If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36389 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.463408,"lon":-79.275269,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Burrell Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: R C L SHUMAKER 4 | |
License Status: | |
Spud Date: 2009-07-07 | |
Permit Date: 2009-01-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.463408 | |
Longitude: -79.275269 |
Date | Event |
---|---|
2009-01-13 | New Permit Application |
2009-07-07 | Performed Spud Operation |
2009-07-13 | Drilling Completion |
2009-07-21 | Perforation |
2009-10-08 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 8247.00 | 106 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 35,599.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 27,510.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 12,097.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 16,710.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 22,339.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 17,001.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 9,279.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 13,945.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 14,478.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 13,704.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Produced Fluid | 16.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid | 16 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1823408 | Primary Facility | 2009-08-19 | Drilling/Alteration | No Violations Noted | Currently, well permit issued on 12/06/08 for well to be completed to 5,000 ft. in depth. Well pad completed with filter fencing and one pit. Well was completed and appeared to be hydro frac. Well head contained 8¿ pipe reduced to 4¿ with 3 shut off valves. Production equipment connected consisted of 100 bbl brine tank, heater and separator. The well was non active during the site inspection. No freeboard issues and drilling pit aligned with 20 mil plastic. Water in the pit was in the process of transportation for disposal to Tunnel town ¿ Water treatment plant in Saltsburg. Well sign and E&S plan located at the entrance way. At the time of inspection, no E&S and IW issues at the site |
1884091 | Primary Facility | 2010-05-10 | Site Restoration | Violation(s) Noted | At the time of inspection, the well was properly tagged and in production. Drilling was completed July 13, 2009. Sign and E&S plan onsite. It is recommended the plan be replaced, as it had been damaged by rain, until final restoration activities have been completed. Access road was stable. Brine tank appeared in sound condition. Several violations were observed, first a failure to properly restore site within 9 months after completion (07.13.09) and upon dept. receiving restoration report. It also appeared no efforts were taken to regrade or mulch and seed the area to permanently stabilize the site. Also observed a failure to implement bmp¿s to reduce sedimentation & erosion issues, I noted significant ponding of water in various locations on and surrounding site. |
2341976 | Primary Facility | 2015-02-05 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no issues were noted and gas well was in operation |
2354569 | Primary Facility | 2015-03-24 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well drilled and appears equipped for production. According to records, drilling occurred 7/07/2009-7/13/2009. |
2528624 | Primary Facility | 2016-10-06 | Routine/Complete Inspection | No Violations Noted | 10/6/2016 - Tag, tank, annulus closed. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1884091 | 586928 | 05/10/2010 | 2010-05-10 | 206REST - Failure to restore site w/in 9 months of completion of drilling or plugging | Environmental Health & Safety | |
1884091 | 586929 | 05/10/2010 | 2010-05-10 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
586928 | 257667 | NOV - Notice of Violation | Comply/Closed | 2010-08-16 | |||
586928 | 263944 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-03 | 2010-11-03 | $7,500.00 | $7,500.00 |
586929 | 257667 | NOV - Notice of Violation | Comply/Closed | 2010-08-16 | |||
586929 | 263944 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-03 | 2010-11-03 | $7,500.00 | $7,500.00 |
For data sources see[7]