37-005-29610

Well Details

Well ID: 37-005-29610
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Manor Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 147576
Farm/Lease Name: GARY L WARNER ETUX 3-78
License Status: ACTIVE
Spud Date: 2008-03-06
Permit Date: 2007-12-12
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.782821
Longitude: -79.504920

For data sources see[1][2][3]

Well History

Date Event
2007-12-12 New Permit Application
2008-03-06 Performed Spud Operation
2008-03-10 Drilling Completion
2008-09-26 NEWLY DRILLED
2009-05-14 New Permit Application
2009-11-07 Drilling Completion
2009-12-08 Perforation
2010-07-22 DRILLED DEEPER

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2008 MDS ENERGY LTD 70.00 43 0.00 0 0.00 0
2010 MDS ENERGY LTD 53,776.50 282 0.00 0 0.00 0
2011 MDS ENERGY LTD 37,045.00 332 0.00 0 0.00 0
2012 MDS ENERGY LTD 38,268.00 361 0.00 0 0.00 0
2013 MDS ENERGY LTD 30,736.00 352 0.00 0 0.00 0
2014 MDS ENERGY LTD 26,825.00 364 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 20,420.00 365 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 19,124.00 366 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 16,543.00 365 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 15,222.00 364 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 15,530.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 MDS ENERGY LTD Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 MDS ENERGY LTD Fracing Fluid Waste 1,320.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 MDS ENERGY LTD Fracing Fluid Waste 1,960.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 MDS ENERGY LTD Fracing Fluid Waste 60.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 MDS ENERGY LTD Produced Fluid 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 MDS ENERGY LTD Produced Fluid 1,710.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 MDS ENERGY LTD Fracing Fluid Waste 170.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 MDS ENERGY LTD Produced Fluid 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 MDS ENERGY LTD Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2013 MDS ENERGY LTD Produced Fluid 36.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 MDS ENERGY LTD Produced Fluid 65.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2017 MDS ENERGY DEV LLC Produced Fluid 86.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 MDS ENERGY DEV LLC 86.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 MDS ENERGY DEV LLC Produced Fluid 75.00 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1699570 Primary Facility 2008-04-07 Complaint Inspection No Violations Noted
1815255 Primary Facility 2009-07-24 Routine/Complete Inspection No Violations Noted Drilling was originally cocmpleted on 03/10/08. Since that time the operator had obtained a permit to drill deeper, and had prepared the site to do so, and the operator had implemented the neccsary erosion control BMP's onsite. Additional rock may be be required on the access road to insure that it remains stable throughout the duration of the additonal drilling and well stimulation activity.
1844343 Primary Facility 2009-11-10 Drilling/Alteration No Violations Noted drilling complete/E&S ok/ID&pit ok
1845247 Primary Facility 2009-11-23 Routine/Complete Inspection No Violations Noted The drill deeper activity appeared to have been completed at the time of the inspection. Frac pit was in the process of being filled and the site was being prepped to stimulate the well. Below grade pit located onsite, and it had more than the required two-feet of freeboard. Spoke onsite with the E&S crew who were in the process of seeding and mulching the exposed areas of the site which would not be disturbed again until final site restoration. The E&S crew also stated that after the frac pit is filled the access road will be regraded, all access road BMP's will be addressed and repaired if needed, and the road will be rerocked. These actions will address the areas of concern for the site.
1851678 Primary Facility 2009-12-22 Complaint Inspection No Violations Noted The drill deeper activity appeared to have been completed at the time of the inspection. Frac pit had more than the required two feet of freeboard and the liquid contents appeared to be frozen. Below grade pit located onsite, and it had more than the required two-feet of freeboard. Observed no accelerated erosion & sedimentation with respect to the access road or well-site. Operator should continue to monitor erosion controls until final restoration activities have been completed.
1908897 Primary Facility 2010-08-23 Compliance Evaluation No Violations Noted Pit dischrage follow-up inspection.
1924718 Primary Facility 2010-08-20 Complaint Inspection Violation(s) Noted Discharge to stream Channel. Violation of 78.60(b)(5)
1963444 Primary Facility 2011-04-05 Site Restoration No Violations Noted Drilling was completed on 11/07/09. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and appeared to be in sound condition. Noted that vegetation had begun to grow, but did not as of yet appear to be permanent or meet the 70% uniform coverage criteria. The operator should monitor the site to insure that that the vegetative cover attains the 70% uniform permanent coverage. In addition it was observed that the access road required routine maintanence and the well pad required permanent stabilization with clean durable rock.
2203319 Primary Facility 2013-09-06 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. No accelerated erosion or sedimentation was observed in relation to the site and the vegetative cover met the 70% uniform coverage criteria.
2540127 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared ot be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2558968 Primary Facility 2017-02-02 Routine/Complete Inspection No Violations Noted Well tagged-in production. Annulus open. Well head casing-production set equipment-grounded 100 bbl fiberglass tank looked ok.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1924718 598511 08/20/2010 2010-08-20 78.60B - Tophole water discharged improperly Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
598511 263878 NOV - Notice of Violation Comply/Closed 2010-11-05
598511 268136 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-02-25 2011-02-25 $11,500.00 $11,500.00

For data sources see[7]