X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20286

Well Details

Well ID: 37-081-20286
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Cogan House Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 148290
Farm/Lease Name: EMIG 1H
License Status:
Spud Date:
Permit Date: 2010-04-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.374739
Longitude: -77.159172

For data sources see[1][2][3]

Well History

Date Event
2010-04-14 New Permit Application
2010-07-03 Performed Spud Operation
2010-08-05 Drilling Completion
2010-09-17 Perforation
2010-11-30 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 123,640.00 184 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 144,356.00 364 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 79,870.00 344 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 39,790.00 237 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 24,937.00 255 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 130.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Produced Fluid 611.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 257.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 EXCO RESOURCES PA LLC Drilling Fluid Waste 3,676.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Drilling Fluid Waste 1,630.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Drill Cuttings 40.50 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 109.52 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2013 EXCO RESOURCES PA LLC Produced Fluid 102.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 164.28 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Fracturing Fluid Waste 43.42 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 3,723.68 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 EXCO RESOURCES PA LLC Produced Fluid 47.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2015 EXCO RESOURCES PA LLC Produced Fluid 19.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EXCO RESOURCES PA LLC Produced Fluid 154.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1898598 Primary Facility 2010-07-06 Drilling/Alteration No Violations Noted all ok set 489 ft 13 3/8 casing cemented to surface 6 bbl return
1902285 Primary Facility 2010-07-19 Drilling/Alteration No Violations Noted
1960725 Primary Facility 2011-03-28 Routine/Partial Inspection No Violations Noted
2006647 Primary Facility 2011-09-29 Routine/Complete Inspection No Violations Noted
2059076 Primary Facility 2012-03-02 Routine/Partial Inspection No Violations Noted Coal Mine Rd. (access rd) in poor condition with mud flowing down and off the rd. (vio noted on ESX)
2059087 Primary Facility 2012-03-07 Routine/Partial Inspection No Violations Noted Previous violations on the Coal Mine Rd. corrected
2059097 Primary Facility 2012-03-07 Incident- Response to Accident or Event No Violations Noted Responded to a spill reported by EXCO
2059113 Primary Facility 2012-03-26 Follow-up Inspection Outstanding Violations - No Viols Req'd Some pad has been excavated, underflow dam built, and containment rebuilt.more to come aft rig move
2060559 Primary Facility 2012-04-18 Drilling/Alteration No Violations Noted
2077583 Primary Facility 2012-05-29 Routine/Complete Inspection No Violations Noted Sediment leaving the access road, entering waters of the commonwealth
2100624 Primary Facility 2012-09-13 Routine/Complete Inspection No Violations Noted Previous violations corrected
2102649 Primary Facility 2012-09-21 Drilling/Alteration No Violations Noted
2112553 Primary Facility 2012-10-26 Routine/Complete Inspection No Violations Noted
2364567 Primary Facility 2015-04-16 Routine/Complete Inspection No Violations Noted
2602990 Primary Facility 2017-06-07 Routine/Complete Inspection No Violations Noted Routine Inspection; 6/7/2017.

I entered the site at 12:30 off Coal Mine Road. At the time of the inspection 5 wells were in production. The well site has not been restored in accordance with the approved plans and the ESCGP expired on 3/29/2015. I recommend re-permitting the site to incorporate PCSM as required. No violation cited at this time.

2775737 Primary Facility 2018-09-17 Routine/Complete Inspection No Violations Noted Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. Methanol tank located near well heads. No violations noted.

For data sources see[7]

References