X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28399

Well Details

Well ID: 37-129-28399
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Derry Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 149487
Farm/Lease Name: USCHAK 1 3H
License Status:
Spud Date:
Permit Date: 2010-07-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.340278
Longitude: -79.363450

For data sources see[1][2][3]

Well History

Date Event
2010-07-23 New Permit Application
2010-10-29 Performed Spud Operation
2011-01-16 Drilling Completion
2011-06-29 Perforation
2013-04-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-07-03 2011-07-03 8,195 2,571,804

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BE-9M Halliburton Energy Services Biocide
Methanol 67-56-1 30.00 0.00607000
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00202000
GBW-30 Breaker Halliburton Energy Services Breaker Carbohydrates 95.00 0.00005000
Hemicellulase enzyme 9012-54-8 15.00 0.00001000
Water Municipal Authority of Derry Borough Carrier/Base Fluid Water 100.00 88.17
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00397000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
WG-36 Gelling Agent Halliburton Energy Services Gel
Guar gum 9000-30-0 100.00 0.00422000
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00006000
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 11.67
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.10

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 XPR RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 XPR RESOURCES LLC 343,063.00 164 0.00 0 0.00 0
2012 XPR RESOURCES LLC 389,496.18 359 0.00 0 0.00 0
2013 XPR RESOURCES LLC 268,420.14 365 0.00 0 0.00 0
2014 XPR RESOURCES LLC 173,851.78 362 0.00 0 0.00 0
2015 XPR RESOURCES LLC 149,452.28 365 0.00 0 0.00 0
2016 XPR RESOURCES LLC 128,233.47 366 0.00 0 0.00 0
2017 XPR RESOURCES LLC 99,697.50 359 0.00 0 0.00 0
2018 XPR RESOURCES LLC 85,289.00 329 0.00 0 0.00 0
2019 XPR RESOURCES LLC 80,261.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 XPR RESOURCES LLC Drill Cuttings 801.00 Tons LANDFILL 100434
2012 XPR RESOURCES LLC Produced Fluid 939.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 441.83 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XPR RESOURCES LLC Produced Fluid 506.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XPR RESOURCES LLC Produced Fluid 623.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XPR RESOURCES LLC Produced Fluid 192.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 165.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XPR RESOURCES LLC Synthetic Liner Materials 24.09 Tons LANDFILL 100434
2016 XPR RESOURCES LLC Other Oil & Gas Wastes 8.40 Tons LANDFILL 100434
2016 XPR RESOURCES LLC Other Oil & Gas Wastes 275.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 XPR RESOURCES LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 XPR RESOURCES LLC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XPR RESOURCES LLC Waste comment only 0.00
2018 XPR RESOURCES LLC Produced Fluid 123.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XPR RESOURCES LLC Produced Fluid 80.00 Bbl REUSE (AT WELL PAD)
2019 XPR RESOURCES LLC Produced Fluid 137.50 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1940941 Primary Facility 2010-12-30 Drilling/Alteration No Violations Noted HORIZONAL MARCELLUS
1949537 Primary Facility 2011-02-02 Routine/Complete Inspection Violation(s) Noted Inspection was conducted during routine site visit.
1953041 Primary Facility 2011-02-08 Compliance Evaluation Outstanding Violations - No Viols Req'd : Inspection was follow-up to 2-2-2011 inspection. Excavation outside of drill pad is on going. Stone and sand removal from this site is being used in construction of the Marco 1H (129-28441) well pad. According to David Freudenrich (Williams) there was an excess of 66,000 cu yds of stone after blasting for the creation of the Uschak well pad. This excess material is now being reused to construct the new pad. HRI is doing the excavation of the excess material from the Uschak site. Tom McCombie (HRI) was contacted concerning the E&S issues at this site. Extra compost sock was added to the site. Mr. McCombie stated that he will be on site tomorrow (2-9-2011) to make improvements to the controls. At the time of the inspection no erosion issues were noted. Site was frozen.
1953061 Primary Facility 2011-02-09 Compliance Evaluation Outstanding Violations - No Viols Req'd Met Tom McCombie (HRI) and Randy Reimold (Williams) to discuss E&S controls. HRI plans to add comnpst socks where needed as well as a rock lined ditch to collect any further runoff from site. Temperatures were in the teens and ground was frozen, therefore no erosion was taking place during site visit.
