Well ID: 37-005-29610 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.782821,"lon":-79.50492,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Manor Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 147576 | |
Farm/Lease Name: GARY L WARNER ETUX 3-78 | |
License Status: ACTIVE | |
Spud Date: 2008-03-06 | |
Permit Date: 2007-12-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.782821 | |
Longitude: -79.504920 |
Date | Event |
---|---|
2007-12-12 | New Permit Application |
2008-03-06 | Performed Spud Operation |
2008-03-10 | Drilling Completion |
2008-09-26 | NEWLY DRILLED |
2009-05-14 | New Permit Application |
2009-11-07 | Drilling Completion |
2009-12-08 | Perforation |
2010-07-22 | DRILLED DEEPER |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | MDS ENERGY LTD | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | MDS ENERGY LTD | 70.00 | 43 | 0.00 | 0 | 0.00 | 0 |
2010 | MDS ENERGY LTD | 53,776.50 | 282 | 0.00 | 0 | 0.00 | 0 |
2011 | MDS ENERGY LTD | 37,045.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2012 | MDS ENERGY LTD | 38,268.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY LTD | 30,736.00 | 352 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 26,825.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 20,420.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 19,124.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 16,543.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 15,222.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 15,530.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | MDS ENERGY LTD | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | MDS ENERGY LTD | Fracing Fluid Waste | 1,320.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | MDS ENERGY LTD | Fracing Fluid Waste | 1,960.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | MDS ENERGY LTD | Fracing Fluid Waste | 60.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | MDS ENERGY LTD | Produced Fluid | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | MDS ENERGY LTD | Produced Fluid | 1,710.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | MDS ENERGY LTD | Fracing Fluid Waste | 170.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | MDS ENERGY LTD | Produced Fluid | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2013 | MDS ENERGY LTD | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2013 | MDS ENERGY LTD | Produced Fluid | 36.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | MDS ENERGY LTD | Produced Fluid | 65.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2017 | MDS ENERGY DEV LLC | Produced Fluid | 86.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | MDS ENERGY DEV LLC | 86.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2019 | MDS ENERGY DEV LLC | Produced Fluid | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1699570 | Primary Facility | 2008-04-07 | Complaint Inspection | No Violations Noted | |
1815255 | Primary Facility | 2009-07-24 | Routine/Complete Inspection | No Violations Noted | Drilling was originally cocmpleted on 03/10/08. Since that time the operator had obtained a permit to drill deeper, and had prepared the site to do so, and the operator had implemented the neccsary erosion control BMP's onsite. Additional rock may be be required on the access road to insure that it remains stable throughout the duration of the additonal drilling and well stimulation activity. |
1844343 | Primary Facility | 2009-11-10 | Drilling/Alteration | No Violations Noted | drilling complete/E&S ok/ID&pit ok |
1845247 | Primary Facility | 2009-11-23 | Routine/Complete Inspection | No Violations Noted | The drill deeper activity appeared to have been completed at the time of the inspection. Frac pit was in the process of being filled and the site was being prepped to stimulate the well. Below grade pit located onsite, and it had more than the required two-feet of freeboard. Spoke onsite with the E&S crew who were in the process of seeding and mulching the exposed areas of the site which would not be disturbed again until final site restoration. The E&S crew also stated that after the frac pit is filled the access road will be regraded, all access road BMP's will be addressed and repaired if needed, and the road will be rerocked. These actions will address the areas of concern for the site. |
1851678 | Primary Facility | 2009-12-22 | Complaint Inspection | No Violations Noted | The drill deeper activity appeared to have been completed at the time of the inspection. Frac pit had more than the required two feet of freeboard and the liquid contents appeared to be frozen. Below grade pit located onsite, and it had more than the required two-feet of freeboard. Observed no accelerated erosion & sedimentation with respect to the access road or well-site. Operator should continue to monitor erosion controls until final restoration activities have been completed. |
1908897 | Primary Facility | 2010-08-23 | Compliance Evaluation | No Violations Noted | Pit dischrage follow-up inspection. |
1924718 | Primary Facility | 2010-08-20 | Complaint Inspection | Violation(s) Noted | Discharge to stream Channel. Violation of 78.60(b)(5) |
1963444 | Primary Facility | 2011-04-05 | Site Restoration | No Violations Noted | Drilling was completed on 11/07/09. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and appeared to be in sound condition. Noted that vegetation had begun to grow, but did not as of yet appear to be permanent or meet the 70% uniform coverage criteria. The operator should monitor the site to insure that that the vegetative cover attains the 70% uniform permanent coverage. In addition it was observed that the access road required routine maintanence and the well pad required permanent stabilization with clean durable rock. |
2203319 | Primary Facility | 2013-09-06 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. No accelerated erosion or sedimentation was observed in relation to the site and the vegetative cover met the 70% uniform coverage criteria. |
2540127 | Primary Facility | 2016-11-30 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared ot be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2558968 | Primary Facility | 2017-02-02 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus open. Well head casing-production set equipment-grounded 100 bbl fiberglass tank looked ok. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1924718 | 598511 | 08/20/2010 | 2010-08-20 | 78.60B - Tophole water discharged improperly | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
598511 | 263878 | NOV - Notice of Violation | Comply/Closed | 2010-11-05 | |||
598511 | 268136 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-02-25 | 2011-02-25 | $11,500.00 | $11,500.00 |
For data sources see[7]