X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20303

Well Details

Well ID: 37-081-20303
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Lycoming Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 149082
Farm/Lease Name: POOR SHOT EAST UNIT 3H
License Status:
Spud Date:
Permit Date: 2010-06-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.337361
Longitude: -77.158103

For data sources see[1][2][3]

Well History

Date Event
2010-06-09 New Permit Application
2010-09-03 Performed Spud Operation
2010-10-21 Drilling Completion
2011-04-28 DEVIATED
2011-09-20 Perforation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-09-17 2011-09-17 7,316 3,273,711

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Calfrac Well Services Propping Agent Quartz 14808-60-7 99.90 12.73
DAP-901 Calfrac Well Services Scale Inhibitor Phosphoric acid ammonium salt 5.00 0.00093000
Amine salt 5.00 0.00093000
Methanol 67-56-1 30.00 0.00557000
Organic phosphonate 30.00 0.00557000
Ammonium chloride 12125-02-9 10.00 0.00186000
Oxyalkylated polyamine 5.00 0.00093000
3 HCl Acid Calfrac Well Services Perforation Breakdown Hydrochloric acid 7647-01-0 100.00 0.72
DWP-972 Calfrac Well Services Oxygen Scavenger Sodium thiosulfate 7772-98-7 31.00 0.01
Water Base Fluid Water 100.00 86.35
DAP-923 Calfrac Well Services Corrosion Inhibitor Fatty acids, tall-oil 61790-12-3 30.00 0.00038000
Methanol 67-56-1 60.00 0.00076000
Ethoxylated C14-15 alcohols 68951-67-7 30.00 0.00038000
Thiourea polymer 68527-49-1 30.00 0.00038000
Propargyl alcohol 107-19-7 10.00 0.00013000
Alkenes, C>10 .alpha.- 64743-02-8 5.00 0.00006000
DWP-612 Calfrac Well Services Friction Reducer No Hazardous Materials 100.00 0.08
DWP-944 Calfrac Well Services Biocide Polyethylene glycol 25322-68-3 70.00 0.02
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 40.00 0.01
DAP-103 Calfrac Well Services Iron Control Citric acid 77-92-9 60.00 0.00318000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 EXCO RESOURCES PA LLC 53,492.00 31 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 687,016.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 417,798.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 324,640.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 254,419.00 342 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 192,334.00 240 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 192,549.00 336 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 167,140.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 152,185.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 114.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Fracing Fluid Waste 95.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 EXCO RESOURCES PA LLC Produced Fluid 4,584.51 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 EXCO RESOURCES PA LLC Drilling Fluid Waste 243.81 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 EXCO RESOURCES PA LLC Fracing Fluid Waste 5,590.95 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA LLC Fracing Fluid Waste 119.05 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 EXCO RESOURCES PA LLC Produced Fluid 623.71 Bbl STORAGE PENDING DISPOSAL OR REUSE
2011 EXCO RESOURCES PA LLC Produced Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2012 EXCO RESOURCES PA LLC Produced Fluid 109.52 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Produced Fluid 7,215.43 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 EXCO RESOURCES PA LLC Fracturing Fluid Waste 26.68 Tons LANDFILL 301358
2012 EXCO RESOURCES PA LLC Fracturing Fluid Waste 4.38 Tons LANDFILL 100585
2012 EXCO RESOURCES PA LLC Drill Cuttings 1.55 Tons LANDFILL 301358
2013 EXCO RESOURCES PA LLC Produced Fluid 164.28 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 219.02 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC024
2013 EXCO RESOURCES PA LLC Produced Fluid 347.79 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 1,659.95 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 EXCO RESOURCES PA LLC Produced Fluid 383.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 660.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 EXCO RESOURCES PA LLC Produced Fluid 220.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Produced Fluid 109.50 Bbl STORAGE PENDING DISPOSAL OR REUSE
2014 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 EXCO RESOURCES PA LLC Produced Fluid 109.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2014 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EXCO RESOURCES PA LLC Produced Fluid 323.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 EXCO RESOURCES PA LLC Produced Fluid 110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EXCO RESOURCES PA LLC Produced Fluid 755.20 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 585.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 420.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 305.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018 EXCO RESOURCES PA LLC Produced Fluid 105.00 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 EXCO RESOURCES PA LLC Produced Fluid 356.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 45.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1919108 Primary Facility 2010-10-07 Drilling/Alteration No Violations Noted ran 13 3/8 to 401 ft 14 bbl ret on cement job**** ran 1400 ft 9 5/8 casing 20 bbl ret cement to surface
2019107 Primary Facility 2011-11-14 Routine/Complete Inspection No Violations Noted
2043860 Primary Facility 2012-02-17 Routine/Complete Inspection No Violations Noted
2082843 Primary Facility 2012-07-12 Routine/Complete Inspection No Violations Noted
2125993 Primary Facility 2012-12-14 Routine/Complete Inspection No Violations Noted
2484060 Primary Facility 2016-05-11 Routine/Complete Inspection No Violations Noted Routine Inspection; 5/11/2016.

I entered the location at 15:17 and began the inspection. The Poor Shot Transfer pad off Stony Gap Road, the Poor Shot Unit 2H well pad, The Poor Shot Unit 3H well pad, and the Poor Shot 1H well pad were all constructed under one ESCGP (ESX10-081-0023). The Poor Shot Freshwater Impoundment was never constructed.

A : At the Poor Shot transfer pad, the pad location remains at its originally constructed size. The Site Restoration Plan calls for Sediment Ditch #1, Sediment Trap #1, and Sediment Ditch #2 to be removed. In addition, erosion is noted on the north side of the pad near the western edge of Diversion Ditch #1. I recommend correcting this erosion as soon as possible. This part of the ESCGP has not been restored as per the ESCGP. B : At the Poor Shot Unit 2H well pad, the Poor Shot East Unit 1H (081-20092) and Poor Shot E Unit 2H (081-20278) wells were both in production. The Site Restoration Plan calls for one 60’ Infiltration Berm to be constructed. The Infiltr

2513021 Primary Facility 2016-08-15 Routine/Complete Inspection No Violations Noted Routine inspection of unconventional well in production. No violations noted at this time.
2841892 Primary Facility 2019-02-11 Routine/Complete Inspection No Violations Noted On February 11, 2019 Department representative Jared Jacobini conducted a routine site inspection at EXCO Poor Shot Unit 3H OG Well. The site sign, drilling permits, weekly E&S reports, and emergency response plan were onsite for review.   A total of two producing wells located on this well pad. All wells are tagged with API/well permit numbers. The cellars are filled with gravel. There is one GPU and two steel vertical production fluids tanks onsite. GPU was not stationed in secondary containment. Production fluid tanks were stationed in secondary containment but the liner is damaged. PSCM's have not been installed. No erosion issues were observed. The site is stable and well vegetated meeting the 70% uniform, perennial, vegetative cover.

Site has not been restored in accordance with PCSM & Restoration ESG29-081-117009.

The Department recommends addressing the following:

1. Production water tank secondary containment liner tears (Photo #1, 2).

2. Placing pump outlet inside the containment (Photo

2849635 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted The weather was cloudy with a temperature of 12 degrees Fahrenheit. Two wells staged for production. Two GPUs in use with no leaks detected. PCSMs could not be determined due to snow cover.

For data sources see[8]

References