{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.474833,"lon":-79.569369,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 148819 | |
Farm/Lease Name: MAMONT SOUTH 1A | |
License Status: | |
Spud Date: | |
Permit Date: 2012-07-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.474833 | |
Longitude: -79.569369 |
Date | Event |
---|---|
2012-07-05 | New Permit Application |
2013-06-10 | Performed Spud Operation |
2013-07-06 | Drilling Completion |
2013-07-26 | Permit Renewal Application |
2013-10-28 | New Permit Application |
2013-12-22 | Drilling Completion |
2014-02-05 | Perforation |
2016-03-30 | DEVIATED |
2016-03-30 | NEWLY DRILLED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-02-12 | 2014-03-10 | 7,795 | 13,912,800 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
Sand (Proppant), DAP-903, DWP-111, DWP-614, DWP-901, BioClear 2000, DWP-NE1, Spearhead Acid, Acetic Acid |
CWS | Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Biocide, Non-Emulsifier, Clean Perforations, Acid | Biotite | 1302-27-8 | 0.1 | 0.00264 | 3407.63 | |
Ammonium Persulfate | 7727-54-0 | 100 | 0.00004000 | 47 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 0.1 | 0.00181 | 2335.45 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0.1 | 0.00181 | 2335.45 | ||||
Apatite | 64476-38-6 | 0.1 | 0.00264 | 3407.63 | ||||
2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 20 | 0.01272 | 16417.3 | ||||
Ilmenite | 98072-94-7 | 0.1 | 0.00189 | 2440.05 | ||||
Sodium chloride | 7647-14-5 | 0.1 | 0.00006000 | 77.85 | ||||
2-Propenoic acid, polymer with sodium phosphonate | 71050-62-9 | 60 | 0.00658 | 8492.55 | ||||
Modified thiourea polymer | 68527-49-1 | 0.1 | 0.00181 | 2335.45 | ||||
Acetic acid | 64-19-7 | 100 | 0.1076 | 138855 | ||||
Sorbitan monooleate | 1338-43-8 | 5 | 0.00283 | 3649.48 | ||||
Isopropanol | 67-63-0 | 40 | 0.00983 | 12682.1 | ||||
Quaternary ammonium compounds, bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite |
68953-58-2 | 5 | 0.00017 | 225.47 | ||||
Calcite | 471-34-1 | 1 | 0.01575 | 20319.2 | ||||
Illite | 12173-60-3 | 1 | 0.00511 | 6588.14 | ||||
Methanol | 67-56-1 | 15 | 0.0073 | 9426.7 | ||||
Dimethylcocoamine, bis(chloroethyl) ether, diquaternary ammonium salt |
68607-28-3 | 40 | 0.00983 | 12682.1 | ||||
Formaldehyde | 50-00-0 | 0.1 | 0.00012 | 155.7 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 40 | 0.02262 | 29195.8 | ||||
Diallyldimethylammonium chloride | 7398-69-8 | 5 | 0.00123 | 1585.27 | ||||
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether | 37251-67-5 | 1.5 | 0.00005000 | 67.64 | ||||
Goethite | 1310-14-1 | 0.1 | 0.00414 | 5342.79 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 9.35216 | 12,068,500.0 | ||||
Propargyl Alcohol | 107-19-7 | 0.1 | 0.0006 | 778.48 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0.1 | 0.00181 | 2335.45 | ||||
Guar gum | 9000-30-0 | 60 | 0.0021 | 2705.67 | ||||
Polyethylene glycol mixture | 25322-68-3 | 70 | 0.01272 | 16417.3 | ||||
Hydrochloric acid | 7647-01-0 | 35 | 0.42229 | 544938 | ||||
Distillates (petroleum), hydrotreated middle | 64742-46-7 | 60 | 0.01907 | 24602.5 | ||||
Poly(oxyethylene)nonylphenol ether | 9016-45-9 | 5 | 0.00283 | 3649.48 | ||||
Water | Customer & CWS | Base Fluid & Mix Water | Water | 7732-18-5 | 100 | 89.9678 | 116,099,000.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 1,080,266.26 | 217 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 983,493.30 | 361 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 711,546.95 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 579,104.09 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 476,863.04 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CNX GAS CO LLC | 402,161.89 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CNX GAS CO LLC | Drilling Fluid Waste | 86.06 Bbl | LANDFILL | 301071 |
2013 | CNX GAS CO LLC | Drill Cuttings | 332.01 Tons | LANDFILL | 301071 |
2013 | CNX GAS CO LLC | Drilling Fluid Waste | 136.75 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2013 | CNX GAS CO LLC | Fracing Fluid Waste | 45.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CNX GAS CO LLC | Drill Cuttings | 548.64 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2014 | CNX GAS CO LLC | Fracing Fluid Waste | 22,167.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CNX GAS CO LLC | Produced Fluid | 62,038.32 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CNX GAS CO LLC | Fracing Fluid Waste | 0.27 Bbl | LANDFILL | 100434 |
