Well ID: 37-111-20296 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.743583,"lon":-79.357611,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Somerset | |
Municipality: Addison Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 149069 | |
Farm/Lease Name: PMG ALLEN UNIT 1H | |
License Status: | |
Spud Date: 2010-04-04 | |
Permit Date: 2010-02-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.743583 | |
Longitude: -79.357611 |
Date | Event |
---|---|
2010-02-25 | New Permit Application |
2010-03-24 | Performed Spud Operation |
2010-05-06 | Drilling Completion |
2010-08-14 | Perforation |
2010-08-16 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHIEF OIL & GAS LLC | 64,882.00 | 24 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 209,382.00 | 182 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 359,927.00 | 275 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 243,036.26 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 172,572.00 | 343 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 147,029.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 208,344.00 | 324 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 7,760.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 12,439.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 4,729.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 3,730.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-059-24067 |
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 350.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 365.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 495.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 15,378.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 946.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 3,743.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 6,811.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 296.16 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 6,059.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 492.74 Tons | LANDFILL | 100419 |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 95.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 355.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 82.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 28.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 2,727.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 58.23 Tons | LANDFILL | 76-00-08 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 13.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 23.48 Tons | LANDFILL | 100592 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 0.11 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID0209062814 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,304.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 10,916.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,521.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | LPR ENERGY LLC | Produced Fluid | 183.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | Produced Fluid | 615.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | LPR ENERGY LLC | Produced Fluid | 2,073.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | LPR ENERGY LLC | Produced Fluid | 2,322.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | LPR ENERGY LLC | Produced Fluid | 531.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | LPR ENERGY LLC | Produced Fluid | 2,139.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2018 | LPR ENERGY LLC | Produced Fluid | 1,422.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid | 2,707.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2018 | LPR ENERGY LLC | Produced Fluid | 551.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | LPR ENERGY LLC | Produced Fluid | 712.00 Bbl | REUSE (AT WELL PAD) | |
2019 | LPR ENERGY LLC | Produced Fluid | 6,110.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2019 | LPR ENERGY LLC | Produced Fluid | 401.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1873366 | Primary Facility | 2010-03-25 | Drilling/Alteration | Violation(s) Noted | At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation hour¿s invoice. On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification. E/S plan and sign at the entrance of the access road. Sign was missing permit number. E/S plan was missing site plot and E&S controls plan. Additional site activity was occurring around pad with no E/S plans and limited E/S controls. On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release |
1877308 | Primary Facility | 2010-04-08 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. All erosion control BMP¿s appeared to have been implemented properly. Noted that earthmoving activity was ongoing adjacent to the drill pad. Spoke with operator Matt Barch via phone regarding this matter and he stated that this was work to construct the frac pit and that an ESCGP-1 covering this activity was obtained and was with the contractor performing site construction at that time. |
1880296 | Primary Facility | 2010-04-23 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S and IW issues. Pit aligned with 20 mil plastic aligned drilling pit and frac pit aligned also and security fence. No free board issues with pit. Well connected production equipment. Swab rig was present at the wellhead. Heavy equipment was on-site to start restoring site and pits. |
1884554 | Primary Facility | 2010-05-12 | Routine/Complete Inspection | Violation(s) Noted | At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp¿s were installed filter sox¿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues. |
1918459 | Primary Facility | 2010-10-06 | Complaint Inspection | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Pit aligned with proper plastic and no freeboard issues. Keystone Vacuum was removing fluids from pit. E&S controls were in place. Chief was in the process of flow back and flaring gas well from Fracking procedure. Due to Chief policy of ¿fire retardation suites¿, DEP was not allowed to enter the site pad but was able to view the flare and site conditions from the Security station. Based on visual view of the site, the flame was showing no smoke or air quality problems. The site showed no signs of stress vegetation or air quality problems. DEP called Chief (JD Slater ¿ Compliance Manager). He reviewed the log for Sunday and showed no reports of site air quality concerns. |
