If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27866 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.277302,"lon":-79.646568,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Hempfield Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: 147465 | |
Farm/Lease Name: KEROTEST MFG CO 9 | |
License Status: | |
Spud Date: 2009-08-11 | |
Permit Date: 2009-07-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.277302 | |
Longitude: -79.646568 |
Date | Event |
---|---|
2009-07-10 | New Permit Application |
2009-08-11 | Performed Spud Operation |
2009-08-31 | Drilling Completion |
2009-09-09 | Perforation |
2010-08-10 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CONSOL GAS CO | 29345.06 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | CONSOL GAS CO | 55,769.50 | 320 | 0.00 | 0 | 0.00 | 0 |
2011 | CNX GAS CO LLC | 32,099.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 22,426.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 16,436.14 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 15,791.25 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 14,701.21 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 19,651.93 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 16,945.10 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 8,310.24 | 273 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 8,452.00 | 357 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CONSOL GAS CO | Brine | 119.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CONSOL GAS CO | Fracking Fluid | 5,600.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | CONSOL GAS CO | Brine | 550.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009 | CONSOL GAS CO | Drilling | 50.00 Bbl | Other | 37-129-27886 |
2009 | CONSOL GAS CO | Brine | 215.00 Bbl | Other | 37-063-36578 |
2009 | CONSOL GAS CO | Brine | 175.00 Bbl | Injection Disposal Well | 5690201 |
2009 | CONSOL GAS CO | Brine | 981.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2009 | CONSOL GAS CO | Fracking Fluid | 1,200.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2009 | CONSOL GAS CO | Drilling | 1,800.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2010 | CONSOL GAS CO | Produced Fluid | 285.50 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | CONSOL GAS CO | Fracing Fluid Waste | 6,200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CONSOL GAS CO | Produced Fluid | 530.16 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | CONSOL GAS CO | Produced Fluid | 478.94 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CONSOL GAS CO | Drilling Fluid Waste | 1,350.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CONSOL GAS CO | Fracing Fluid Waste | 1,500.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | CONSOL GAS CO | Drilling Fluid Waste | 350.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011 | CONSOL GAS CO | Produced Fluid | 89.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | CNX GAS CO LLC | Produced Fluid | 101.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2012 | CNX GAS CO LLC | Produced Fluid | 22.00 Bbl | Injection Disposal Well | 34-007-22038 |
2012 | CNX GAS CO LLC | Produced Fluid | 100.00 Bbl | Injection Disposal Well | 34-155-23584 |
2014 | CNX GAS CO LLC | Produced Fluid | 65.00 Bbl | Injection Disposal Well | 34-119-28776 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1821212 | Primary Facility | 2009-08-12 | Routine/Complete Inspection | No Violations Noted | Well is actively being drilled at the time of the inspection. No signs of erosion and sedimentation on the well site or access road. The silt fence is installed properly. Operator should continue to monitor the site for erosion and sedimentation until final restoration activities are completed. . |
1821668 | Primary Facility | 2009-08-18 | Drilling/Alteration | No Violations Noted | RIG IS GONE, E&S GOOD, FENCE AROUND PIT. PIT LEVEL IS GOOD. SITE IS CLEAN |
1826654 | Primary Facility | 2009-08-25 | Drilling/Alteration | No Violations Noted | MARCELLUS CONSERVATION FALCON 21 IS RIGGING UP TO DRILL BH. WELL SITE ID SIGN AND TOP HOLE LOG SAY 27866, BH LOG SAYS 27883, PERMIT ON DISPLAY SAYS 27971. CREW IS RIGGING UP TO DRILL. I WILL STOP BACK IN A FEW DAYS TO CHECK IN ON THEM |
1826659 | Primary Facility | 2009-08-31 | Drilling/Alteration | No Violations Noted | FALCON 21 TP ROD HAS PAPERWORK STRAIGHTENED OUT. RIG HIT TD. EVERTHING LOOKS GOOD. AL REKEN FROM DOMINION WAS ON SITE WRAPPING THINGS UP |
1829577 | Primary Facility | 2009-09-14 | Drilling/Alteration | No Violations Noted | UNIVERSAL RIGGING UP TO FRAC, PITS LOOK GOOD, E&S CONTROLS STILL IN PLACE, SECURITY GUARD IS ON LOCATION FOR THE NIGHT, FRAC WILL COMMENCE IN THE MORNING |
1975364 | Primary Facility | 2011-05-19 | Routine/Complete Inspection | No Violations Noted | Producing gas. 4 tanks onsite. Tag and e&s ok. |
2507469 | Primary Facility | 2016-08-03 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and appeared to be in production. The well was tagged. The well apparatus and brine tanks appeared to sound condition. No observation of accelerated erosion or sedimentation in relation to the well site or access road. |
2659824 | Primary Facility | 2017-11-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Two brine tanks within earthen dike and appears structurally sound. No E&S issues. |
2705111 | Primary Facility | 2018-03-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Two brine tanks within earthen dike and appears to be structurally sound. No E&S issues. |
For data sources see[7]