2015 | CNX GAS CO LLC | Produced Fluid | 88.92 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2015 | CNX GAS CO LLC | Produced Fluid | 2,025.24 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | CNX GAS CO LLC | Produced Fluid | 22,663.92 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CNX GAS CO LLC | Produced Fluid | 4,257.78 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | CNX GAS CO LLC | Produced Fluid | 325.84 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | CNX GAS CO LLC | Produced Fluid | 421.19 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2016 | CNX GAS CO LLC | Produced Fluid | 1,310.70 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016 | CNX GAS CO LLC | Produced Fluid | 13,224.62 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CNX GAS CO LLC | Produced Fluid | 603.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-16 |
2017 | CNX GAS CO LLC | Produced Fluid | 505.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2017 | CNX GAS CO LLC | Produced Fluid | 2,347.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-10 |
2017 | CNX GAS CO LLC | Produced Fluid | 478.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CNX GAS CO LLC | Produced Fluid | 339.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | 129-20421 |
2017 | CNX GAS CO LLC | Produced Fluid | 603.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2017 | CNX GAS CO LLC | Produced Fluid | 3,261.14 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017 | CNX GAS CO LLC | Produced Fluid | 409.13 Bbl | REUSE (AT WELL PAD) | |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 10.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017 | CNX GAS CO LLC | Produced Fluid | 813.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2017 | CNX GAS CO LLC | Other Oil & Gas Wastes | 15.78 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017 | CNX GAS CO LLC | Produced Fluid | 781.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017 | CNX GAS CO LLC | Produced Fluid | 791.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-32 |
2018 | CNX GAS CO LLC | Produced Fluid | 1,259.43 Bbl | REUSE (AT WELL PAD) | |
2018 | CNX GAS CO LLC | Produced Fluid | 306.89 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 14.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CNX GAS CO LLC | Produced Fluid | 4,511.42 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 10.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018 | CNX GAS CO LLC | Produced Fluid | 91.69 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CNX GAS CO LLC | Produced Fluid | 693.31 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018 | CNX GAS CO LLC | Other Oil & Gas Wastes | 40.20 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018 | CNX GAS CO LLC | Produced Fluid | 1,303.73 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2019 | CNX GAS CO LLC | Produced Fluid | 2,439.09 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | CNX GAS CO LLC | Produced Fluid | 772.72 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019 | CNX GAS CO LLC | Produced Fluid | 236.95 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 10.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | CNX GAS CO LLC | Produced Fluid | 375.62 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019 | CNX GAS CO LLC | Produced Fluid | 797.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CNX GAS CO LLC | Produced Fluid | 379.51 Bbl | REUSE (AT WELL PAD) | |
2019 | CNX GAS CO LLC | Produced Fluid | 1,570.74 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019 | CNX GAS CO LLC | Other Oil & Gas Wastes | 20.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2132719 | Primary Facility | 2013-01-22 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of cutting and removing trees and underbrush. The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2139194 | Primary Facility | 2013-02-13 | Routine/Complete Inspection | No Violations Noted | no violations noted |
2152931 | Primary Facility | 2013-04-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2163794 | Primary Facility | 2013-05-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2174942 | Primary Facility | 2013-06-13 | Routine/Complete Inspection | In Compliance with Policy | Inspection the result of the Operator reporting a breached BMP during a precipitation event. The Operator is in compliance with the Departments notification policy for a BMP breach. During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013. The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed. The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area. The precipitation event appears to exceed the Departments criteria for construction standards. The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2175880 | Primary Facility | 2013-06-13 | Drilling/Alteration | No Violations Noted | Conductor being cemented in at time of inspection. Inspection conducted w/OGI J. Branan. |