1922566 | Primary Facility | 2010-10-13 | Complaint Inspection | No Violations Noted | Well site properly signed with ES plan available for review during inspection. No accelerated erosion or sedimentation issues noted with well site, access road, or impoundment. Culverts, ditches, and sediment traps sufficiently rocked and functioning. Observed large amounts of sand atop pad. No pits on site, only frac tanks. No observation of industrial discharge. Operator actively repairing a ¿minor¿ leak on well head during our well inspection. Well fraced in Aug and recently burnt off (flared). Site was being monitored by security 24hrs a day. Accompanied by WQS Dana Burk, and WQSS Ed Ritzer. |
1922591 | Primary Facility | 2010-10-14 | Routine/Complete Inspection | No Violations Noted | Operator should correct API # on sign, Frac pit w/ adequate free board |
1969535 | Primary Facility | 2011-04-29 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, valid site Id sign, ES plan, and ESCGP-1 located onsite. Site gated from third party access (, but pipeline installation ongoing during inspection). Access road stable, no accelerated ES issues. Well pad adequately stabilized with rock. Drilling completed 05/06/10. Two brine tanks located onsite and surrounded by containment unit. Disturbed areas have been seeded/mulched operator may need to reseed/mulch to achieve uniform vegetative cover; no accelerated erosion or sedimentation issues noted. Temporary bmp¿s are in place and functioning; operator should continue to routinely monitor/maintain all bmp¿s until all earth disturbance activities been completed and final restoration (according to regulation) is achieved. No industrial waste issues observed. |
1975389 | Primary Facility | 2011-04-26 | Routine/Complete Inspection | No Violations Noted | well inactive. process of connecting pipeline |
1986075 | Primary Facility | 2011-06-14 | Administrative/File Review | No Violations Noted | review of inactive status. apporved |
1997389 | Primary Facility | 2011-08-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. Well was in production. Well showing 3000 psi at wellhead and was connected to condensation unit followed by 2 ¿ 100 bbls brine tanks. Both units located in a containment area. DEP representatives present were Paul Wyrwas and Marc Maestra. Marc inspected the site pad and perimeter of the site pad and found no issues. |
1997539 | Primary Facility | 2011-08-04 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. Paul Wyrwas was present during inspection. |
2016289 | Primary Facility | 2011-11-03 | Routine/Complete Inspection | No Violations Noted | During this inspection, Site ID sign, ES plan, ESCGP-1, and PPC Plan present. Site gated. Access road stable. Well drilled and in production Two brine tanks located on site located in containment unit appear sound. No IW issues noted. Previously disturbed areas restored with adequate vegetative cover. Pad adequately rocked. No accelerated erosion or sedimentation issues noted onsite or access road. Noted large rock pile on back side of pad, recommend operator remove in order to prevent a possible pollution event. No violations noted at time of inspection. |
2051538 | Primary Facility | 2012-03-14 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2067339 | Primary Facility | 2012-05-04 | Routine/Complete Inspection | No Violations Noted | |
2069244 | Primary Facility | 2012-05-18 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill pit and cuttings contained within were being removed. The Department notes that the well pad area and the access road show no sign of accelerated erosion. The Department also notes the E&S plan was onsite, implemented as designed, and properly maintained. |
2070173 | Primary Facility | 2012-05-10 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security. |
2076225 | Primary Facility | 2012-06-13 | Routine/Complete Inspection | No Violations Noted | At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.It appears that site and previously disturbed areas have been stabilized no accelerated erosion or sedimentation issues noted. Bmp's implemented and maintained. Chevron removed a drill pit previously encapsulated by former well owners. Chevron chose to dispose of previously encapsulated pit offsite prior to drilling additional wells on this location. Pit contents and liner have been removed offsite, operator agreed to supply department with manifests for all materials removed from pit (including liner)--operator unable to account for liquid removal prior to encapsulation as it was handled by previous owner. Operator also has plans to file an Amended Restoration Report to indicate that the previously encapsulated pit has been removed off site. Based on current observation, dept concurred w/ opr proceeding w/ plans to backfill pit, it visibly appears contimanted soils/materials removed |
2078166 | Primary Facility | 2012-06-20 | Routine/Complete Inspection | No Violations Noted | Inspection result of operators notification that previously encapsulated pit has been successfully removed and backfilled. During today's inspection, department noted that area of previously encapsulated pit had been back filled with clean fill material, but due to recent heavy rains it appears that soil has "settled." Due soft nature of the fill it was recommended that operator add additional fill prior to rocking area to ensure that material is properly compacted and stabilized as operator has plans to drill another well on location and drill rig may be placed over area recently back filled. Again, department is currently awaiting final response from operator including disposal records, amended restoration report, as well as written report on activities undertaken for removal of previously encapsulated drill pit. |
2088107 | Primary Facility | 2012-08-01 | Routine/Complete Inspection | No Violations Noted | Routine inspection. The site was without issues. |
2092836 | Primary Facility | 2012-05-24 | Routine/Complete Inspection | No Violations Noted | Gas well was in production. No E&S issues were present during the inspection. |
2093088 | Primary Facility | 2012-06-21 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2094698 | Primary Facility | 2012-08-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2094798 | Primary Facility | 2012-08-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2095561 | Primary Facility | 2012-08-28 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2107615 | Primary Facility | 2012-10-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator indicated that a cast iron plug was set in the well to prepare for additional wells to be drilled. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained. |
