X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-053-27755

Well Details

Well ID: 37-053-27755
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Howe Township
Operator Name: CAMERON ENERGY CO
Well Pad ID:
Farm/Lease Name: HETTENBAUGH 5
License Status: ACTIVE
Spud Date:
Permit Date: 2004-09-14
Well Type: COMB. OIL&GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.615951
Longitude: -79.115315

For data sources see[1][2][3]

Well History

Date Event
2004-09-14 New Permit Application
2004-10-25 Performed Spud Operation
2004-10-29 Drilling Completion
2005-01-13 Perforation
2005-07-14 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 SYND ENTERPRISES INC 598.60 365 228.80 365 0.00 0
2008 CATALYST ENERGY INC 648.75 365 78.00 365 0.00 0
2009 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2010 CATALYST ENERGY INC 823.00 365 92.60 365 0.00 0
2011 CATALYST ENERGY INC 469.00 365 0.00 0 0.00 0
2012 CATALYST ENERGY INC 500.00 366 30.60 366 26 366
2014 CATALYST ENERGY INC 0.00 0 13.86 120 0 120
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CAMERON ENERGY CO 229.13 365 34.49 365 0 365
2017 CAMERON ENERGY CO 561.38 270 45.80 270 0.00 0
2018 CAMERON ENERGY CO 261.18 270 34.63 270 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CATALYST ENERGY INC Produced Fluid 15.20 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 CATALYST ENERGY INC Produced Fluid 17.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 14.56 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 14.56 Bbl CENT WASTE TRT FAC NPDES PA0102784
2016 CAMERON ENERGY CO Produced Fluid 4.62 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CAMERON ENERGY CO Produced Fluid 9.23 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CAMERON ENERGY CO Produced Fluid 18.69 Bbl REUSE OTHER THAN ROAD SPREADING
2019 CAMERON ENERGY CO Produced Fluid 2.69 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1413784 Primary Facility 2005-01-25 Routine/Complete Inspection No Violations Noted
1531356 Primary Facility 2006-04-25 Site Restoration Violation(s) Noted
1546397 Primary Facility 2006-06-27 Compliance Evaluation No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1531356 487760 04/25/2006 2006-04-25 206EQUIPRMVL - Failure to remove equipment within 9 months of completion of drilling or plugging Administrative Pipe and pit liner left on location.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
487760 207390 NOV - Notice of Violation Comply/Closed 2007-06-22
487760 217581 ADORD - Administrative Order Comply/Closed 2007-06-22
487760 223260 CDEC - Consent Decree $400,000.00 $375,000.00

For data sources see[7]

References