If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20351 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.63305,"lon":-75.915789,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Lemon Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 147310 | |
Farm/Lease Name: HARVEY UNIT 4H | |
License Status: | |
Spud Date: 2013-11-03 | |
Permit Date: 2013-09-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.633050 | |
Longitude: -75.915789 |
Date | Event |
---|---|
2013-09-05 | New Permit Application |
2013-11-03 | Performed Spud Operation |
2014-03-29 | Drilling Completion |
2014-06-07 | Perforation |
2014-06-12 | Performed Stimulation |
2015-01-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-06-12 | 2014-07-02 | 7,922 | 12,374,500 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.9 | 0 |
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.02 | 0 | |
MCB-8614 | MULTI-CHEM | BIOCIDE | GLUTARALDEHYDE | 111-30-8 | 30 | 0.02 | 0 | |
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE | 68424-85-1 | 5 | 0.003 | 0 | ||||
MCS-2510T | MULTI-CHEM | Scale Inhibitor | ETHYLENE GLYCOL | 107-21-1 | 60 | 0.01 | 0 | |
Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.1 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-06-12 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 834,167.00 | 118 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 2,481,368.98 | 326 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 1,638,398.44 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 1,189,082.37 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 1,053,827.81 | 362 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 818,416.76 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013 | CHIEF OIL & GAS LLC | Drill Cuttings | 422.57 Tons | LANDFILL | 100933 |
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 770.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 1,347.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW018 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 749.91 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 6,079.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 340.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 11,347.77 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 4,677.45 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 996.92 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 64.06 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 168.01 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 80.65 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 251.04 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2221069 | Primary Facility | 2013-11-08 | Drilling/Alteration | No Violations Noted | 20" cond set @ 56' Ziegenfuss |
2238697 | Primary Facility | 2014-01-23 | Drilling/Alteration | No Violations Noted | Tophole rig has moved off. Wells were drilled thru interm. csg. |
2373138 | Primary Facility | 2015-05-26 | Routine/Partial Inspection | No Violations Noted | |
2380154 | Primary Facility | 2015-04-22 | Routine/Complete Inspection | No Violations Noted | Well in prodcution, gauge reading 1700psi. Cellar filled with water, however no visible bubbling. 6 treaters, 6 tanks on location. |
2751925 | Primary Facility | 2018-07-13 | Routine/Complete Inspection | No Violations Noted | JP Reilly Construction personnel were conducting earth disturbance activity related to the installation of the PCSM. There were no violations noted. If you have any questions, please contact me. |
2830890 | Primary Facility | 2019-01-18 | Routine/Complete Inspection | No Violations Noted | I arrived on site to conduct a routine complete investigation in response to a site restoration extension request received from the Operator. The purpose of this inspection was to ensure the two sediment traps onsite had been converted into infiltration berms and an additional infiltration berm installed along the access road.
After performing an administrative review of the plan and a site inspection, I agree that the aforementioned conditions have been fulfilled. During the inspection, I noticed several of the tops on the annular vent tanks had cracked. Operator, please inspect the area and repair any deficiencies observed. No violations were noted. Please feel free to contact me with any questions. |
For data sources see[9]