If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30917 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.825156,"lon":-79.475475,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Rayburn Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 149253 | |
Farm/Lease Name: SCHRECENGOST PAD 8 UNIT 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-09-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.825156 | |
Longitude: -79.475475 |
Date | Event |
---|---|
2011-09-29 | New Permit Application |
2012-01-27 | Performed Spud Operation |
2012-04-05 | New Permit Application |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-05-18 | 2012-05-18 | 6,740 | 5,037,331 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | Calfrac Well Services | Clean Perforations | Polyoxyalkylenes | 30.00 | 0.00041000 | ||
Ilmenite (FeTiO3), conc. | 98072-94-7 | 0.10 | 0.00151000 | |||||
Citric acid | 77-92-9 | 60.00 | 0.00289000 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||||
Formalin | 50-00-0 | 0.10 | 0.00003000 | |||||
Acetic acid | 64-19-7 | 1.00 | 0.00019000 | |||||
Sodium chloride | 7647-14-5 | 1.00 | 0.00001000 | |||||
Fatty acids | 30.00 | 0.00041000 | ||||||
Olefin | 5.00 | 0.00007000 | ||||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00041000 | |||||
Hydrochloric acid | 7647-01-0 | 37.00 | 0.29 | |||||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00114000 | |||||
Carbonic acid calcium salt (1:1) | 471-34-1 | 1.00 | 0.02 | |||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
Apatite | 64476-38-6 | 0.10 | 0.00279000 | |||||
Oxyalkylated polyamine | 5.00 | 0.00095000 | ||||||
Amine salt | 5.00 | 0.00095000 | ||||||
Polyoxyalkylenes surfactant | 5.00 | 0.00419000 | ||||||
Polyethylene glycol | 25322-68-3 | 70.00 | 0.01 | |||||
Quartz | 14808-60-7 | 100.00 | 14.34 | |||||
Biotite | 1302-27-8 | 0.10 | 0.00279000 | |||||
Goethite | 1310-14-1 | 0.10 | 0.00537000 | |||||
Polyacrylamide polymer | 40.00 | 0.03 | ||||||
Illite | 12173-60-3 | 1.00 | 0.00406000 | |||||
Organic phosphonate 2 | 10.00 | 0.00189000 | ||||||
Nonionic surfactant | 5.00 | 0.00419000 | ||||||
Organic phosphonate 1 | 30.00 | 0.00568000 | ||||||
Propargyl Alcohol | 10.00 | 0.00014000 | ||||||
Methanol | 67-56-1 | 60.00 | 0.00651000 | |||||
DWP-612 | Calfrac Well Services | Friction Reducer | ||||||
Water | BaseFluid/Mix Water | Water | 7732-18-5 | 100.00 | 85.24 | |||
Sand (Proppant) | Calfrac Well Services | Propping Agent | ||||||
DAP-901 | Calfrac Well Services | Scale Inhibitor | ||||||
DAP-103 | Calfrac Well Services | Iron Control | ||||||
DWP-944 | Calfrac Well Services | Biocide |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | EXCO RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 415,157.00 | 124 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 874,644.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 619,418.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 488,516.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 433,362.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 369,692.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 318,679.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 273,132.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 2,410.73 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2012 | EXCO RESOURCES PA LLC | Drilling Fluid Waste | 1,576.78 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 1,888.85 Bbl | INJECTION DISPOSAL WELL | 34-013-20611 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 220.22 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EXCO RESOURCES PA LLC | Drill Cuttings | 733.35 Tons | LANDFILL | 100434 |
2012 | EXCO RESOURCES PA LLC | Fracturing Fluid Waste | 27.21 Tons | LANDFILL | 100585 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 318.97 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2012 | EXCO RESOURCES PA LLC | Drill Cuttings | 83.12 Tons | LANDFILL | 100585 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 208.75 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2012 | EXCO RESOURCES PA LLC | Fracing Fluid Waste | 5,008.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 302.03 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 3,930.11 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 3,350.71 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 2,999.10 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 1,984.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 310.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 1,802.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | 1,196.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE | |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 212.10 Bbl | REUSE (AT WELL PAD) | |
2017 | EXCO RESOURCES PA LLC | 212.10 Bbl | REUSE (AT WELL PAD) | ||
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 313.90 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 1,379.70 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 1,214.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2032453 | Primary Facility | 2012-01-03 | Drilling/Alteration | No Violations Noted | not drilled |
