If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28955 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.579353,"lon":-79.66844,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Upper Burrell Township | |
Operator Name: HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | |
Well Pad ID: 154469 | |
Farm/Lease Name: ZEUS | |
License Status: Active | |
Spud Date: 2019-02-07 | |
Permit Date: 2017-10-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.579353 | |
Longitude: -79.668440 |
Date | Event |
---|---|
2017-10-17 | New Permit Application |
2018-09-11 | MOD |
2018-12-20 | Performed Spud Operation |
2019-03-12 | Drilling Completion |
2019-04-03 | Perforation |
2019-04-03 | Performed Stage 1 of Stimulation |
2019-04-03 | Performed Stage 2 of Stimulation |
2019-04-03 | Performed Stimulation |
2019-04-04 | Perforation |
2019-04-04 | Performed Stage 3 of Stimulation |
2019-04-04 | Performed Stage 4 of Stimulation |
2019-04-04 | Performed Stage 5 of Stimulation |
2019-04-04 | Performed Stage 6 of Stimulation |
2019-04-05 | Perforation |
2019-04-05 | Performed Stage 10 of Stimulation |
2019-04-05 | Performed Stage 7 of Stimulation |
2019-04-05 | Performed Stage 8 of Stimulation |
2019-04-05 | Performed Stage 9 of Stimulation |
2019-04-06 | Perforation |
2019-04-06 | Performed Stage 11 of Stimulation |
2019-04-06 | Performed Stage 12 of Stimulation |
2019-04-06 | Performed Stage 13 of Stimulation |
2019-04-07 | Perforation |
2019-04-07 | Performed Stage 14 of Stimulation |
2019-04-07 | Performed Stage 15 of Stimulation |
2019-04-07 | Performed Stage 16 of Stimulation |
2019-04-07 | Performed Stage 17 of Stimulation |
2019-04-08 | Perforation |
2019-04-08 | Performed Stage 18 of Stimulation |
2019-04-08 | Performed Stage 19 of Stimulation |
2019-04-08 | Performed Stage 20 of Stimulation |
2019-04-08 | Performed Stage 21 of Stimulation |
2019-04-08 | Performed Stage 22 of Stimulation |
2019-04-09 | Perforation |
2019-04-09 | Performed Stage 23 of Stimulation |
2019-04-09 | Performed Stage 24 of Stimulation |
2019-04-09 | Performed Stage 25 of Stimulation |
2019-04-09 | Performed Stage 26 of Stimulation |
2019-04-10 | Perforation |
2019-04-10 | Performed Stage 27 of Stimulation |
2019-04-10 | Performed Stage 28 of Stimulation |
2019-04-10 | Performed Stage 29 of Stimulation |
2019-04-10 | Performed Stage 30 of Stimulation |
2019-04-11 | Perforation |
2019-04-11 | Performed Stage 31 of Stimulation |
2019-04-11 | Performed Stage 32 of Stimulation |
2019-04-11 | Performed Stage 33 of Stimulation |
2019-04-11 | Performed Stage 34 of Stimulation |
2019-04-12 | Perforation |
2019-04-12 | Performed Stage 35 of Stimulation |
2019-04-12 | Performed Stage 36 of Stimulation |
2019-04-12 | Performed Stage 37 of Stimulation |
2019-04-12 | Performed Stage 38 of Stimulation |
2019-04-12 | Performed Stage 39 of Stimulation |
2019-04-13 | Perforation |
2019-04-13 | Performed Stage 40 of Stimulation |
2019-04-13 | Performed Stage 41 of Stimulation |
