If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24406 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.967339,"lon":-79.679131,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Dunbar Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 148718 | |
Farm/Lease Name: KURUTZ UNIT 10H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-11-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.967339 | |
Longitude: -79.679131 |
Date | Event |
---|---|
2010-11-23 | New Permit Application |
2011-02-14 | Performed Spud Operation |
2011-10-23 | Drilling Completion |
2012-07-17 | Perforation |
2012-07-17 | Performed Stimulation |
2016-04-11 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-07-17 | 2012-07-17 | 7,926 | 4,393,654 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.03 | |
Proppant (lbs) | Proppant | 8.51 | 9.37 | |||||
EC6673W | Nalco | Iron Control | Ethylene glycol | 107-21-1 | 30.00 | 0.00675000 | ||
GBW-30 BREAKER | Halliburton Energy Services | Gel Breaker | Carbohydrates | 95.00 | 0.00053000 | |||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00008000 | |||||
7.5 Hcl Acid | Used to open perfs | Hydrochloric acid | 7647-01-0 | 7.50 | 0.26 | |||
ASP 900 | Nalco | Friction Reducer | Ammonium sulfate | 7783-20-2 | 30.00 | |||
Biocide EC 6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00728000 | ||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00121000 | |||||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
EC6486A | Nalco | Scale Inhibitor | Ethylene glycol | 107-21-1 | 30.00 | 0.00733000 | ||
Clean Volume (gals) | Carrier/Base Fluid | 91.49 | 100.00 | |||||
WG-36 GELLING AGENT | Halliburton Energy Services | Water Viscosifier | Guar gum | 9000-30-0 | 100.00 | 0.00226000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-07-17 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 160,884.00 | 153 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 599,669.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 428,715.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 300,777.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 240,813.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 158,260.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 159,006.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 160,098.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 750.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2,342.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,030.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,566.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Drill Cuttings | 11.38 Tons | LANDFILL | 100419 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,974.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 17,821.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 6,781.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 16.15 Tons | LANDFILL | 073 114 654 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,299.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 255.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 40.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,123.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 805.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 288.35 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 428.34 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,540.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 36.67 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 111.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 115.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 149.01 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 273.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 76.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 233.33 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1944018 | Primary Facility | 2011-01-20 | Routine/Complete Inspection | No Violations Noted | |
1944020 | Primary Facility | 2011-01-20 | Routine/Complete Inspection | No Violations Noted | |
1960161 | Primary Facility | 2011-03-24 | Routine/Complete Inspection | No Violations Noted | |
1961051 | Primary Facility | 2011-03-28 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS LOOK GOOD CONDITION.CONDUTOR IS SET,WAITING ON RIG. |
1967348 | Primary Facility | 2011-04-19 | Routine/Complete Inspection | No Violations Noted | |
1973583 | Primary Facility | 2011-05-17 | Routine/Complete Inspection | No Violations Noted | |
1977443 | Primary Facility | 2011-05-31 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
1984023 | Primary Facility | 2011-06-10 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS LOOK IN GOOD CONDITION. DRILLING AT 8127' (TD). MUDDING UP AND CAPPING. |
1984025 | Primary Facility | 2011-06-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLING @ 7402' CLOSE TO (TD). |
1984029 | Primary Facility | 2011-06-03 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION.DRILLING @ 5108' TODAY. |
1984032 | Primary Facility | 2011-05-27 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS IN GOOD CONDITION.CEMENTING INTERMEDIATE STRING @ 2777' TONIGHT. |
1984035 | Primary Facility | 2011-05-25 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. DRILLING AT 1037' TODAY. |
1984039 | Primary Facility | 2011-05-23 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,E&S AND PITS IN GOOD CONDITION. CEMENTING COAL STRING @ 664' TONIGHT. RAN BASKET @ 579' , COAL @ 602'-612'. |
