X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-26572

Well Details

Well ID: 37-129-26572
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Loyalhanna Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: MICHAEL J PUZAK 3
License Status: ACTIVE
Spud Date:
Permit Date: 2006-10-11
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.469441
Longitude: -79.513949

For data sources see[1][2][3]

Well History

Date Event
2006-10-11 New Permit Application
2007-09-25 Permit Renewal Application
2008-10-03 Permit Renewal Application
2009-01-29 Performed Spud Operation
2009-02-03 Drilling Completion
2009-02-12 Perforation
2009-08-14 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 PHILLIPS EXPLORATION INC 0.00 0 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 5433.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 3,138.00 365 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 1,830.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 1,200.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 961.00 365 16.11 365 0.00 0
2014 XTO ENERGY INC 533.00 335 0.00 0 0.00 0
2015 XTO ENERGY INC 806.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 838.00 348 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 341.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 468.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 PHILLIPS EXPLORATION INC Produced Fluid 22.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid 185.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid 8.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 PHILLIPS EXPLORATION INC Produced Fluid 25.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid 29.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 PHILLIPS EXPLORATION INC Produced Fluid 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 PHILLIPS EXPLORATION INC Produced Fluid 65.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid 51.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 XTO ENERGY INC Produced Fluid 28.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 XTO ENERGY INC Produced Fluid 52 Bbl CENT WASTE TRT FAC NPDES PA0095273
2013 XTO ENERGY INC Produced Fluid 52.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2013 XTO ENERGY INC Produced Fluid 28 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 XTO ENERGY INC Produced Fluid 47.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014 XTO ENERGY INC Produced Fluid 47 Bbl CENT WASTE TRT FAC NPDES PA0095273
2014 XTO ENERGY INC Produced Fluid 29.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346
2015 XTO ENERGY INC Produced Fluid 28 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 XTO ENERGY INC Produced Fluid 28.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1798045 Primary Facility 2009-05-15 Routine/Complete Inspection No Violations Noted Well site has been drilled, but it is not currently equipped for production. The drilling pits are still present on-site. There are no signs of accelerated erosion and sedimentation noted on the access road or well site. Operator should continue to monitor the access road and well site for erosion and sedimentation until final restoraction activities are complete.
1967608 Primary Facility 2011-04-19 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2495075 Primary Facility 2016-06-22 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appears to be structurally. No E&S issues in relation to site and/or access road.
2554242 Primary Facility 2017-01-23 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus was shut. Well head casing-equipment-grounded 100 bbl fiberglass tank looked ok.
2838341 Primary Facility 2019-02-11 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, equipment and grounded 100 bbl plastic fluid collection tank look ok.

For data sources see[7]

References