2019-04-13 | Performed Stage 42 of Stimulation |
2019-04-13 | Performed Stage 43 of Stimulation |
2019-04-14 | Perforation |
2019-04-14 | Performed Stage 44 of Stimulation |
2019-04-14 | Performed Stage 45 of Stimulation |
2019-04-14 | Performed Stage 46 of Stimulation |
2019-04-14 | Performed Stage 47 of Stimulation |
2019-04-15 | Perforation |
2019-04-15 | Performed Stage 48 of Stimulation |
2019-04-15 | Performed Stage 49 of Stimulation |
2019-04-16 | Perforation |
2019-04-16 | Performed Stage 50 of Stimulation |
2019-04-16 | Performed Stage 51 of Stimulation |
2019-04-16 | Performed Stage 52 of Stimulation |
2019-04-16 | Performed Stage 53 of Stimulation |
2019-04-17 | Perforation |
2019-04-17 | Performed Stage 54 of Stimulation |
2019-04-17 | Performed Stage 55 of Stimulation |
2019-04-17 | Performed Stage 56 of Stimulation |
2019-04-17 | Performed Stage 57 of Stimulation |
2019-04-18 | Perforation |
2019-04-18 | Performed Stage 58 of Stimulation |
2019-04-18 | Performed Stage 59 of Stimulation |
2019-04-18 | Performed Stage 60 of Stimulation |
2019-12-05 | Deviated |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2019-04-03 | 1 | Sand | 13,582,115 | 8,586 | 5,998 |
2019-04-03 | 2 | Sand | 13,582,115 | 8,559 | 5,804 |
2019-04-04 | 3 | Sand | 13,582,115 | 8,550 | 5,718 |
2019-04-04 | 4 | Sand | 13,582,115 | 8,608 | 5,682 |
2019-04-04 | 5 | Sand | 13,582,115 | 8,530 | 5,539 |
2019-04-04 | 6 | Sand | 13,582,115 | 8,652 | 5,979 |
2019-04-05 | 7 | Sand | 13,582,115 | 8,663 | 6,210 |
2019-04-05 | 8 | Sand | 13,582,115 | 8,638 | 5,616 |
2019-04-05 | 9 | Sand | 13,582,115 | 8,679 | 5,721 |
2019-04-05 | 10 | Sand | 13,582,115 | 8,730 | 5,850 |
2019-04-06 | 11 | Sand | 13,582,115 | 8,672 | 6,081 |
2019-04-06 | 12 | Sand | 13,582,115 | 8,620 | 5,823 |
2019-04-06 | 13 | Sand | 13,582,115 | 8,570 | 5,885 |
2019-04-07 | 14 | Sand | 13,582,115 | 8,672 | 5,898 |
2019-04-07 | 15 | Sand | 13,582,115 | 8,593 | 6,103 |
2019-04-07 | 16 | Sand | 13,582,115 | 8,606 | 5,928 |
2019-04-07 | 17 | Sand | 13,582,115 | 8,463 | 5,847 |
2019-04-08 | 18 | Sand | 13,582,115 | 8,456 | 5,769 |
2019-04-08 | 19 | Sand | 13,582,115 | 8,269 | 5,742 |
2019-04-08 | 20 | Sand | 13,582,115 | 8,458 | 5,544 |
2019-04-08 | 21 | Sand | 13,582,115 | 8,201 | 5,413 |
2019-04-08 | 22 | Sand | 13,582,115 | 8,199 | 5,550 |
2019-04-09 | 23 | Sand | 13,582,115 | 8,352 | 5,861 |
2019-04-09 | 24 | Sand | 13,582,115 | 8,232 | 5,539 |
2019-04-09 | 25 | Sand | 13,582,115 | 8,198 | 5,609 |
2019-04-09 | 26 | Sand | 13,582,115 | 8,242 | 5,632 |
2019-04-10 | 27 | Sand | 13,582,115 | 8,341 | 5,908 |
2019-04-10 | 28 | Sand | 13,582,115 | 8,403 | 5,729 |
2019-04-10 | 29 | Sand | 13,582,115 | 8,374 | 5,553 |
2019-04-10 | 30 | Sand | 13,582,115 | 8,252 | 5,686 |
2019-04-11 | 31 | Sand | 13,582,115 | 8,255 | 5,760 |
2019-04-11 | 32 | Sand | 13,582,115 | 8,009 | 5,396 |
2019-04-11 | 33 | Sand | 13,582,115 | 7,973 | 5,575 |
2019-04-11 | 34 | Sand | 13,582,115 | 7,885 | 5,634 |
2019-04-12 | 35 | Sand | 13,582,115 | 8,199 | 5,763 |
