If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28399 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.340278,"lon":-79.36345,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 149487 | |
Farm/Lease Name: USCHAK 1 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.340278 | |
Longitude: -79.363450 |
Date | Event |
---|---|
2010-07-23 | New Permit Application |
2010-10-29 | Performed Spud Operation |
2011-01-16 | Drilling Completion |
2011-06-29 | Perforation |
2013-04-29 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-07-03 | 2011-07-03 | 8,195 | 2,571,804 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BE-9M | Halliburton Energy Services | Biocide | |||||
Methanol | 67-56-1 | 30.00 | 0.00607000 | |||||
Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00202000 | |||||
GBW-30 Breaker | Halliburton Energy Services | Breaker | Carbohydrates | 95.00 | 0.00005000 | |||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00001000 | |||||
Water | Municipal Authority of Derry Borough | Carrier/Base Fluid | Water | 100.00 | 88.17 | |||
LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00397000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
WG-36 Gelling Agent | Halliburton Energy Services | Gel | ||||||
Guar gum | 9000-30-0 | 100.00 | 0.00422000 | |||||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00006000 | ||
Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 11.67 | ||
Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.10 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 343,063.00 | 164 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 389,496.18 | 359 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 268,420.14 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 173,851.78 | 362 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 149,452.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 128,233.47 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 99,697.50 | 359 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 85,289.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 80,261.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | XPR RESOURCES LLC | Drill Cuttings | 801.00 Tons | LANDFILL | 100434 |
2012 | XPR RESOURCES LLC | Produced Fluid | 939.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 441.83 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 506.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 623.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 192.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 165.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Synthetic Liner Materials | 24.09 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Other Oil & Gas Wastes | 8.40 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Other Oil & Gas Wastes | 275.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 200.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2018 | XPR RESOURCES LLC | Produced Fluid | 123.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XPR RESOURCES LLC | Produced Fluid | 80.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XPR RESOURCES LLC | Produced Fluid | 137.50 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1940941 | Primary Facility | 2010-12-30 | Drilling/Alteration | No Violations Noted | HORIZONAL MARCELLUS |
1949537 | Primary Facility | 2011-02-02 | Routine/Complete Inspection | Violation(s) Noted | Inspection was conducted during routine site visit. |
1953041 | Primary Facility | 2011-02-08 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | : Inspection was follow-up to 2-2-2011 inspection. Excavation outside of drill pad is on going. Stone and sand removal from this site is being used in construction of the Marco 1H (129-28441) well pad. According to David Freudenrich (Williams) there was an excess of 66,000 cu yds of stone after blasting for the creation of the Uschak well pad. This excess material is now being reused to construct the new pad. HRI is doing the excavation of the excess material from the Uschak site. Tom McCombie (HRI) was contacted concerning the E&S issues at this site. Extra compost sock was added to the site. Mr. McCombie stated that he will be on site tomorrow (2-9-2011) to make improvements to the controls. At the time of the inspection no erosion issues were noted. Site was frozen. |
1953061 | Primary Facility | 2011-02-09 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | Met Tom McCombie (HRI) and Randy Reimold (Williams) to discuss E&S controls. HRI plans to add comnpst socks where needed as well as a rock lined ditch to collect any further runoff from site. Temperatures were in the teens and ground was frozen, therefore no erosion was taking place during site visit. |
1953085 | Primary Facility | 2011-02-15 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | Follow up inspection concerning previous violation (Inspection #1949537) of E&S controls on excavation area. |
1953094 | Primary Facility | 2011-02-16 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | Follow up inspection concerning previous violation (Inspection #1949537) of E&S controls on excavation area. |
1953100 | Primary Facility | 2011-02-18 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | Follow up inspection concerning previous violation (Inspection #1949537) of E&S controls on excavation area. |
1956041 | Primary Facility | 2011-03-07 | Routine/Complete Inspection | No Violations Noted | Wellsite bein prepared for Frac Job |
1961180 | Primary Facility | 2011-03-18 | Compliance Evaluation | No Violations Noted | Follow up inspection concerning previous violation (Inspection #1949537) of E&S controls on excavation area. |
1964985 | Primary Facility | 2011-04-05 | Routine/Complete Inspection | Violation(s) Noted | Site visit was follow-up to 3-18-11 inspection to check on possible free board violation. |
1965503 | Primary Facility | 2011-04-07 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Site visit was follow-up to 4-5-11 inspection which found drill pit to be without freeboard. |
1969084 | Primary Facility | 2011-04-07 | Routine/Complete Inspection | No Violations Noted | Site visit was follow-up to 4-5-11 inspection which found drill pit to be without freeboard. |
2020720 | Primary Facility | 2011-11-18 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2048778 | Primary Facility | 2012-02-28 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2052704 | Primary Facility | 2012-03-13 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2058726 | Primary Facility | 2012-04-03 | Routine/Complete Inspection | No Violations Noted | NOT RECLAIMED. HAS 4 PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD. |
2120205 | Primary Facility | 2012-12-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. No observation of accelerated erosion and sedimentation in relation to the well pad and access road. |
2131203 | Primary Facility | 2013-01-11 | Routine/Complete Inspection | No Violations Noted | HORIZONAL MARCELLUS |
2179707 | Primary Facility | 2013-06-25 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has started the seep remediation located on the fill side of the well site. |
2182030 | Primary Facility | 2013-07-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has finished the installation of the infiltration ditch located on the fill side of the well site, additional the Operator has started to install additional infiltration ditches in the fill side area of the pad directly in front of the well heads. At the time of inspection he area located on the cut side of the well pad has not been regraded. |
2326012 | Primary Facility | 2014-12-03 | Routine/Complete Inspection | No Violations Noted | 12/3/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD. |
2374570 | Primary Facility | 2015-05-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus, brine tanks and gas production units appeared to be functioning properly. |
2377811 | Primary Facility | 2015-06-09 | Routine/Complete Inspection | No Violations Noted | 6/9/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND GPU'S ON PAD. |
2444215 | Primary Facility | 2016-01-25 | Routine/Complete Inspection | No Violations Noted | Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road. |
2474223 | Primary Facility | 2016-04-12 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set-tank battery and dike look ok. |
2556093 | Primary Facility | 2017-01-27 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2556715 | Primary Facility | 2017-01-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2621774 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2681102 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound.
Ongoing pyritic seeps concerns are being addressed under ESCGP ESX10-129-0015, Site ID 735951, Inspection ID 2681073. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1949537 | 604712 | 02/02/2011 | 2011-02-02 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative | |
1964985 | 608673 | 04/05/2011 | 2011-04-05 | 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
604712 | 267795 | NOV - Notice of Violation | Comply/Closed | 2011-03-30 | |||
604712 | 276810 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-11-07 | 2011-11-07 | $15,500.00 | $15,500.00 |
608673 | 269472 | NOV - Notice of Violation | Comply/Closed | 2011-04-29 | |||
608673 | 273724 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-08-11 | 2011-08-11 | $7,000.00 | $7,000.00 |
For data sources see[8]