If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30625 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.779917,"lon":-79.542775,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: North Buffalo Township | |
Operator Name: MDS ENERGY DEV LLC | |
Well Pad ID: 147444 | |
Farm/Lease Name: THOMAS D VASTINE ETUX 1-44 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-05-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 40.779917 | |
Longitude: -79.542775 |
Date | Event |
---|---|
2010-05-04 | New Permit Application |
2010-05-12 | Performed Spud Operation |
2010-05-17 | Drilling Completion |
2011-02-25 | New Permit Application |
2011-06-21 | Perforation |
2012-10-26 | DRILLED DEEPER |
2013-05-31 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | MDS ENERGY LTD | 287.00 | 41 | 0.00 | 0 | 0.00 | 0 |
2011 | MDS ENERGY LTD | 36,420.00 | 164 | 0.00 | 0 | 0.00 | 0 |
2012 | MDS ENERGY LTD | 43,613.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2013 | MDS ENERGY LTD | 28,385.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2014 | MDS ENERGY LTD | 22,514.00 | 337 | 0.00 | 0 | 0.00 | 0 |
2015 | MDS ENERGY DEV LLC | 16,380.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2016 | MDS ENERGY DEV LLC | 15,069.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2017 | MDS ENERGY DEV LLC | 15,340.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2018 | MDS ENERGY DEV LLC | 14,540.00 | 336 | 0.00 | 0 | 0.00 | 0 |
2019 | MDS ENERGY DEV LLC | 13,274.00 | 354 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | MDS ENERGY LTD | Fracing Fluid Waste | 460.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2011 | MDS ENERGY LTD | Produced Fluid | 440.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | MDS ENERGY LTD | Produced Fluid | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2011 | MDS ENERGY LTD | Produced Fluid | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 |
2011 | MDS ENERGY LTD | Produced Fluid | 9,954.00 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
2011 | MDS ENERGY LTD | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012 | MDS ENERGY LTD | Produced Fluid | 80.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2013 | MDS ENERGY LTD | Produced Fluid | 120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1885019 | Primary Facility | 2010-05-14 | Routine/Complete Inspection | Violation(s) Noted | Crews were on-site at the time of the inspection. Site ID and E&S plan located. |
1887956 | Primary Facility | 2010-05-13 | Drilling/Alteration | No Violations Noted | drilling/E&S inadequate - notified WQS/ID&pit ok |
1887959 | Primary Facility | 2010-05-13 | Drilling/Alteration | No Violations Noted | drilling/E&S being evaluated by WQS/ID&pit ok |
1887961 | Primary Facility | 2010-05-14 | Drilling/Alteration | No Violations Noted | drilling/E&S ok/ID&pit ok |
1893445 | Primary Facility | 2010-06-02 | Compliance Evaluation | No Violations Noted | CEI performed as a follow-up to a previously issued NOV. |
2008613 | Primary Facility | 2011-10-06 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2009567 | Primary Facility | 2011-10-06 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Access road and site erosion controls had been implemented as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. A large frac pit was noted onsite located below the well pad. The pit appeared to contain flowback fluids and it had more than the required two feet of lined freeboard. The Department recommends that the operator endeavor to begin site reclamation activities as soon as possible or implement temporary erosion control measures that will insure minimization of accelerated erosion and sedimentation through the winter until the next growing season. |
2039803 | Primary Facility | 2012-02-03 | Routine/Complete Inspection | Violation(s) Noted | Drilling had been completed. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, however it had not been seeded & mulched or otherwise temporarily stabilized. In addition the access road as it crosses a small unamed drainage way does not have adequate erosion controls to minimize accelerated erosion or sedimentation. Specifically the dirt access road did not have any culverts, broad based dips or other erosion controls to break up total runoff, divert runoff off the access road, or othersie minimize sedement generation or transport. It was noted that the current access road enters the well area from a different direction than the road during well drilling and stimulation. Spoke with operator reprsentative Tyler Krukar via phone regarding the well site and the lack of access road erosion controls. |
2044791 | Primary Facility | 2012-02-23 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Drilling had been completed. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, however it had not been seeded & mulched or otherwise temporarily stabilized. The operator had begun to implement the access road erosion controls, specifically the culverts had clean durable rock placed at the inlets and outlets, and a rock lined turn out had been implemented on the hill side to convey runoff off of the access road. |
2054523 | Primary Facility | 2012-03-28 | Compliance Evaluation | No Violations Noted | Drilling had been completed. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been temporarily stabilized with mulch and it was noted vegetation had begun to grow over the majority of the well pad. The operator had also completed access road erosion control upgrades. The operator should continue to monitor the site for erosion issues and to insure that the 70% uniform coverage criteria is met. |
2081138 | Primary Facility | 2012-07-05 | Site Restoration | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank located onsite appear to be in sound condition. The Department also notes that the site is restored and meets the 70% uniform vegetative coverage criteria. |
2366619 | Primary Facility | 2015-05-01 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimenation in relation to the access road. |
2623703 | Primary Facility | 2017-08-09 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the access road. |
2798101 | Primary Facility | 2018-11-05 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1885019 | 587171 | 05/14/2010 | 2010-05-14 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | The culverts were not properly stabilized which resulted in sediment entering culverts and eventually entering nearby stream. |
1885019 | 587172 | 05/14/2010 | 2010-05-14 | 102.4INADPLN - E&S Plan not adequate | Administrative | The plan, as written, should have been adequate to control E&S. However, field changes were made to the plan that compromised the effectiveness of the plan. |
1885019 | 587173 | 05/14/2010 | 2010-05-14 | 401 CSL - Discharge of pollutional material to waters of Commonwealth. | Environmental Health & Safety | There was a steady flow of sediment laden water exiting the culverts and entering directly into the stream. |
1885019 | 587174 | 05/14/2010 | 2010-05-14 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | Environmental Health & Safety | There was a steady flow of sediment laden water exiting the culvert and entering directly into the stream. |
1885019 | 587175 | 05/14/2010 | 2010-05-14 | 691.401WPD - Failure to prevent sediment or other pollutant discharge into waters of the Commonwealth. | Environmental Health & Safety | There was a steady flow of sediemtn laden water exiting the culvert and entering directly into the stream. |
2039803 | 631175 | 02/03/2012 | 2012-02-03 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
587171 | 257791 | NOV - Notice of Violation | Comply/Closed | 2010-06-02 | |||
587171 | 261868 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-08-31 | 2010-08-31 | $5,000.00 | $5,000.00 |
587172 | 257791 | NOV - Notice of Violation | Comply/Closed | 2010-06-02 | |||
587172 | 261868 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-08-31 | 2010-08-31 | $5,000.00 | $5,000.00 |
587173 | 257791 | NOV - Notice of Violation | Comply/Closed | 2010-06-02 | |||
587173 | 261868 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-08-31 | 2010-08-31 | $5,000.00 | $5,000.00 |
587174 | 257791 | NOV - Notice of Violation | Comply/Closed | 2010-06-02 | |||
587174 | 261868 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-08-31 | 2010-08-31 | $5,000.00 | $5,000.00 |
587175 | 257791 | NOV - Notice of Violation | Comply/Closed | 2010-06-02 | |||
587175 | 261868 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-08-31 | 2010-08-31 | $5,000.00 | $5,000.00 |
631175 | 280178 | NOV - Notice of Violation | Comply/Closed | 2012-03-28 | |||
631175 | 295546 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-03-21 | 2013-03-21 | $4,000.00 | $4,000.00 |
For data sources see[7]