Well Details

Well ID: 37-005-30887
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 147569
Farm/Lease Name: R MORRIS
License Status: Plugged and Abandoned
Spud Date: 2011-11-23
Permit Date: 2011-09-29
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 40.845425
Longitude: -79.553778

For data sources see[1][2][3]

Well History

Date Event
2011-09-29 New Permit Application
2011-11-22 Performed Spud Operation
2011-12-06 Drilling Completion
2011-12-08 Perforation
2012-10-26 NEWLY DRILLED
2018-05-14 Begin Plugging
2018-05-18 Finished Plugging
2018-08-21 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2012 MDS ENERGY LTD 67,271.00 354 0.00 0 0.00 0
2013 MDS ENERGY LTD 34,974.00 360 0.00 0 0.00 0
2014 MDS ENERGY LTD 24,916.00 349 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 18,794.00 346 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 16,004.00 346 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 17,418.00 356 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 7,181.00 126 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 MDS ENERGY LTD Fracing Fluid Waste 105.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011 MDS ENERGY LTD Fracing Fluid Waste 420.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 MDS ENERGY LTD Fracing Fluid Waste 105.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 MDS ENERGY LTD Produced Fluid 322.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 MDS ENERGY LTD Fracing Fluid Waste 90.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2012 MDS ENERGY LTD Produced Fluid 320.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2013 MDS ENERGY LTD Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006
2013 MDS ENERGY LTD Produced Fluid 89.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2015 MDS ENERGY DEV LLC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 MDS ENERGY DEV LLC Produced Fluid 80.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2018 MDS ENERGY DEV LLC Produced Fluid 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 MDS ENERGY DEV LLC Drilling Fluid Waste 100.00 Tons INJECTION DISPOSAL WELL 34-155-23196

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2004693 Primary Facility 2011-09-21 Routine/Complete Inspection No Violations Noted Operator submitted Permit Application for Drilling or Altering a Well (drilled within 200 feet from any existing building) dated 08-24-11.
2021086 Primary Facility 2011-11-21 Routine/Complete Inspection No Violations Noted Site construction completed, drilling had not commenced. Drill pit located onsite and it was properly lined. All site erosion controls were implemented as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
2023325 Primary Facility 2011-11-29 Drilling/Alteration No Violations Noted First Class Energy Rig#1 Schramm drilling at 1170'at time of inspection. Pit lined and freeboard maintained.
2026780 Primary Facility 2011-12-12 Drilling/Alteration No Violations Noted Flaring well post frac at time of inspection. Pit lined and freeboard maintained.
2123560 Primary Facility 2012-11-26 Routine/Complete Inspection Pending Site was apparently restored to its approximate original topography with the exception of a soil pile left at request of the landowner. Site was seeded and mulched. Incipient erosion trails were evident which, if left untreated, could result in severe accelerated erosion. Department recommends the operator closely monitor the situation and take appropriate measures to preclude accelerated erosion and establish 70% uniform vegetative cover.
2161447 Primary Facility 2013-04-12 Routine/Complete Inspection In Compliance with Policy Site was equipped for production. Brine tanks and production equipment were in apparent good order. No production fluid leaks to environment were evident. Incipient erosion trails observed on previous inspection had been filled, seeded, and mulched. No erosion and sedimentation issues were apparent.
2173557 Primary Facility 2013-06-07 Site Restoration No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Well-site had been appropriately restored and the was no evidence observed of accelerated erosion or sedimentation in relation to the site or access road.
2442009 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted Well is tagged-in production. Annulus is open. Well head casing-production equipment-2-100 bbl tanks all look ok.
2480931 Primary Facility 2016-05-02 Routine/Complete Inspection No Violations Noted Well tagged-in production-equipment ok. Responded to a leaking gas call. Unplugged 1/2" ball valve handle on meter run had been bumped open. Operator closed valve handle-removed handle from valve stem and installed a 1/2" plug in valve to prevent any possible future release of gas from valve. Requested that Operator check all wells to ensure that valves had plugs installed in them.
2727939 Primary Facility 2018-05-09 Plugging(Includes Plugged/Mined Through) No Violations Noted The operator had moved a plugging Rig in and had it set up over the well at the time of this inspection. The tubing was also on location to run in the well bore and cement through after establishing the approved attainable TD. All equipment on site looked ok.
2729513 Primary Facility 2018-05-14 Plugging(Includes Plugged/Mined Through) No Violations Noted The plugging operator had the well open to attempt to blow it down at the time of this inspection. The well was blowing steady gas so the rig crew called for 50 bbl of fresh water and was waiting on their water to arrive so they could pump it down the well to load the hole and attempt to kill the well so they could set their bottom cement plug. All equipment on site looked ok.
2730861 Primary Facility 2018-05-17 Plugging(Includes Plugged/Mined Through) No Violations Noted The crew ran the bottom cement plug from 6478' to 4550'. They then shot the 4 1/2" pipe off at 4300', could not pull the pipe after exerting over 160% of pulling pressure, so they perforated the pipe with 4 shots every 100' clear up to 2930' and shot off the pipe at 2930'. The Rig was running pipe back in the hole to attempt to pull the rest of the 4 1/2" pipe at the time of my inspection.
2734311 Primary Facility 2018-05-23 Complaint Inspection No Violations Noted At the time of this inspection, plugging of the well appears to have been completed.

Landowner and operator representative Randy Morris arrived on-site at approximately 1110.

For data sources see[7]