X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-073-20521

Well Details

Well ID: 37-073-20521
Loading map...
Country: United States
State: Pennsylvania
County: Lawrence
Municipality: North Beaver Township
Operator Name: HILCORP ENERGY CO
Well Pad ID: 148959
Farm/Lease Name: NORTH BEAVER NC DEVELOPMENT
License Status: Active
Spud Date: 2015-10-22
Permit Date: 2015-08-07
Well Type: COMB. OIL&GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.991197
Longitude: -80.432597

For data sources see[1][2][3]

Well History

Date Event
2015-04-18 Performed Stage 8 of Stimulation
2015-08-07 New Permit Application
2015-10-22 Performed Spud Operation
2015-11-16 Drilling Completion
2016-02-03 Perforation
2016-04-16 Performed Stage 1 of Stimulation
2016-04-17 Perforation
2016-04-17 Performed Stage 2 of Stimulation
2016-04-17 Performed Stage 3 of Stimulation
2016-04-17 Performed Stage 4 of Stimulation
2016-04-18 Perforation
2016-04-18 Performed Stage 5 of Stimulation
2016-04-18 Performed Stage 6 of Stimulation
2016-04-18 Performed Stage 7 of Stimulation
2016-04-18 Performed Stage 8 of Stimulation
2016-04-19 Perforation
2016-04-19 Performed Stage 10 of Stimulation
2016-04-19 Performed Stage 11 of Stimulation
2016-04-19 Performed Stage 12 of Stimulation
2016-04-19 Performed Stage 9 of Stimulation
2016-04-20 Perforation
2016-04-20 Performed Stage 13 of Stimulation
2016-04-20 Performed Stage 14 of Stimulation
2016-04-21 Perforation
2016-04-21 Performed Stage 15 of Stimulation
2016-04-21 Performed Stage 16 of Stimulation
2016-04-21 Performed Stage 17 of Stimulation
2016-04-22 Perforation
2016-04-22 Performed Stage 18 of Stimulation
2016-04-22 Performed Stage 19 of Stimulation
2016-04-22 Performed Stage 20 of Stimulation
2016-04-22 Performed Stage 21 of Stimulation
2016-04-22 Performed Stage 22 of Stimulation
2016-04-23 Perforation
2016-04-23 Performed Stage 22 of Stimulation
2016-04-23 Performed Stage 23 of Stimulation
2016-04-24 Perforation
2016-04-24 Performed Stage 24 of Stimulation
2016-04-24 Performed Stage 25 of Stimulation
2016-04-24 Performed Stage 26 of Stimulation
2016-04-24 Performed Stage 27 of Stimulation
2016-04-25 Perforation
2016-04-25 Performed Stage 28 of Stimulation
2017-03-28 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-04-16 2016-04-25 7,960 15,124,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (28%) FSTI Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0547317 76991.9
Water 7732-18-5 72 0.140739 197979
FRA-405 Lubrizol Friction Reducer Distillates, Petroleum, Hydrotreated Light 64742-47-8 30 0.0290894 40920.6
Water 7732-18-5 70 0.0678754 95481.4
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Olefin Proprietary 5 0.00005961 83.855
Methanol 67-56-1 35 0.000417272 586.983
2-Propyn-1-ol 107-19-7 5 0.00005961 83.855
Fatty acids, tall oil 61790-12-3 5 0.00005961 83.855
2-Ethylhexanol 104-76-7 10 0.00011922 167.709
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00005961 83.855
Acetic acid 64-19-7 65 0.000774933 1090.11
Coconut oil acid diethanolamine 68603-42-9 5 0.00005961 83.855
Water Hilcorp Carrier/Base Fluid Water 7732-18-5 100 89.7211 126,212,000.0
BioClear 5000 Lubrizol Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 10 0.00143136 2013.52
Water 7732-18-5 90 0.0128823 18121.7
Sand (100 Mesh Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 9.96081 14,012,000.0
ScaleClear 112S Lubrizol Scale Inhibitor Ethylene 107-21-1 40 0.00405292 5701.3
Water 7732-18-5 60 0.00607938 8551.96