1984041 | Primary Facility | 2011-05-20 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION,CEMENTING SURFACE CASING @ 361' TONIGHT. |
1984042 | Primary Facility | 2011-05-19 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. MOVING ON SETTING UP TO DRILL. |
1984044 | Primary Facility | 2011-03-31 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION. SET 24" CONDUCTOR (2/15/2011). |
1984463 | Primary Facility | 2011-05-30 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S AND PITS IN GOOD CONDITION.DRILL @ 4500' TODAY. APPROX. 10:00AM RECEIVED CALL FROM JIM BRAUNNS OF CHEVRON ABOUT 20 GAL. SPILL OF DISIEL OFF CONTAIMENT. RESPONED AND TOOK PICTURES AND STAYED UNTIL EXCAVATION WAS FINISHED.ON (5/31/2011) ROLLED-OVER TO (WQS) BETH SMOCK. |
1984828 | Primary Facility | 2011-06-29 | Compliance Evaluation | No Violations Noted | |
2005137 | Primary Facility | 2011-09-19 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E& S & PITS IN GOOD CONDITION. RIG MOVING ON SITE(PIONEER DRILLING). |
2015196 | Primary Facility | 2011-10-24 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, PIONEER RIG # 64 (TD) @ 12,259'. RUNNING 51/2" PROD. CASING AND CEMENTING TONIGHT. (KOP @ 8134' ) AND (LANDING IN MARCELLUS @ 9211' ). |
2047985 | Primary Facility | 2012-02-01 | Incident- Response to Accident or Event | Violation(s) Noted | Hole in the liner with water coming in. Violation becasue pit not impermiable. |
2048081 | Primary Facility | 2012-02-09 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On February, 8, 2012, while subcontractor was removing / mixing the material in the cuttings pit, a Chevron employee got a reading of 22 ppm hydrogen sulfide (H2S) on his PPM. All work was halted and the site evacuated until the situation was resolved. |
2048110 | Primary Facility | 2012-02-10 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On February 10, 2012, WQSS Vince Yantko and I visited the Kurutz site to evaluate the situation. The site was still shut down and an environmental contractor was monitoring for hydrogen sulfide. This contractor reported that there were no new detects. |
2048121 | Primary Facility | 2012-02-14 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On February 14, 2012, I stopped at the Kurutz site to check progress. They were still not working on site but the monitoring contractor was still looking for hydrogen sulfide; they still hadn’t any hits. |
2048127 | Primary Facility | 2012-02-17 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On February 15, 2012, Chevron’s contractor again started removing material from the cuttings pit. |
2048173 | Primary Facility | 2012-02-22 | Follow-up Inspection | Violation(s) & Outstanding Violations | On February 22, 2012, Soil Scientist II, Bill Davis, WQS Rich Thomas and I stopped at the Kurutz site to evaluate & delineate the seasonable high water table at the cuttings pit location. Bill’s investigation revealed that this pit does not comply with requirements under Chapter 78 – specifically 78.56 a 4 iii. |
2082367 | Primary Facility | 2012-05-23 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | On May 23, 2012, I checked the progress of the cuttings pit restoration. At inspection the cuttings pit was mostly filled-in. Chevron will probably use the area for frac tanks during stimulation. |
2107502 | Primary Facility | 2012-09-26 | Site Restoration | No Violations Noted | Operator requested restoration extension, Site stable, E&S in place and functioning, Rest of equipment on site to be removed by end on November. Extension approved. |
2150240 | Primary Facility | 2013-03-20 | Compliance Evaluation | No Violations Noted | Pit and liner in violation have now been reclaimed upon well completion. |
2384448 | Primary Facility | 2015-06-26 | Routine/Complete Inspection | No Violations Noted | On 06/26/15 at approximately 1500 hours I conducted a routine complete inspection of the Kurutz Unit. The Act 9 sign was in place and visible. All required documents were present in the mailbox. The site was well vegetated and no signs of accelerated erosion were noted. The well heads appeared to be in good condition. There were no violations noted at the time of inspection. |
2684586 | Primary Facility | 2018-01-22 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Three brine tanks on site. |
2825065 | Primary Facility | 2019-01-10 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1977443 | 612525 | 05/31/2011 | 2011-05-31 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | |
1977443 | 612526 | 05/31/2011 | 2011-05-31 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
2047985 | 633377 | 01/31/2012 | 2012-01-31 | 78.56LINER - Improperly lined pit | Administrative | |
2048173 | 633423 | 02/01/2012 | 2012-02-01 | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
612525 | 271184 | NOV - Notice of Violation | Comply/Closed | 2011-06-29 | |||
612525 | 276021 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-10-19 | 2011-10-19 | $6,000.00 | $6,000.00 |
612526 | 271184 | NOV - Notice of Violation | Comply/Closed | 2011-06-29 | |||
612526 | 276021 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-10-19 | 2011-10-19 | $6,000.00 | $6,000.00 |
633377 | 281079 | NOV - Notice of Violation | Comply/Closed | 2013-03-20 | |||
633423 | 281094 | NOV - Notice of Violation | Comply/Closed | 2013-03-20 |
For data sources see[9]