2177607 | Primary Facility | 2013-06-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site. The Department has also notes that the additions have been added to the E&S plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2182010 | Primary Facility | 2013-07-05 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. No observation of accelerated erosion or sedimentation in relation to the access road or well site. The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2182467 | Primary Facility | 2013-07-09 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2185971 | Primary Facility | 2013-07-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2189840 | Primary Facility | 2013-08-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2189843 | Primary Facility | 2013-08-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Operator indicated that the well was drilled to the KOP. See inspection id #2189814 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2195022 | Primary Facility | 2013-08-07 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2209071 | Primary Facility | 2013-10-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2216378 | Primary Facility | 2013-10-25 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2217790 | Primary Facility | 2013-10-23 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2222904 | Primary Facility | 2013-11-14 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2226508 | Primary Facility | 2013-11-26 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2243090 | Primary Facility | 2014-02-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was actively preparing the site for stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2249698 | Primary Facility | 2014-02-18 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was actively stimulating the wells located onsite. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2249702 | Primary Facility | 2014-03-03 | Incident- Response to Accident or Event | Pending | Spill reported see hard copy of inspection report for full detailed comments section |
2253171 | Primary Facility | 2014-03-13 | Routine/Complete Inspection | No Violations Noted | See inspection # 2253170 for events and description from the 3/13/2014 inspection. |
2360462 | Primary Facility | 2015-04-13 | Site Restoration | No Violations Noted | Inspection in response to a "Well Site Restoration Report" file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities, authorized by the well permit were complete, and the site has been stabilized. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2361186 | Primary Facility | 2015-04-08 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2393150 | Primary Facility | 2015-07-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2520181 | Primary Facility | 2016-09-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road. |
2551881 | Primary Facility | 2017-01-12 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery looked ok. |
2564505 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2615573 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok. |
2679789 | Primary Facility | 2018-01-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues. |
2700802 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2718036 | Primary Facility | 2018-04-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Five brine tanks within secondary containment and appears structurally sound. No E&S issues. |
2800440 | Primary Facility | 2018-11-08 | Routine/Complete Inspection | No Violations Noted | Well appears to be in good working condition. |
2804816 | Primary Facility | 2018-11-19 | Routine/Complete Inspection | In Compliance with Policy | Operator notified Department of the intent to begin work on the expansion of the well pad. Operator also notified Department of the occurrence of a small earth slip on the restored and terminated well pad.
Department met with Operator on site to review site conditions and inspect small earth slip. At the time of Department inspection, no pad expansion work had commenced. The scope of this expansion project involves disturbing less than 5 acres of land and is covered under an E&S plan. Work area has been staked. Department observed the slip area, which appears to be localized. Operator to repair this during the pad expansion work. |
2855426 | Primary Facility | 2019-02-27 | Administrative/File Review | No Violations Noted | Operator submitted via email and triplicate hard copies of Erosion and Sediment Control Plan and Site Restoration/Post Construction Stormwater Management Plan for the earth disturbance associated with the Mamont South 1 Well Pad Expansion. |