If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-20380 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.672628,"lon":-76.969747,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Ward Township | |
Operator Name: REPSOL OIL & GAS USA LLC | |
Well Pad ID: 148196 | |
Farm/Lease Name: DCNR 587 02 009 06 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-09-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.672628 | |
Longitude: -76.969747 |
Date | Event |
---|---|
2009-09-02 | New Permit Application |
2009-10-09 | Performed Spud Operation |
2010-06-07 | Drilling Completion |
2010-08-12 | Perforation |
2011-04-28 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | REPSOL OIL & GAS USA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | REPSOL OIL & GAS USA LLC | 586,373.10 | 95 | 0.00 | 0 | 0.00 | 0 |
2011 | REPSOL OIL & GAS USA LLC | 1,300,189.00 | 343 | 0.00 | 0 | 0.00 | 0 |
2012 | REPSOL OIL & GAS USA LLC | 821,357.10 | 362 | 0.00 | 0 | 0.00 | 0 |
2013 | REPSOL OIL & GAS USA LLC | 582,676.40 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | REPSOL OIL & GAS USA LLC | 457,091.10 | 356 | 0.00 | 0 | 0.00 | 0 |
2015 | REPSOL OIL & GAS USA LLC | 377,471.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2016 | REPSOL OIL & GAS USA LLC | 323,040.80 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | REPSOL OIL & GAS USA LLC | 237,234.90 | 318 | 0.00 | 0 | 0.00 | 0 |
2018 | REPSOL OIL & GAS USA LLC | 241,561.90 | 320 | 0.00 | 0 | 0.00 | 0 |
2019 | REPSOL OIL & GAS USA LLC | 201,768.70 | 355 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | REPSOL OIL & GAS USA LLC | Produced Fluid | 1,213.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2010 | REPSOL OIL & GAS USA LLC | Drilling Fluid Waste | 435.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2011 | REPSOL OIL & GAS USA LLC | Produced Fluid | 329.91 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2011 | REPSOL OIL & GAS USA LLC | Produced Fluid | 18.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 |
2011 | REPSOL OIL & GAS USA LLC | Produced Fluid | 48.84 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2011 | REPSOL OIL & GAS USA LLC | Fracing Fluid Waste | 704.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2011 | REPSOL OIL & GAS USA LLC | Produced Fluid | 53.28 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | REPSOL OIL & GAS USA LLC | Produced Fluid | 94.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | REPSOL OIL & GAS USA LLC | Produced Fluid | 22.88 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | REPSOL OIL & GAS USA LLC | Produced Fluid | 45.70 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | REPSOL OIL & GAS USA LLC | Produced Fluid | 286.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | REPSOL OIL & GAS USA LLC | Produced Fluid | 74.97 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | REPSOL OIL & GAS USA LLC | Produced Fluid | 25.17 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2013 | REPSOL OIL & GAS USA LLC | Produced Fluid | 341.74 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | REPSOL OIL & GAS USA LLC | Produced Fluid | 27.74 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2014 | REPSOL OIL & GAS USA LLC | Produced Fluid | 407.03 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | REPSOL OIL & GAS USA LLC | Produced Fluid | 54.64 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 77.81 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 61.41 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | REPSOL OIL & GAS USA LLC | Produced Fluid | 331.44 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | REPSOL OIL & GAS USA LLC | Produced Fluid | 390.24 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | REPSOL OIL & GAS USA LLC | Produced Fluid | 376.73 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 143.81 Bbl | REUSE (AT WELL PAD) | |
2018 | REPSOL OIL & GAS USA LLC | Produced Fluid | 93.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | REPSOL OIL & GAS USA LLC | Other Oil & Gas Wastes | 47.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 54.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | REPSOL OIL & GAS USA LLC | Produced Fluid | 254.64 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2022831 | Primary Facility | 2011-11-30 | Routine/Complete Inspection | No Violations Noted | |
2046356 | Primary Facility | 2012-02-29 | Routine/Complete Inspection | No Violations Noted | On Feb 29, 2012 a routine inspection was conducted at the DCNR 587 02 009 pad. The E&S plan was in the mailbox and the last self- inspection was conducted on Feb 27. 2012 by Rich Winters. During today's inspection the E&S plan was reviewed and the site perimeter walked, there were no erosion issues observed. An elevated reading for specific conductivity (approximately 2 mS) in the ditch behind the separators. This should be investigated. - MRN |
2298028 | Primary Facility | 2014-06-27 | Routine/Complete Inspection | No Violations Noted | |
2452917 | Primary Facility | 2016-02-17 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]