X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-073-20419

Well Details

Well ID: 37-073-20419
Loading map...
Country: United States
State: Pennsylvania
County: Lawrence
Municipality: Pulaski Township
Operator Name: HILCORP ENERGY CO
Well Pad ID: 150779
Farm/Lease Name: PULASKI MIJAVEC 3H
License Status:
Spud Date:
Permit Date: 2014-02-21
Well Type: COMB. OIL&GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.081756
Longitude: -80.484075

For data sources see[1][2][3]

Well History

Date Event
2014-02-21 New Permit Application
2014-04-19 Performed Spud Operation
2014-08-15 New Permit Application
2014-10-20 Drilling Completion
2015-02-12 Perforation
2015-06-18 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-19 2015-04-01 7,754 11,209,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unihib G GeoSafe Acid Inhibitor Ethoxylated alcohol 68002-97-1 35 0.000177036 190.412
Acetophenone 98-86-2 1 0.00000506 5.44
Thiourea 62-56-6 1 0.00000506 5.44
Methanol 67-56-1 5 0.00002529 27.202
Formaldehyde 50-00-0 1 0.00000506 5.44
Short chained glycol ether 112-34-5 60 0.000303491 326.421
Water Hilcorp Carrier/Base Fluid Water 7732-18-5 100 86.9714 93,542,600.0
Unislick ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0283897 30534.7
Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00313728 3374.32
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 11.5221 12,392,700.0
K-BAC 1020 WST Biocide Water 7732-18-5 30 0.007704 8286.08
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.005136 5524.06
Polyethylene glycol 25322-68-3 50 0.01284 13810.1
Hydrochloric Acid (7.5%) Axiall Formation Damage Removal Hydrogen Chloride 7647-01-0 7.5 0.102277 110005

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 HILCORP ENERGY CO 0.00 0 0.00 0 0.00 0
2015 HILCORP ENERGY CO 853,157.00 257 0.00 0 1,195.00 104
2016 HILCORP ENERGY CO 709,839.00 362 0.00 0 0.00 0
2017 HILCORP ENERGY CO 799,126.00 355 0.00 0 0.00 0
2018 HILCORP ENERGY CO 523,864.00 359 0.00 0 0.00 0
2019 HILCORP ENERGY CO 388,982.00 360 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 HILCORP ENERGY CO Fracturing Fluid Waste 1,690.00 Tons CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 HILCORP ENERGY CO Fracturing Fluid Waste 1,690.00 Tons CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 HILCORP ENERGY CO Produced Fluid 529.00 Bbl INJECTION DISPOSAL WELL 34-007-24355
2016 HILCORP ENERGY CO Produced Fluid 902.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2016 HILCORP ENERGY CO Produced Fluid 2,549.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 HILCORP ENERGY CO Produced Fluid 151.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 HILCORP ENERGY CO Produced Fluid 1,624.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2017 HILCORP ENERGY CO Produced Fluid 7,391.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 HILCORP ENERGY CO Produced Fluid 4,928.97 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 HILCORP ENERGY CO Produced Fluid 17,997.19 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 HILCORP ENERGY CO Produced Fluid 10,253.53 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2273390 Primary Facility 2014-05-19 Routine/Partial Inspection No Violations Noted
2296276 Primary Facility 2014-08-18 Routine/Partial Inspection No Violations Noted
2311242 Primary Facility 2014-10-08 Drilling/Alteration No Violations Noted
2313117 Primary Facility 2014-10-16 Drilling/Alteration No Violations Noted
2354895 Primary Facility 2015-03-25 Drilling/Alteration No Violations Noted

For data sources see[8]

References