1953085 Primary Facility 2011-02-15 Compliance Evaluation Outstanding Violations - No Viols Req'd Follow up inspection concerning previous violation (Inspection #1949537) of E&S controls on excavation area.
1953094 Primary Facility 2011-02-16 Compliance Evaluation Outstanding Violations - No Viols Req'd Follow up inspection concerning previous violation (Inspection #1949537) of E&S controls on excavation area.
1953100 Primary Facility 2011-02-18 Compliance Evaluation Outstanding Violations - No Viols Req'd Follow up inspection concerning previous violation (Inspection #1949537) of E&S controls on excavation area.
1956041 Primary Facility 2011-03-07 Routine/Complete Inspection No Violations Noted Wellsite bein prepared for Frac Job
1961180 Primary Facility 2011-03-18 Compliance Evaluation No Violations Noted Follow up inspection concerning previous violation (Inspection #1949537) of E&S controls on excavation area.
1964985 Primary Facility 2011-04-05 Routine/Complete Inspection Violation(s) Noted Site visit was follow-up to 3-18-11 inspection to check on possible free board violation.
1965503 Primary Facility 2011-04-07 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Site visit was follow-up to 4-5-11 inspection which found drill pit to be without freeboard.
1969084 Primary Facility 2011-04-07 Routine/Complete Inspection No Violations Noted Site visit was follow-up to 4-5-11 inspection which found drill pit to be without freeboard.
2020720 Primary Facility 2011-11-18 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS
2048778 Primary Facility 2012-02-28 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS
2052704 Primary Facility 2012-03-13 Routine/Complete Inspection No Violations Noted HORIZONTAL MARCELLUS
2058726 Primary Facility 2012-04-03 Routine/Complete Inspection No Violations Noted NOT RECLAIMED. HAS 4 PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD.
2120205 Primary Facility 2012-12-04 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. No observation of accelerated erosion and sedimentation in relation to the well pad and access road.
2131203 Primary Facility 2013-01-11 Routine/Complete Inspection No Violations Noted HORIZONAL MARCELLUS
2179707 Primary Facility 2013-06-25 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has started the seep remediation located on the fill side of the well site.
2182030 Primary Facility 2013-07-09 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has finished the installation of the infiltration ditch located on the fill side of the well site, additional the Operator has started to install additional infiltration ditches in the fill side area of the pad directly in front of the well heads. At the time of inspection he area located on the cut side of the well pad has not been regraded.
2326012 Primary Facility 2014-12-03 Routine/Complete Inspection No Violations Noted 12/3/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD.
2374570 Primary Facility 2015-05-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus, brine tanks and gas production units appeared to be functioning properly.
2377811 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted 6/9/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND GPU'S ON PAD.
2444215 Primary Facility 2016-01-25 Routine/Complete Inspection No Violations Noted Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road.
2474223 Primary Facility 2016-04-12 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set-tank battery and dike look ok.
2556093 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2556715 Primary Facility 2017-01-27 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road.
2621774 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2681102 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound.

Ongoing pyritic seeps concerns are being addressed under ESCGP ESX10-129-0015, Site ID 735951, Inspection ID 2681073.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1949537 604712 02/02/2011 2011-02-02 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. Administrative
1964985 608673 04/05/2011 2011-04-05 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
604712 267795 NOV - Notice of Violation Comply/Closed 2011-03-30
604712 276810 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-11-07 2011-11-07 $15,500.00 $15,500.00
608673 269472 NOV - Notice of Violation Comply/Closed 2011-04-29
608673 273724 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-08-11 2011-08-11 $7,000.00 $7,000.00

For data sources see[8]

References