Well ID: 37-003-22170 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.534778,"lon":-80.117914,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Ohio Township | |
Operator Name: AMER NATURAL RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: CHARLES LENZNER UNIT 4 | |
License Status: PLUGGED & ABANDONED | |
Spud Date: | |
Permit Date: 2011-03-14 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.534778 | |
Longitude: -80.117914 |
Date | Event |
---|---|
2011-03-14 | New Permit Application |
2011-04-29 | Performed Spud Operation |
2011-05-05 | Drilling Completion |
2014-04-08 | NEWLY DRILLED |
2014-05-07 | Drilling Completion |
2016-06-28 | FULLY PLUGGED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | AMER NATURAL RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | AMER NATURAL RESOURCES LLC | Drilling Fluid Waste | 640.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | AMER NATURAL RESOURCES LLC | Drilling Fluid Waste | 70.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1983164 | Primary Facility | 2011-05-12 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. EQUIPTMENT GONE. |
1983733 | Primary Facility | 2011-04-20 | Routine/Complete Inspection | No Violations Noted | On April 20th, 2011 I conducted a routine inspection of the above site. Drilling has not yet started. A site ID sign and E&S plan were posted at the site. The access road could use some additional rock. Access was through Unit #2. All E&S controls were in place and constructed according to the plan at site. Pit was constructed. No accelerated erosion was observed at the time of inspection. The slopes were mulched. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1983810 | Primary Facility | 2011-05-04 | Routine/Complete Inspection | No Violations Noted | On May 4th, 2011 I conducted a routine inspection of the above site. Drilling has started. A site ID sign and E&S plan were posted at the site. The access road was being rocked. Access was through Unit #2. Cementing trucks were onsite. All E&S controls were in place and constructed according to the plan at site. Pit appeared to be in good condition. No accelerated erosion was observed at the time of inspection. Additional E&S were being installed. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
1983827 | Primary Facility | 2011-05-12 | Routine/Complete Inspection | No Violations Noted | On May 12th, 2011 I conducted a routine inspection of the above site. Drilling was completed.. A site ID sign and E&S plan were posted at the site. The access road was in fair condition.. Access was through Unit #2. Pit appeared to be in good condition and still contained fluids. No accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls until the site is restored and 70% vegetative cover is achieved. |
2018482 | Primary Facility | 2011-10-05 | Drilling/Alteration | No Violations Noted | THE PIT IS OPEN. THE WELL WAS NEVER COMPLETED. NO ACTIVITY SINCE MAY 2011. |
2028118 | Primary Facility | 2011-12-08 | Routine/Complete Inspection | No Violations Noted | E&S plan on site. |
2028123 | Primary Facility | 2011-12-08 | Routine/Complete Inspection | No Violations Noted | E&S plan on site. |
2051755 | Primary Facility | 2012-03-20 | Administrative/File Review | No Violations Noted | On December 5, 2012, the Department received a request for a six-month extension for the reclamation of American Natural Resources’ (ANR) Charles Lenzer Unit #4. The well reached total depth on 5/5/11 and restoration should have been done by 2/5/12. |
2065247 | Primary Facility | 2012-04-03 | Routine/Complete Inspection | No Violations Noted | JACK IS SET AND HOOKED UP. THE SITE IS RESTORED. |
2067410 | Primary Facility | 2012-05-11 | Routine/Complete Inspection | No Violations Noted | JACK IS SET. THE WELL APPEARS TO BE PRODUCING. |
2086079 | Primary Facility | 2012-07-24 | Routine/Complete Inspection | No Violations Noted | On March 15, 2012, the Department granted American Natural Resources (ANR) a six-month extension on the reclamation of their Charles Lenzner #4 site. The new reclamation date is August 5, 2012. |
2100542 | Primary Facility | 2012-09-06 | Routine/Complete Inspection | No Violations Noted | On September 6, 2012, WQS John Ley and I stopped at ANR’s’, Charles Lenzner #4 site to check the restoration progress. The site is in fair shape. Overall the it is vegetated but the silt fence is still up. We also did not see signs on the well itself. |
2116540 | Primary Facility | 2012-10-24 | Routine/Complete Inspection | No Violations Noted | PITS ARE GONE. PUMP JACK IS HOOKED UP. THE SITE IS OK. |
2247376 | Primary Facility | 2014-01-22 | Routine/Complete Inspection | No Violations Noted | WELL WAS DRILLED BUT NOT PRODUCED. |
2251858 | Primary Facility | 2014-01-22 | Routine/Complete Inspection | No Violations Noted | WELL WAS DRILLED BUT NOT PRODUCED. WELL TO BE PLUGGED. |
2275063 | Primary Facility | 2014-04-23 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | ALL PRODUCTION EQUIPTMENT HAS BEEN REMOVED FROM THIS WELL. THE WELL IS READY TO BE PLUGGED. |
2275071 | Primary Facility | 2014-05-19 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | A PERMANENT MARKER HAS BEEN INSTALLED ON THIS PLUGGED WELL. |
2275075 | Primary Facility | 2014-05-05 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | FRONTIER ENERGY RIG IS SET UP AND PULLING RODS AND TUBING BEFORE THE WELL IS PLUGGED. |
2275085 | Primary Facility | 2014-05-07 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | THIS WELL HAS BEEN CEMENTED FROM T.D. TO THE SURFACE. MARKER WILL BE INSTALLED LATER. |
2728001 | Primary Facility | 2018-05-04 | Routine/Complete Inspection | No Violations Noted | Well plugged. Monument installed. |
For data sources see[7]