If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21171 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.882894,"lon":-77.418033,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Chatham Township | |
Operator Name: SWEPI LP | |
Well Pad ID: 148944 | |
Farm/Lease Name: NEAL 815 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-01-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.882894 | |
Longitude: -77.418033 |
Date | Event |
---|---|
2011-01-31 | New Permit Application |
2011-05-22 | Performed Spud Operation |
2011-07-12 | New Permit Application |
2011-07-26 | Drilling Completion |
2012-07-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-09-23 | 2011-09-23 | 4,524 | 4,591,776 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LGC-36 UC | Gelling Agent | Naphtha, petroleum, hydrotreated heavy | 64742-48-9 | 60.00 | 0.00225000 | ||
Guar gum | 9000-30-0 | 60.00 | 0.00225000 | |||||
FR-66 Friction Reducer | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||
GBW-30 BREAKER | Breaker | Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00001000 | |||
Gasperm 1000 | Surfactant | Isopropanol | 67-63-0 | 30.00 | 0.03 | |||
Terpenes and Terpenoids, sweet orange-oil | 68647-72-3 | 30.00 | 0.03 | |||||
FE-1A Acidizing Agent | Iron Control | Acetic acid | 64-19-7 | 60.00 | 0.00101000 | |||
Acetic anhydride | 108-24-7 | 100.00 | 0.00169000 | |||||
BE-9 Biocide | Biocide | Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00353000 | |||
HAI-OS ACID INHIBITOR | Corrosion Inhibitor | Methanol | 67-56-1 | 60.00 | 0.00017000 | |||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00003000 | |||||
LP-65 | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00253000 | |||
SP Breaker | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00005000 | |||
Fresh Water/Produced Water | Shell | Carrier Fluid | Hydrochloric acid | 7647-01-0 | 100.00 | 90.47 | ||
20 baume HCl | Breakdown | Hydrochloric acid | 7647-01-0 | 100.00 | 0.16 | |||
Natural Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 9.08 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EAST RESOURCES MGMT LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SWEPI LP | 31,218.00 | 24 | 0.00 | 0 | 0.00 | 0 |
2012 | SWEPI LP | 191,111.44 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | SWEPI LP | 144,353.10 | 316 | 0.00 | 0 | 0.00 | 0 |
2014 | SWEPI LP | 16,174.26 | 29 | 0.00 | 0 | 0.00 | 0 |
2015 | SWEPI LP | 97,160.37 | 171 | 0.00 | 0 | 0.00 | 0 |
2016 | SWEPI LP | 122,588.55 | 184 | 0.00 | 0 | 0.00 | 0 |
2017 | SWEPI LP | 103,074.89 | 188 | 0.00 | 0 | 0.00 | 0 |
2018 | SWEPI LP | 95,749.39 | 189 | 0.00 | 0 | 0.00 | 0 |
2019 | SWEPI LP | 79,168.15 | 177 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | SWEPI LP | Produced Fluid | 62.57 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Drilling Fluid Waste | 95.98 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Produced Fluid | 5,855.28 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2012 | SWEPI LP | Fracing Fluid Waste | 1,280.36 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | SWEPI LP | Fracing Fluid Waste | 136.82 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2012 | SWEPI LP | Fracing Fluid Waste | 1,036.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | SWEPI LP | Fracing Fluid Waste | 338.78 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | SWEPI LP | Produced Fluid | 2,606.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Drilling Fluid Waste | 416.06 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Drilling Fluid Waste | 672.89 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Drilling Fluid Waste | 15.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Produced Fluid | 112.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | SWEPI LP | Produced Fluid | 164.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Fracing Fluid Waste | 20.64 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | SWEPI LP | Fracing Fluid Waste | 101.78 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | SWEPI LP | Drill Cuttings | 320.13 Tons | LANDFILL | 301358 |
2014 | SWEPI LP | Produced Fluid | 75.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014 | SWEPI LP | Drilling Fluid Waste | 19.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Fracing Fluid Waste | 0.49 Bbl | STORAGE PENDING DISPOSAL OR REUSE | 7-3115-00193 |
2014 | SWEPI LP | Fracing Fluid Waste | 437.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 637.31 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | SWEPI LP | Produced Fluid | 179.64 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | SWEPI LP | Produced Fluid | 179.17 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | SWEPI LP | Fracing Fluid Waste | 6.88 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015 | SWEPI LP | Produced Fluid | 37.95 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015 | SWEPI LP | Produced Fluid | 2,056.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | SWEPI LP | Waste Water Treatment Sludge | 11.12 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | SWEPI LP | Produced Fluid | 551.19 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | SWEPI LP | Produced Fluid | 152.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | SWEPI LP | Waste Water Treatment Sludge | 7.89 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | SWEPI LP | Produced Fluid | 1,099.72 Bbl | REUSE (AT WELL PAD) | |
2017 | SWEPI LP | Produced Fluid | 641.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2018 | SWEPI LP | Produced Fluid | 168.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2018 | SWEPI LP | Synthetic Liner Materials | 13.70 Tons | LANDFILL | 301358 |
