Well ID: 37-117-21999 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.596985,"lon":-77.01812,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Liberty Township | |
Operator Name: ROCKDALE MARCELLUS LLC | |
Well Pad ID: 146221 | |
Farm/Lease Name: INGALLS 710 4H | |
License Status: | |
Spud Date: 2018-07-29 | |
Permit Date: 2018-06-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.596985 | |
Longitude: -77.018120 |
Date | Event |
---|---|
Deviated | |
2018-06-28 | New Permit Application |
2018-08-17 | Performed Spud Operation |
2018-10-10 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | ROCKDALE MARCELLUS LLC | 4,018,013.30 | 214 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 73.33 Bbl | REUSE (AT WELL PAD) | |
2018 | ROCKDALE MARCELLUS LLC | Drill Cuttings | 1,652.49 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil | 94.83 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials | 26.95 Tons | LANDFILL | 301358 |
2018 | ROCKDALE MARCELLUS LLC | Produced Fluid | 153.33 Bbl | REUSE (AT WELL PAD) | |
2018 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills | 94.83 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills | 318.92 Tons | LANDFILL | 100955 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 102.29 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Synthetic Liner Materials | 32.95 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil | 267.79 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 16,989.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC022 |
2019 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 297.50 Bbl | REUSE (AT WELL PAD) | |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil | 318.92 Tons | LANDFILL | 100955 |
2019 | ROCKDALE MARCELLUS LLC | Other Oil & Gas Wastes | 197.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC036 |
2019 | ROCKDALE MARCELLUS LLC | Soil Contaminated by Oil & Gas Related Spills | 267.79 Tons | LANDFILL | 301358 |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 10,973.00 Bbl | REUSE (AT WELL PAD) | |
2019 | ROCKDALE MARCELLUS LLC | Produced Fluid | 16,902.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC036 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2760517 | Primary Facility | 2018-08-06 | Routine/Complete Inspection | No Violations Noted | Weather was 78° and sunny at time of inspection. There were no Rockdale Marcellus representatives on location at time of inspection. Well is a spud conductor. Cellar is empty and recently cemented. Mouse hole was also in place. Both the conductor casing and mouse hole had steel plated welded over them at time of inspection. No violations were noted at time of inspection. |
2765849 | Primary Facility | 2018-08-20 | Routine/Complete Inspection | No Violations Noted | Weather was 78° and sunny at time of inspection. There were no Rockdale Marcellus representatives on location at time of inspection. Well had surface and intermediate casing drilled and cemented in place. Reviewed the job logs from the 2 cement jobs and no discrepancies were noted. Well was closed in with a nightcap until the rig moves back onto it to drill down to the kickoff point. No violations were noted at time of inspection. |
2771524 | Primary Facility | 2018-09-06 | Routine/Complete Inspection | No Violations Noted | Weather was 77° and sunny at time of inspection. There were no Rockdale Marcellus representatives on location at time of inspection. Surface and intermediate casing were drilled and cemented to surface. Well had a temporary wellhead installed until the completion rig moves onto location from the Wesneski Pad. Mouse hole had a steel plate welded over the top. No violations were noted at time of inspection. |
2776854 | Primary Facility | 2018-09-19 | Routine/Complete Inspection | No Violations Noted | Weather was 67° and cloudy at time of inspection. Met with Rockdale Marcellus representative Jim Tracey on location. Well was shit in with a nightcap installed. Rig was in the process of rigging up to complete the production casing string on the 2H. After the 2H is complete the rig will walk over this hole and complete it. No violations were noted at time of inspection. |
2778813 | Primary Facility | 2018-09-24 | Routine/Complete Inspection | No Violations Noted | Weather was 62° and partly cloudy at time of inspection. Met with Rockdale Marsellus representative Jim Tracy on location. Well was closed in with a night cap at tome of inspection. Well was covered with a rig mat. This well will be drilled to TD and cemented when the rig currently on site finished with the 2H. Conducted a walk around inspection of location. No violations were noted at time of inspection. |
2784357 | Primary Facility | 2018-10-03 | Routine/Complete Inspection | No Violations Noted | I met Danny Brooks, Rockdale company man, when I arrived. Drilling is completed, and the process of rigging down had just started. Drilling mud was present near the rig on the rig mats; cleaning the mats had not yet begun. Rolloff containers for cuttings in the backyard were on secondary containment, but these appeared to be undersized for the containers. I recommended to Danny that these containments be constructed larger in the future. A small area off of containment between the backyard and the pipe area had what appeared to be a 2' x 2' spot where a small amount of black discoloration, likely drill mud, was lightly smeared on top of the mud. I recommended to Danny that it be shoveled up immediately. |
2840996 | Primary Facility | 2019-02-14 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess overall site conditions. Site was snow-covered at the time of inspection. Three well heads were present. None were staged for production and none had well tags. The Department recommends labeling the well heads with well tags. Three GPUs are present and are in good condition. Two steel double-walled produced water tanks are present and in good condition. There is some erosion present downhill of the outlet pipe for the infiltration basin.
No violations noted. |
For data sources see[7]