2019-04-12 | 36 | Sand | 13,582,115 | 8,145 | 6,808 |
2019-04-12 | 37 | Sand | 13,582,115 | 7,992 | 5,472 |
2019-04-12 | 38 | Sand | 13,582,115 | 7,964 | 6,468 |
2019-04-12 | 39 | Sand | 13,582,115 | 8,080 | 5,825 |
2019-04-13 | 40 | Sand | 13,582,115 | 7,879 | 5,555 |
2019-04-13 | 41 | Sand | 13,582,115 | 7,626 | 5,214 |
2019-04-13 | 42 | Sand | 13,582,115 | 7,765 | 5,296 |
2019-04-13 | 43 | Sand | 13,582,115 | 7,861 | 5,687 |
2019-04-14 | 44 | Sand | 13,582,115 | 8,003 | 6,225 |
2019-04-14 | 45 | Sand | 13,582,115 | 8,038 | 5,619 |
2019-04-14 | 46 | Sand | 13,582,115 | 7,817 | 5,576 |
2019-04-14 | 47 | Sand | 13,582,115 | 8,018 | 5,974 |
2019-04-15 | 48 | Sand | 13,582,115 | 8,170 | 6,093 |
2019-04-15 | 49 | Sand | 13,582,115 | 8,212 | 6,169 |
2019-04-16 | 50 | Sand | 13,582,115 | 8,420 | 5,873 |
2019-04-16 | 51 | Sand | 13,582,115 | 7,782 | 5,479 |
2019-04-16 | 52 | Sand | 13,582,115 | 7,748 | 5,652 |
2019-04-16 | 53 | Sand | 13,582,115 | 7,955 | 5,970 |
2019-04-17 | 54 | Sand | 13,582,115 | 7,782 | 6,133 |
2019-04-17 | 55 | Sand | 13,582,115 | 7,827 | 6,008 |
2019-04-17 | 56 | Sand | 13,582,115 | 7,686 | 5,869 |
2019-04-17 | 57 | Sand | 13,582,115 | 7,672 | 5,948 |
2019-04-18 | 58 | Sand | 13,582,115 | 7,395 | 5,754 |
2019-04-18 | 59 | Sand | 13,582,115 | 7,807 | 5,795 |
2019-04-18 | 60 | Sand | 13,582,115 | 7,390 | 5,907 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | 2,101,539.00 | 214 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 116.79 Tons | LANDFILL | 100280 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drilling Fluid Waste | 1,245.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 137.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 7,351.98 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 878.13 Tons | LANDFILL | 100280 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 139.98 Tons | LANDFILL | 100172 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 1,410.00 Bbl | REUSE (AT WELL PAD) | |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 304.07 Tons | LANDFILL | 100594 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 237.53 Tons | LANDFILL | 100277 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 42.76 Tons | LANDFILL | 100280 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Synthetic Liner Materials | 6.68 Tons | LANDFILL | 100280 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2819795 | Primary Facility | 2018-12-27 | Routine/Complete Inspection | No Violations Noted | Conductor and cellar set. |
2827341 | Primary Facility | 2019-01-16 | Routine/Complete Inspection | No Violations Noted | Conductor and cellar set.
1/16/19 - Preparing to move rig on site. |
2843582 | Primary Facility | 2019-02-22 | Routine/Complete Inspection | No Violations Noted | At the time of inspection drill rig on site, with drilling activity ongoing. All equipment and material located on secondary containment. Secondary containment appears structurally sound. No E&S issues. |
For data sources see[8]