If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28400 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.340239,"lon":-79.363464,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Derry Township | |
Operator Name: XPR RESOURCES LLC | |
Well Pad ID: 149487 | |
Farm/Lease Name: USCHAK 1 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.340239 | |
Longitude: -79.363464 |
Date | Event |
---|---|
2010-07-23 | New Permit Application |
2010-10-29 | Performed Spud Operation |
2010-12-18 | Drilling Completion |
2011-06-29 | Perforation |
2013-08-16 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-07-04 | 2011-07-04 | 8,185 | 2,291,779 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand- Silica Sand | Halliburton Energy Services | Proppant | Quartz | 14808-60-7 | 100.00 | 11.29 | |
Water | Municipal Authority of Derry Borough | Carrier/Base Fluid | Water | 100.00 | 88.56 | |||
Hydrochloric Acid | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 0.10 | ||
SP Breaker | Halliburton Energy Services | Breaker | Sodium persulfate | 7775-27-1 | 100.00 | 0.00006000 | ||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||
BE-9M | Halliburton Energy Services | Biocide | Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00161000 | ||
Methanol | 67-56-1 | 30.00 | 0.00482000 | |||||
LP-65 | Halliburton Energy Services | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10.00 | 0.00402000 | ||
GBW-30 Breaker | Halliburton Energy Services | Breaker | Carbohydrates | 95.00 | 0.00006000 | |||
Hemicellulase enzyme | 9012-54-8 | 15.00 | 0.00001000 | |||||
WG-36 Gelling Agent | Halliburton Energy Services | Gel | Guar gum | 9000-30-0 | 100.00 | 0.00471000 | ||
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | XPR RESOURCES LLC | 359,432.00 | 161 | 0.00 | 0 | 0.00 | 0 |
2012 | XPR RESOURCES LLC | 365,741.11 | 347 | 0.00 | 0 | 0.00 | 0 |
2013 | XPR RESOURCES LLC | 310,124.48 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | XPR RESOURCES LLC | 176,828.27 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | XPR RESOURCES LLC | 154,529.59 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XPR RESOURCES LLC | 119,102.74 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | XPR RESOURCES LLC | 101,012.38 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | XPR RESOURCES LLC | 82,376.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | XPR RESOURCES LLC | 83,032.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XPR RESOURCES LLC | Produced Fluid | 939.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 441.83 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XPR RESOURCES LLC | Produced Fluid | 506.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XPR RESOURCES LLC | Produced Fluid | 623.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XPR RESOURCES LLC | Produced Fluid | 192.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Produced Fluid | 165.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | XPR RESOURCES LLC | Fracturing Fluid Waste | 14.09 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Waste Water Treatment Sludge | 54.70 Tons | LANDFILL | 100434 |
2016 | XPR RESOURCES LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Produced Fluid | 200.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XPR RESOURCES LLC | Waste comment only | 0.00 | ||
2018 | XPR RESOURCES LLC | Produced Fluid | 123.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XPR RESOURCES LLC | Produced Fluid | 80.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XPR RESOURCES LLC | Produced Fluid | 137.50 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1930274 | Primary Facility | 2010-11-23 | Drilling/Alteration | No Violations Noted | PATTERSON RIG 480 DRILLING ON WILLIAMS PAD. E&S, PITS, AND HOUSE KEEPING GOOD. LINER UNDER RIG, FUEL AND MUD TANKS. DEPTH 1895' |
1939454 | Primary Facility | 2010-12-07 | Drilling/Alteration | No Violations Noted | HORIZONAL MARCELLUS |
1939510 | Primary Facility | 2010-12-14 | Drilling/Alteration | No Violations Noted | drilling @ 9040ft/E&S ok/ID&pits ok |
1940935 | Primary Facility | 2010-12-30 | Drilling/Alteration | No Violations Noted | HORIZONAL MARCELLUS |
1949563 | Primary Facility | 2011-02-02 | Routine/Complete Inspection | No Violations Noted | Inspection was conducted during routine site visit. |
1956042 | Primary Facility | 2011-03-07 | Routine/Complete Inspection | No Violations Noted | Wellsite bein prepared for Frac Job |
1970655 | Primary Facility | 2011-04-19 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2020725 | Primary Facility | 2011-11-18 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS |
2058684 | Primary Facility | 2012-04-03 | Routine/Complete Inspection | No Violations Noted | NOT RECLAIMED. HAS 4 PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD. |
2120206 | Primary Facility | 2012-12-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. No observation of accelerated erosion and sedimentation in relation to the well pad and access road. |
2131193 | Primary Facility | 2013-01-11 | Routine/Complete Inspection | No Violations Noted | HORIZONAL MARCELLUS |
2147106 | Primary Facility | 2013-03-05 | Site Restoration | Pending | Inspection in response to a Notice of Termination in regards to ESX10-129-0015. During the inspection the Department observed several pyritic seeps below the well pad within the limit of disturbance. The Department suggest the Operator investigate the cause of the impacted and submit a plan of action that will address the mitigation and monitoring of the affected area. |
2179709 | Primary Facility | 2013-06-25 | Routine/Complete Inspection | Pending | At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has started the seep remediation located on the fill side of the well site. |
2182031 | Primary Facility | 2013-07-09 | Follow-up Inspection | Pending | At the time of inspection the well was drilled and equipped for production. The associated well apparatus, brine tank, and production heater appear to be in sound condition. The E&S plan was on site and appeared to implemented as outlined in the plan. The Department notes the Operator has finished the installation of the infiltration ditch located on the fill side of the well site, additional the Operator has started to install additional infiltration ditches in the fill side area of the pad directly in front of the well heads. At the time of inspection he area located on the cut side of the well pad has not been regraded. |
2274467 | Primary Facility | 2014-05-21 | Routine/Complete Inspection | No Violations Noted | 5/21/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD. |
2326017 | Primary Facility | 2014-12-03 | Routine/Complete Inspection | No Violations Noted | 12/3/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND 5 GPU'S ON PAD. |
2374575 | Primary Facility | 2015-05-27 | Follow-up Inspection | Pending | At the time of inspection the pyritic seep, first observed in March of 2013, still exists. The pyritic seeps appear to be preventing vegetative growth at the site. The vegetative growth is not uniform and does not meet restoration requirements. As previously discussed as a remedy the Department allowed for the installation of infiltration ditches and has given the site a full growing season. The addition of the ditches and a full growing season has not resulted in the elimination of the pyritic seep. The Department suggests the Operator continue to monitor the site and begin to develop a strategy to eliminate or treat the seep. The Department would also like to request a meeting to discuss this seep and the strategies implemented to resolve this issue. |
2377813 | Primary Facility | 2015-06-09 | Routine/Complete Inspection | No Violations Noted | 6/9/2014 RECLAIMED, VEGETATED, HAS PRODUCED FLUIDS TANKS, AND GPU'S ON PAD. |
2444218 | Primary Facility | 2016-01-25 | Routine/Complete Inspection | No Violations Noted | Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, ground snow covered, no signs of E& S issues in relation to site and/or access road. |
2474221 | Primary Facility | 2016-04-12 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set-tank battery and dike look ok. |
2556092 | Primary Facility | 2017-01-27 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2556713 | Primary Facility | 2017-01-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2621772 | Primary Facility | 2017-08-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2681107 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. Department records does not indicate well site restoration submitted.
Ongoing pyritic seeps concerns are being addressed under ESCGP ESX10-129-0015, Site ID 735951, Inspection ID 2681073. |
For data sources see[8]