If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-051-24331 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.020536,"lon":-79.678142,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Fayette | |
| Municipality: Dunbar Township | |
| Operator Name: XTO ENERGY INC | |
| Well Pad ID: 149688 | |
| Farm/Lease Name: GEORGE F JOSEPH 11H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2010-03-15 | |
| Well Type: GAS | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Conservation: No | |
| Latitude: 40.020536 | |
| Longitude: -79.678142 |
| Date | Event |
|---|---|
| 2010-03-15 | New Permit Application |
| 2010-06-20 | Performed Spud Operation |
| 2010-09-26 | Drilling Completion |
| 2010-11-20 | Perforation |
| 2010-11-20 | Performed Stimulation |
| 2011-02-17 | DEVIATED |
For data sources see[4]
| Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
|---|---|---|---|---|---|
| 2010-11-20 | 0 | 0 | 0 |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2010 | PHILLIPS EXPLORATION INC | 17,878.00 | 10 | 0.00 | 0 | 0.00 | 0 |
| 2011 | PHILLIPS EXPLORATION INC | 784,436.00 | 364 | 0.00 | 0 | 0.00 | 0 |
| 2012 | XTO ENERGY INC | 422,732.00 | 366 | 0.00 | 0 | 0.00 | 0 |
| 2013 | XTO ENERGY INC | 309,025.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2014 | XTO ENERGY INC | 234,323.00 | 360 | 0.00 | 0 | 0.00 | 0 |
| 2015 | XTO ENERGY INC | 200,592.00 | 365 | 0.00 | 0 | 0.00 | 0 |
| 2016 | XTO ENERGY INC | 124,450.00 | 347 | 0.00 | 0 | 0.00 | 0 |
| 2017 | XTO ENERGY INC | 128,812.61 | 352 | 0.00 | 0 | 0.00 | 0 |
| 2018 | XTO ENERGY INC | 138,854.00 | 347 | 0.00 | 0 | 0.00 | 0 |
| 2019 | XTO ENERGY INC | 125,749.00 | 354 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
| Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
|---|---|---|---|---|---|
| 2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 500.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
| 2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 530.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
| 2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
| 2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 3,996.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
| 2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 1,322.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2012 | XTO ENERGY INC | Produced Fluid | 124.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
| 2012 | XTO ENERGY INC | Produced Fluid | 1,108.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2012 | XTO ENERGY INC | Produced Fluid | 564.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
| 2012 | XTO ENERGY INC | Produced Fluid | 124.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
| 2013 | XTO ENERGY INC | Produced Fluid | 49.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24067 |
| 2013 | XTO ENERGY INC | Produced Fluid | 359.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
| 2013 | XTO ENERGY INC | Produced Fluid | 511.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
| 2013 | XTO ENERGY INC | Produced Fluid | 359.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
| 2014 | XTO ENERGY INC | Produced Fluid | 384.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
| 2014 | XTO ENERGY INC | Produced Fluid | 99.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
| 2014 | XTO ENERGY INC | Produced Fluid | 99.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
| 2014 | XTO ENERGY INC | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
| 2015 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
| 2015 | XTO ENERGY INC | Produced Fluid | 368.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
| 2016 | XTO ENERGY INC | Produced Fluid | 133.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
| 2016 | XTO ENERGY INC | Produced Fluid | 199.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2017 | XTO ENERGY INC | Produced Fluid | 213.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2017 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2018 | XTO ENERGY INC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2018 | XTO ENERGY INC | Produced Fluid | 165.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
| 2019 | XTO ENERGY INC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
| 2019 | XTO ENERGY INC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1894507 | Primary Facility | 2010-06-25 | Drilling/Alteration | No Violations Noted | |
| 1916591 | Primary Facility | 2010-09-27 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, SITE AND PIT ARE GOOD. PHOENIX RIG #5 SKIDDING 9/28/2010 AFTER CEMENTING 51/2" CASING TONIGHT, |
| 1938184 | Primary Facility | 2010-09-05 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PHOENIX # 5 COMPLETED @ 10,973. E&S AND PITS ARE IN GOOD CONDITION. |
For data sources see[8]