Well Details

Well ID: 37-063-36448
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: East Mahoning Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: HARRY M BEATTY 4
License Status:
Spud Date: 2009-08-18
Permit Date: 2009-06-08
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.773773
Longitude: -78.996198

For data sources see[1][2][3]

Well History

Date Event
2009-06-08 New Permit Application
2009-08-17 Performed Spud Operation
2009-08-20 Drilling Completion
2009-08-28 Perforation
2010-01-13 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 PHILLIPS EXPLORATION INC 3747.00 59 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 13,625.00 356 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 6,577.00 255 0.00 0 0.00 0
2012 XTO ENERGY INC 6,639.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 5,964.00 364 0.00 0 0.00 0
2014 XTO ENERGY INC 5,256.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 4,702.10 357 0.00 0 0.00 0
2016 XTO ENERGY INC 4,069.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 2,198.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 3,264.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 2.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 14.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 2.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PHILLIPS EXPLORATION INC Produced Fluid 2.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2014 XTO ENERGY INC Produced Fluid 52.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014 XTO ENERGY INC Produced Fluid 52 Bbl CENT WASTE TRT FAC NPDES PA0095273
2014 XTO ENERGY INC Produced Fluid 32 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 XTO ENERGY INC Produced Fluid 32.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2015 XTO ENERGY INC Produced Fluid 37.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2015 XTO ENERGY INC Produced Fluid 37 Bbl CENT WASTE TRT FAC NPDES PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1781496 Primary Facility 2009-02-03 Routine/Complete Inspection No Violations Noted Well-site not constructed at time of inspection. Inspection performed as a result of a waiver review due to the proximity of the well-site to an Unnamed Tributary of Little Mahoning Creek, which is a HQ-CWF. Due to the HQ-CWF status of the tributary, there are additional E&S concerns that should be addressed in the E&S plan before the Waiver is approved. The Following deficiencies were found with the E&S plan: 1- The Department requests that the operator rock the entire access road with clean durable rock, to limit sedimentation from entering the stream. 2- To further limit sedimentation, the operator should rock the well pad at any location that will be affected by vehicle movement. Any other areas that are affected by earth disturbance activities should be seeded and mulched whenever possible.
1781497 Primary Facility 2009-04-08 Administrative/File Review No Violations Noted 4/2- the E&S plan revisions were received and it was found to be sufficient. If the E&S controls are properly implemented as discussed in the revised plan then there should be no impact to the HQ-CWF.
1823645 Primary Facility 2009-08-20 Drilling/Alteration No Violations Noted drilling in process/E&S ok/ID&pit ok
1826056 Primary Facility 2009-09-03 Routine/Complete Inspection No Violations Noted Site ID sign in place. E&S plan on site. Well recently drilled. Well not equipped for production (well head only on site).
1867027 Primary Facility 2010-02-18 Routine/Complete Inspection No Violations Noted equipped/E&S ok/tag ok

For data sources see[7]