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-04-16 1 SAND 13,996,866 9,979 10,180
2016-04-17 2 SAND 13,996,866 9,893 10,162
2016-04-17 3 SAND 13,996,866 9,964 10,186
2016-04-17 4 SAND 13,996,866 9,986 10,214
2016-04-18 5 SAND 13,996,866 9,988 10,233
2016-04-18 6 SAND 13,996,866 10,011 10,215
2016-04-18 7 SAND 13,996,866 9,938 10,136
2016-04-18 8 SAND 13,996,866 9,834 10,204
2016-04-19 9 SAND 13,996,866 9,967 10,156
2016-04-19 10 SAND 13,996,866 9,988 10,199
2016-04-19 11 SAND 13,996,866 9,868 10,140
2016-04-19 12 SAND 13,996,866 9,932 10,172
2016-04-20 13 SAND 13,996,866 9,986 10,185
2016-04-20 14 SAND 13,996,866 9,944 10,255
2016-04-21 15 SAND 13,996,866 9,941 10,190
2016-04-21 16 SAND 13,996,866 9,959 10,211
2016-04-21 17 SAND 13,996,866 9,973 10,225
2016-04-22 18 SAND 13,996,866 10,016 10,228
2016-04-22 19 SAND 13,996,866 9,971 10,174
2016-04-22 20 SAND 13,996,866 9,972 10,242
2016-04-22 21 SAND 13,996,866 9,900 10,232
2016-04-22 22 SAND 13,996,866 9,940 10,166
2016-04-23 23 SAND 13,996,866 9,899 10,163
2016-04-24 24 SAND 13,996,866 9,898 10,284
2016-04-24 25 SAND 13,996,866 9,987 10,164
2016-04-24 26 SAND 13,996,866 9,988 10,190
2016-04-24 27 SAND 13,996,866 9,852 10,468
2016-04-25 28 SAND 13,996,866 9,922 10,220

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 HILCORP ENERGY CO 0.00 0 0.00 0 0.00 0
2016 HILCORP ENERGY CO 741,436.00 218 0.00 0 0.00 0
2017 HILCORP ENERGY CO 701,685.00 341 0.00 0 0.00 0
2018 HILCORP ENERGY CO 455,262.00 331 0.00 0 0.00 0
2019 HILCORP ENERGY CO 375,954.00 363 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 HILCORP ENERGY CO Drill Cuttings 32.00 Tons CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 HILCORP ENERGY CO Drill Cuttings 32.00 Tons CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 HILCORP ENERGY CO Produced Fluid 902.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2016 HILCORP ENERGY CO Produced Fluid 16,142.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 HILCORP ENERGY CO Produced Fluid 747.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 HILCORP ENERGY CO Produced Fluid 2,127.50 Bbl INJECTION DISPOSAL WELL 34-133-22523
2017 HILCORP ENERGY CO Produced Fluid 24,596.55 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 HILCORP ENERGY CO Produced Fluid 7,898.92 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 HILCORP ENERGY CO Produced Fluid 90,390.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 HILCORP ENERGY CO Produced Fluid 19,676.25 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2418895 Primary Facility 2015-10-23 Drilling/Alteration No Violations Noted
2423078 Primary Facility 2015-11-06 Drilling/Alteration No Violations Noted
2423592 Primary Facility 2015-11-09 Drilling/Alteration No Violations Noted
2425326 Primary Facility 2015-11-17 Drilling/Alteration No Violations Noted
2427305 Primary Facility 2015-11-17 Drilling/Alteration No Violations Noted
2478303 Primary Facility 2016-04-26 Routine/Partial Inspection No Violations Noted
2483124 Primary Facility 2016-05-11 Routine/Partial Inspection No Violations Noted
2491626 Primary Facility 2016-06-09 Routine/Partial Inspection No Violations Noted
2678410 Primary Facility 2018-01-04 Routine/Partial Inspection No Violations Noted Each well onsite has a sand separator connected to it which is connected to the open top flow back tank. Each well has a gas separator and a glycol(dryer) unit connected to it. Here are 4 above ground double wall storage tanks onsite. Tanks are labeled methanol, 50/50 antifreeze, triethylene glycol, or shell mysella. Cement barriers are around well and equipment to protect them from traffic. A flare stack is onsite connected the produced water tanks.

For data sources see[9]

References