Well ID: 37-113-20346 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.564331,"lon":-76.513386,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Forks Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 153025 | |
Farm/Lease Name: BAHL UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2015-10-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.564331 | |
Longitude: -76.513386 |
Date | Event |
---|---|
2015-10-13 | New Permit Application |
2015-12-28 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-06-18 | 2017-06-25 | 6,673 | 7,846,730 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SCAL16484A | Nalco Champion | Scale Inhibitor | Listed Below | ||||
Water | 7732-18-5 | 85 | 0.12941 | 98685 | ||||
(Mineral oil) Light hydrotreated petroleum distillate | 64742-47-8 | 30 | 0.02019 | 15396 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.00163 | 1240 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00127 | 970 | ||||
Crystallilne silica | 14808-60-7 | 100 | 13.8842 | 10,588,100.0 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00254 | 1940 | ||||
Ethanol | 64-17-5 | 5 | 0.00127 | 970 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00163 | 1240 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00008000 | 58 | ||||
Water | 7732-18-5 | 40 | 0.00217 | 1654 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00336 | 2566 | ||||
Water | 7732-18-5 | 80 | 0.02035 | 15522 | ||||
Water | 7732-18-5 | 100 | 85.8653 | 65,481,000.0 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00004000 | 34 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 5 | 0.00336 | 2566 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 1 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02284 | 17415 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 5 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00875 | 6672 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 1 | ||||
Alcohols, (C10-16), ethoxylated | 68002-97-1 | 5 | 0.00336 | 2566 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 1 | ||||
Hydrochloric Acid | PVS | Acidizing | Listed Below | |||||
BIOC11139A | Nalco Champion | Biocide | Listed Below | |||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below | |||||
Water | Chief Oil & Gas | Carrier/Base Fluid | Listed Below | |||||
Sand | Sargent/Unimin | Proppant | Listed Below | |||||
Unislick ST -50 | CESI Chemical | Friction Reducer | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 1,109,479.31 | 172 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 1,930,530.73 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 1,396,144.03 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | CHIEF OIL & GAS LLC | Drill Cuttings | 34.74 Tons | LANDFILL | 301358 |
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 840.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 330.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2016 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,258.21 Tons | LANDFILL | 301358 |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 8,765.37 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 704.87 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 232.08 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2428791 | Primary Facility | 2015-12-01 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to review erosion and sedimentation controls and site conditions during construction. |
2431984 | Primary Facility | 2015-12-10 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to review site condition and progress of construction. Final grading of pad area and installation of erosion control matting is underway. Erosion and sediment controls are in place and in good repair. No evidence of accelerated erosio nor sedimentation was observed. |
2444565 | Primary Facility | 2016-01-25 | Drilling/Alteration | No Violations Noted | Arrived @ 13:27. Weather: cold, cloudy. Patterson 254 on site. Met with company man Billy Swanson. At time of my inspection drilling at 686’. Drilling going well apart from delays due to cold nights. Last BOP test: 01/24/2016. Reviewed surface casing cement report. Pumped 175 sks, yield 1.36, returns to surface: 29 bbls.
Left location @ 14:53 |
2468831 | Primary Facility | 2016-03-29 | Routine/Complete Inspection | No Violations Noted | |
2558090 | Primary Facility | 2017-01-25 | Routine/Complete Inspection | No Violations Noted | Arrived @ 12:10. Weather: cloudy, warm, snow on location. No one was on location at the time of my inspection. There is one spudded well, the Bahl Unit 1H. Chief completed drilling on 2/6/16. Well has not yet been fracced. Location stakes were set out for the Bahl 2H and 3H. There was ice in the well cellar. The well was locked and shut-in.
5-1/2”: 1100 psi (0-10,000 psi, analog) Annular vents were plumbed to a polytank where 100% methane was detected (Altair 5X gas meter calibrated on 1/23/17). 9-5/8” x 5-1/2”: 100% methane 13-3/8” x 9-5/8”: no methane detected. Baker tanks have been removed. There were no violations at the time of my inspection. Left @ 12:20. |
2563241 | Primary Facility | 2017-02-21 | Routine/Complete Inspection | No Violations Noted | No violations cited. |
2572247 | Primary Facility | 2017-03-13 | Drilling/Alteration | No Violations Noted | Arrived @ 13:49. Weather: cloudy, snow storm predicted. Site being prepared for drilling. Containment was down and covered with mats. At the time of my inspection an Allison Crane crew was onsite. Also onsite was a Keystone Clearwater Solutions crew. I spoke to Mark Maguire who said that they were putting OBM from the Yonkin B in the tanks on the right hand side (looking toward the road). They were putting water in the tanks at the back on the left, and base oil in the tank at the front on the left.
