X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-065-25505

Well Details

Well ID: 37-065-25505
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: McCalmont Township
Operator Name: DANNIC ENERGY CORP
Well Pad ID:
Farm/Lease Name: SWAIN 3
License Status: ACTIVE
Spud Date: 2006-08-03
Permit Date: 2006-03-20
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.031937
Longitude: -78.975116

For data sources see[1][2][3]

Well History

Date Event
2006-03-20 New Permit Application
2006-08-02 Performed Spud Operation
2006-08-08 Drilling Completion
2006-09-13 Perforation
2006-11-16 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2005 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2006 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2007 DANNIC ENERGY CORP 41050 365 0.00 0 0.00 0
2008 DANNIC ENERGY CORP 42,883.33 335 0.00 0 0.00 0
2009 DANNIC ENERGY CORP 37,063.49 365 0.00 0 0.00 0
2010 DANNIC ENERGY CORP 22,394.24 365 0.00 0 0.00 0
2011 DANNIC ENERGY CORP 12,800.86 304 0.00 0 0.00 0
2012 DANNIC ENERGY CORP 7,005.94 305 0.00 0 0.00 0
2013 DANNIC ENERGY CORP 6,078.95 304 0.00 0 0.00 0
2014 DANNIC ENERGY CORP 6,415.00 304 0.00 0 0.00 0
2015 DANNIC ENERGY CORP 5,469.15 365 0.00 0 0.00 0
2016 DANNIC ENERGY CORP 4,806.00 366 0.00 0 0.00 0
2017 DANNIC ENERGY CORP 4,229.00 365 0.00 0 0.00 0
2018 DANNIC ENERGY CORP 3,420.88 365 0.00 0 0.00 0
2019 DANNIC ENERGY CORP 4,616.79 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 DANNIC ENERGY CORP Brine 50.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 DANNIC ENERGY CORP Produced Fluid 41.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2009 DANNIC ENERGY CORP Produced Fluid 121.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 DANNIC ENERGY CORP Produced Fluid 161.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2011 DANNIC ENERGY CORP Produced Fluid 82.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428
2013 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2014 DANNIC ENERGY CORP Produced Fluid 30.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2015 DANNIC ENERGY CORP Produced Fluid 3,360.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2016 DANNIC ENERGY CORP Produced Fluid 40.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2017 DANNIC ENERGY CORP Produced Fluid 65.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2018 DANNIC ENERGY CORP Produced Fluid 75.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428
2019 DANNIC ENERGY CORP Produced Fluid 80.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1554304 Primary Facility 2006-08-03 Drilling/Alteration No Violations Noted
1663365 Primary Facility 2007-11-06 Routine/Complete Inspection No Violations Noted
1698204 Primary Facility 2008-04-09 Compliance Evaluation No Violations Noted
1701348 Primary Facility 2008-04-22 Compliance Evaluation No Violations Noted
1712740 Primary Facility 2008-06-10 Routine/Complete Inspection No Violations Noted
2582339 Primary Facility 2017-04-13 Routine/Complete Inspection No Violations Noted This well was drilled in an agricultural area off of Shale Pit Road in August 2006. No violations were noted during this inspection.

For data sources see[7]

References