2018 | SWEPI LP | Produced Fluid | 2,721.27 Bbl | REUSE (AT WELL PAD) | |
2018 | SWEPI LP | Produced Fluid | 458.24 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | SWEPI LP | Produced Fluid | 913.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | SWEPI LP | Waste Water Treatment Sludge | 1.62 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | SWEPI LP | Synthetic Liner Materials | 1.19 Tons | LANDFILL | 301358 |
2019 | SWEPI LP | Produced Fluid | 71.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2019 | SWEPI LP | Produced Fluid | 21.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | SWEPI LP | Produced Fluid | 274.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | SWEPI LP | Produced Fluid | 3,269.56 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2004686 | Primary Facility | 2011-09-22 | Routine/Complete Inspection | No Violations Noted | |
2042119 | Primary Facility | 2012-02-13 | Routine/Complete Inspection | No Violations Noted | |
2057510 | Primary Facility | 2012-03-20 | Routine/Complete Inspection | No Violations Noted | |
2138661 | Primary Facility | 2013-02-12 | Follow-up Inspection | No Violations Noted | |
2168108 | Primary Facility | 2013-05-13 | Follow-up Inspection | No Violations Noted | |
2531854 | Primary Facility | 2016-10-24 | Routine/Complete Inspection | No Violations Noted | The Department inspected the SWEPI LP – Neal 815 well pad (ESX09-117-0087) in Chatham Twp., Tioga Co. on 10/24/2016 @ 1245 hours. The weather was 31 degrees and sunny. An adequate site ID sign was observed at the entrance to the access road. The E&S plan, the PPC and the onsite inspection log were located in the mailbox onsite. The receiving stream was listed as UNT to Crooked Creek, WWF. The site was last inspected by company personnel on 10/22/2016 with the following comments “Erosion starting on front side of pad and in corners. Sed trap draining into neighbors back yard”
As of today’s inspection, the site appears to have been restored recently. ST1 and ST2 have been replaced by a large infiltration basin below the fill slope of the pad. Due to recent above average precipitation events multiple areas of erosion are visible on the sidewalls of the basin and off the corners of the pad. Please see attached photos. The discharge pipe from the basin appears to have discharged sediment and mulch. Storm wate |
2559417 | Primary Facility | 2017-02-01 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection (DEP) inspected the SWEPI LP Neal 815 well site in Chatham Twp, Tioga Co. on 2/1/2017. The weather was cloudy, 30 degrees, fresh snow accumulation of 3". No activity observed onsite. No puddles observed on the pad surface. No vegetation was visible, but the site appeared stable. Erosion and sediment controls were not visible due to snow cover, but no issues were observed. No violations were issued during this inspection. Please contact me with any questions. |
2665704 | Primary Facility | 2017-11-29 | Routine/Partial Inspection | No Violations Noted | I met with Jake Huggard (SWEPI) on site. He expects to begin drilling 4 new Utica wells (photo) at this site in about 5 days. JLP |
2671843 | Primary Facility | 2017-12-15 | Routine/Partial Inspection | No Violations Noted | Spoke with Heath McAfee (SWEPI OSR) on site. He said Ensign 162 started drilling the 1st of the new Utica wells (24H) on December 4, 2017. No electrical conductivity readings taken today, as the site is frozen. |
2722272 | Primary Facility | 2018-04-24 | Routine/Complete Inspection | No Violations Noted | The Department of Environmental Protection inspected the Neal 815 Well Site located in Chatham Twp, Tioga Co. on 4/24/2018 @ 1300 hours. The weather was 61 degrees and partly sunny. Phil Tillitt, SWEPI OSR and Justin Midgley, SWEPI Engineer were present onsite for the inspection.
Shell is in the process of fracking 4 Utica wells on the pad, the 21H, 22H, 24H and 26H. The rack is scheduled to be complete in 4 to 5 days. Water was observed in the ditches surrounding the pad. Puddles on the pad surface were tested for conductivity and found to be in normal range. The Infiltration basins below the fill slope of the pad were holding water. CTS#333786 can be closed out at this time. No violations are noted at this time. I departed the site at 1415 hours. -ELN |
2770323 | Primary Facility | 2018-08-28 | Routine/Complete Inspection | No Violations Noted | The DEP conducted a routine inspection of the SWEPI LP Neal 815 Well Pad in Chatham Twp, Tioga County on 8/28/2018 at 1100 hours. The weather was clear, 55% humidity and 85 degrees. Ellie Niles, DEP Water Quality Specialist, was onsite with me.
The drilled Utica Wells onsite are currently flowing back while the Marcellus wells are producing. Company personnel man was onsite monitoring the flowback. We spoke to him and a well tender that showed up about the elevated conductivity in the puddles and they said it would be taken care of. We later arrived onsite at 1500 hours on the way back to the office and the puddles had since been cleaned up (see photos 9 & 10). The violation that was immediately corrected was against the ESCGP# ESX091170087(3). The elevated conductivity in the puddles is considered to be in violation to 25 Pa Code 78a 56(a)-failure to contain a regulated substance generated at or used at a well site. This violation is considered immediately corrected because it was remediated in a timely |
2795723 | Primary Facility | 2018-10-29 | Routine/Complete Inspection | No Violations Noted | Cool/windy at time of inspection. |
For data sources see[8]