814193 Primary Facility 2018-12-11 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection conducted a routine inspection of the JKLM Reese Hollow 117 Well pad located in Sweden Twp, Potter Co on 12/11/2018 @1245 hours. The weather was 25 degrees, parlty sunny, 2-4 inches of snow on the ground. Winds WSW @10mph, 68% humidity. Sean Bacha, JKLM representative was present onsite during the inspection.

The well site appears to be setup for production. Four wells are listed as in "active" status. The Aboveground Storage Tank (AST) appears to have been removed. A large pile of gravel was observed in it's place. Mr. Bacha stated the waste containers staged onsite are from the removal of the AST.

The secondary containment around the production tanks and the tank battery were inspected. No staining or puddles were observed on the ground surface. No fluid was observed in the secondary containment.

The onsite E&S inspection log states the site was last inspected on 12/7/2018.

No violations are noted at this time. I departed the site at 1415.

For data sources see[8]

References