The Bahl Unit 1H was shut in and surrounded by fencing. Bahl 2H and Bahl 3H conductors were cut and beveled. Left @ 14:00. |
2582444 | Primary Facility | 2017-04-13 | Routine/Complete Inspection | No Violations Noted | Inspection to assess site conditions during drilling operations. No violations cited. |
2586731 | Primary Facility | 2017-04-25 | Routine/Complete Inspection | No Violations Noted | Drilling completed. Well development containment removed. Rig matting stacked on side of well site. Various storage containers remain on site. No violations noted. |
2608387 | Primary Facility | 2017-06-27 | Routine/Complete Inspection | No Violations Noted | I arrived on-site @ 09:20 hrs. and met Justin Myers, Chief company man. Frac ended Sunday 6/25, and most equipment had already been moved to the Nelson pad for the upcoming frac there. Several banks of Baker tanks and a pair of pump trucks were still present on the site. Water puddled on the pad surface demonstrated low conductance (.3- .980 mS/ cm). Berms had been removed from pad containment for equipment removal; water puddled on the liner also mostly showed low conductance (.4- 1.3 mS/ cm); however, one area near the pump trucks had puddles ranging from 2 mS/cm to greater than 19.99 mS/ cm. The volume of these puddles were low (the largest being 2-3 gallons), and a vac truck operator was immediately deployed to the area by Mr. Myers. Overall condition of the pad liner appeared to be good. PPC and ER plan were in the site mailbox; I departed the site @ 10:15 hrs. |
2658590 | Primary Facility | 2017-11-07 | Routine/Complete Inspection | No Violations Noted | Arrived at 9:50. Weather: cold, cloudt, windy. Andrea Mullen (DEP geologist), Ulyana Trynovich (DEP OGI), and I met with Jon Hafer (Chief Environmental Specialist). There were 3 producing wells on the pad. The purpose of this inspection was to examine the annular plumbing on the 2H and 3H wells (which employ the GE RSH2 well head) and the 1H ( which uses the LSH well head), and participate in the acquisition of production gas isotopic samples for the 2H and 3H wells. Following the well inspections, the abandoned well was monitored for combustible gas. Combustible gas was not detected (Altair 5X gas meter calibrated on 11/7/17). During this inspection a crew was working on one of the Bahl pad sed basins. |
2669336 | Primary Facility | 2017-12-06 | Routine/Complete Inspection | No Violations Noted | Arrived at 9:30. Weather: cold. I met with Jon Hafer (Chief Environmental Specialist). There were 3 producing wells on the pad. The purpose of this inspection was to participate in the conclusion of the 168-hour PBT and isotope sampling collection on the Bahl 2H and 3H wells. Bahl 1H: in production. Top gauge: 1500 psi.
2H: 9-5/8" x 5-1/2": 519.75 psig, 13-3/8" x 9-5/8": -.35 psig, 20" x 13-3/8": 1.74 psig. 3H: 9-5/8" x 5-1/2": 616.8 psig, 13-3/8" x 9-5/8": 48.1 psig, 20" x 13-3/8": 5.48 psig. Overall gas levels are declining. |
2695007 | Primary Facility | 2018-02-15 | Routine/Complete Inspection | No Violations Noted | Arrived at 12:30. Weather warm with snow and ice melting. There are 3 wells in production on site and an abandoned well off-site, but nearby. Bahl 1H: ice in cellar, 5' below surface, no bubbles. Top gauge: 1200 psi (0-5000 psi). 5-1/2": 1225 psi (0-5000 psi). 9-5/8" x 5-1/2": 36% methane/ volume (Altair 5X gas meter calibrated 2/14/18).
Bahl 3H: cellar water-filled. Top gauge: 1200 psi, 5-1/2": 1150 psi. Bahl 2H: low level water and ice in cellar. Top gauge: 1150, Bahl 2H and 3H are plumbed to the same polytank. Tank about 1/5 full of oil-based mud mixture. 60% methane/ volume at tank mouth. Nearby abandoned well: some water in base of casing - no bubbling. No methane detected. |
2725842 | Primary Facility | 2018-05-03 | Routine/Complete Inspection | No Violations Noted | Three wells staged for production phase. Four each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. See E&S issues. No enforcement taken at this time. |
2785643 | Primary Facility | 2018-10-09 | Routine/Complete Inspection | No Violations Noted | Weather was 70° and cloudy at time of inspection. There were no chief representatives on location at time of inspection. Well had a 0-5k psi gauge on the production tubing, the production casing and the pay line. Well also had a digital gauge on the production casing. The digital gauge on the production casing read 1034 psi, tubing pressure was approximately 1200 psi and pay line pressure was approximately 1050 psi at time of inspection. There were 2 annulus vents plumbed to surface. They were plumbed together and ran over to a poly vent tank. The tank had 100% LEL and 8% methane detected at time of inspection. No violations were noted at time of inspection. |
2835737 | Primary Facility | 2019-02-04 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 12:38; the weather was ~50°F, clear, and calm. The gate was open when I arrived.
There were 3 properly tagged Marcellus wells staged for production. The well cellars were filled with water; no bubbling was observed. The wells were plumbed to 2 poly vent tanks that were not on additional secondary containment. There were 3 GPU's and produced water tanks onsite and in secondary containment. There were 2 infiltration basins constructed at this pad. Both basins had some remaining ice in them. Some areas that were free from snow were well vegetated. Sections of filter sock remained in place around the site. The last logged E&S inspection was 1/14/19. The Department recommends maintaining a proper inspection schedule and noting those inspections in the onsite log. No violations noted. |