2120846 | Primary Facility | 2012-11-30 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. |
2121603 | Primary Facility | 2012-11-28 | Routine/Complete Inspection | No Violations Noted | Inspection result of spud notification. Multi-well pad. |
2123089 | Primary Facility | 2012-11-12 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. |
2128475 | Primary Facility | 2012-12-17 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. |
2128645 | Primary Facility | 2013-01-08 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. |
2130307 | Primary Facility | 2013-01-14 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well. |
2136131 | Primary Facility | 2013-01-31 | Incident- Response to Accident or Event | In Compliance with Policy | Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 1/31/13. According to Mr. Small, on 1/30/13 while HWR company was loading excavator parked where access road branches off towards impoundment, hydraulic line burst, spilling approximately two quarts of hydraulic oil onto access road. Spill was immediately soaked up and the impacted gravel shoveled into drum. Samples taken, will dispose of in landfill. It appears situation was handled according to policy and a follow-up inspection will be conducted in future to ensure full compliance. |
2143461 | Primary Facility | 2013-02-11 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H. |
2143507 | Primary Facility | 2013-02-22 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 6H. |
2144627 | Primary Facility | 2013-02-25 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 1H had been drilled. 2H, 3H, 4H, 5H, 6H all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing.Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121603) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted in relation to well pad or access road. Department recommends that Operator remove debris from rock-lined ditches. |
2151599 | Primary Facility | 2013-03-13 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H. |
2168502 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | Met with Curtis Small with Chevron and inspected the site. No issues were noted. |
2169711 | Primary Facility | 2013-05-22 | Routine/Complete Inspection | No Violations Noted | |
2173629 | Primary Facility | 2013-06-10 | Routine/Complete Inspection | No Violations Noted | Routine inspection no issues noted. |
2228147 | Primary Facility | 2013-11-26 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H. |
2228305 | Primary Facility | 2013-10-31 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H. |
2228693 | Primary Facility | 2013-10-09 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H |
2229875 | Primary Facility | 2013-09-26 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was setting up drilling for well 4H. |
2235790 | Primary Facility | 2014-01-13 | Routine/Complete Inspection | No Violations Noted | On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet. |
2244496 | Primary Facility | 2014-02-10 | Routine/Complete Inspection | No Violations Noted | Met with Curtis Small and inspected the well pad. Chevron propsed aded an aditional ramp tp allow the pipeline company access to their well controls. The access road will be temporary. |
2250957 | Primary Facility | 2013-03-05 | Routine/Complete Inspection | No Violations Noted | On 3/5/14 met with Joe Brusco with Chevron and inspected the site. |
2252437 | Primary Facility | 2014-03-10 | Routine/Complete Inspection | No Violations Noted | On 3/10/14 met with Alex Grant with Chevron and inspected the site. |
2298104 | Primary Facility | 2014-08-20 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Chevron was in process of fracking well 5H. Well 1H was temporary shut in. Wells 4HA, 3H and 6H have been completed. Well 2H will be completed the following week. |
2311107 | Primary Facility | 2014-10-08 | Routine/Complete Inspection | No Violations Noted | Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans. |
2408947 | Primary Facility | 2015-09-18 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well tag present and legible. |
2486256 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2532203 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | no issues. gas wells productions |
2549713 | Primary Facility | 2016-12-29 | Routine/Complete Inspection | No Violations Noted | Multi-well Marcellus pad.
Site ID sign, E&S plan, PPC plan and ERP on site. At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692. |
2594467 | Primary Facility | 2017-04-15 | Routine/Complete Inspection | No Violations Noted | system running,. no issues |
2594580 | Primary Facility | 2017-05-16 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2626051 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | system running. no issues. |
2656126 | Primary Facility | 2017-11-02 | Routine/Complete Inspection | No Violations Noted | System running no,issues |
2672028 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | System running |
2672068 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection. |
2685362 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | System producing. Emergency contact present. Well tag present. |
2700747 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Well tag present and emergency contact information present. No issues at the site |
2700825 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection. |
2719552 | Primary Facility | 2018-04-18 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment. |
2766909 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1873366 | 584177 | 03/25/2010 | 2010-03-25 | 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling | Administrative | |
1884554 | 587052 | 05/12/2010 | 2010-05-12 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | |
1884554 | 587053 | 05/12/2010 | 2010-05-12 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
584177 | 256440 | NOV - Notice of Violation | Comply/Closed | 2010-03-30 | |||
584177 | 260784 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-07-30 | 2010-07-30 | $2,000.00 | $2,000.00 |
587052 | 257711 | NOV - Notice of Violation | Comply/Closed | 2010-09-02 | |||
587052 | 266666 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-01-10 | 2011-01-10 | $7,500.00 | $7,500.00 |
587053 | 257711 | NOV - Notice of Violation | Comply/Closed | 2010-09-02 | |||
587053 | 266666 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-01-10 | 2011-01-10 | $7,500.00 | $7,500.00 |
For data sources see[7]