If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-065-26152 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.022595,"lon":-78.859031,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Henderson Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: PIFER 1 | |
License Status: | |
Spud Date: 2008-05-08 | |
Permit Date: 2008-02-05 | |
Well Type: COMB. OIL&GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.022595 | |
Longitude: -78.859031 |
Date | Event |
---|---|
2008-02-05 | New Permit Application |
2008-05-08 | Performed Spud Operation |
2008-05-13 | Drilling Completion |
2008-05-28 | Perforation |
2010-04-22 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | DANNIC ENERGY CORP | 10,551.90 | 214 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 9,133.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 6,310.67 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 4,176.07 | 273 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 4,224.35 | 274 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 3,255.84 | 273 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 2,581.00 | 273 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 2,485.01 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 2,534.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 2,385.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 2,397.17 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DANNIC ENERGY CORP | 2,305.87 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2009 | DANNIC ENERGY CORP | Produced Fluid | 175.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2009 | DANNIC ENERGY CORP | Produced Fluid | 82.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2010 | DANNIC ENERGY CORP | Produced Fluid | 231.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2011 | DANNIC ENERGY CORP | Produced Fluid | 156.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2011 | DANNIC ENERGY CORP | Produced Fluid | 400.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2012 | DANNIC ENERGY CORP | Produced Fluid | 160.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2013 | DANNIC ENERGY CORP | Produced Fluid | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2013 | DANNIC ENERGY CORP | Produced Fluid | 240.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2014 | DANNIC ENERGY CORP | Produced Fluid | 480.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2015 | DANNIC ENERGY CORP | Produced Fluid | 16,800.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2016 | DANNIC ENERGY CORP | Produced Fluid | 320.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2017 | DANNIC ENERGY CORP | Produced Fluid | 320.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2018 | DANNIC ENERGY CORP | Produced Fluid | 320.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2019 | DANNIC ENERGY CORP | Produced Fluid | 400.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1706071 | Primary Facility | 2008-05-14 | Drilling/Alteration | No Violations Noted | |
2446187 | Primary Facility | 2016-02-02 | Routine/Complete Inspection | No Violations Noted |
For data sources see[7]