2034825 | Primary Facility | 2012-01-10 | Drilling/Alteration | No Violations Noted | not drilled |
2038369 | Primary Facility | 2012-01-18 | Drilling/Alteration | No Violations Noted | not drilled |
2038370 | Primary Facility | 2012-01-24 | Drilling/Alteration | No Violations Noted | not drilled |
2038492 | Primary Facility | 2012-01-31 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Erosion controls had been implemented as outlined in the ESCGP. There was no observed evidence of accelerated erosion or sedimentation. |
2056816 | Primary Facility | 2012-04-03 | Routine/Complete Inspection | No Violations Noted | @ 2070' |
2076849 | Primary Facility | 2012-06-15 | Routine/Complete Inspection | No Violations Noted | operating thru flow back system |
2077687 | Primary Facility | 2012-06-20 | Routine/Complete Inspection | No Violations Noted | Drilling was not ongoing at the time of the inspection. Wells were in the process of being equipped for production. Frac flowback and the freshwater impoundment contained fluids and both had more than the required two feet of lined freeboard. Work was underway to equip the wells onsite for production. Brine tanks were installed and appeared to be in sound condition. Six frac tanks were located onsite and there was no visible evidence of any spills or leaks related to the frac tanks. Site and access road erosion controls had been implemented and maintained properly. |
2086791 | Primary Facility | 2012-07-27 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Brine tank diking was in place. Site had not been restored as of the time of the inspection. Erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2101388 | Primary Facility | 2012-09-20 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Brine tank diking was in place. Site had not been restored as of the time of the inspection. Erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2105804 | Primary Facility | 2012-10-04 | Routine/Complete Inspection | No Violations Noted | operating |
2148884 | Primary Facility | 2013-03-18 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Brine tank diking was in place. Site had not been restored as of the time of the inspection. Erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2198260 | Primary Facility | 2013-08-22 | Routine/Complete Inspection | No Violations Noted | operating ID/ E&S OK |
2230456 | Primary Facility | 2013-12-09 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been properly implemented and maintained. Site had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. |
2244570 | Primary Facility | 2014-02-11 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site was snow covered. |
2293416 | Primary Facility | 2014-08-05 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Secondary containment for the brine tank appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2330932 | Primary Facility | 2014-12-11 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Secondary containment for the brine tank appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2359978 | Primary Facility | 2015-04-08 | Routine/Complete Inspection | No Violations Noted | There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tank located onsite and it appeared to be in sound condition. |
2444308 | Primary Facility | 2016-01-28 | Routine/Complete Inspection | No Violations Noted | There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tank located onsite and it appeared to be in sound condition. Well appeared to be equipped for production. |
2506409 | Primary Facility | 2016-08-01 | Routine/Complete Inspection | No Violations Noted | There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tank located onsite, within secondary containment and it appeared to be in sound condition. Well appeared to be equipped for production. |
2557179 | Primary Facility | 2017-01-30 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2589781 | Primary Facility | 2017-05-03 | Routine/Complete Inspection | No Violations Noted | All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids. |
2673241 | Primary Facility | 2017-12-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 5H drilled and appears equipped for production. Wells 2H, 3H, and 1H also drilled and appear equipped for production. |
2798937 | Primary Facility | 2018-11-05 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by cement barriers. Three brine tanks located in secondary containment on site. One brine tank not located in secondary containment on site. |
2836784 | Primary Facility | 2019-02-05 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks. There was some minor rust. The cellar was filled with gravel. The pressure reading for the tubing was reading 280 psi. The well was properly labeled and the Emergency Response sign was posted at the site entrance. There were 4 tanks on the pad. 3 were contained within a lined, steel dike and 1 was not contained. 3 line heaters were in use, 1 being a dual heater. |
For data sources see[8]