If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31217 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.745767,"lon":-79.411408,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Kittanning Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 144991 | |
Farm/Lease Name: BLANEY 591775 | |
License Status: Active | |
Spud Date: 2015-04-10 | |
Permit Date: 2014-08-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.745767 | |
Longitude: -79.411408 |
Date | Event |
---|---|
2014-08-01 | New Permit Application |
2015-04-08 | Performed Spud Operation |
2015-08-17 | Drilling Completion |
2015-09-19 | Perforation |
2015-09-19 | Performed Stage 1 of Stimulation |
2015-09-20 | Perforation |
2015-09-20 | Performed Stage 2 of Stimulation |
2015-09-20 | Performed Stage 3 of Stimulation |
2015-09-20 | Performed Stage 4 of Stimulation |
2015-09-20 | Performed Stage 5 of Stimulation |
2015-09-21 | Perforation |
2015-09-21 | Performed Stage 6 of Stimulation |
2015-09-21 | Performed Stage 7 of Stimulation |
2015-09-21 | Performed Stage 8 of Stimulation |
2015-09-22 | Perforation |
2015-09-22 | Performed Stage 10 of Stimulation |
2015-09-22 | Performed Stage 11 of Stimulation |
2015-09-22 | Performed Stage 12 of Stimulation |
2015-09-22 | Performed Stage 13 of Stimulation |
2015-09-22 | Performed Stage 9 of Stimulation |
2015-09-23 | Perforation |
2015-09-23 | Performed Stage 14 of Stimulation |
2015-09-23 | Performed Stage 15 of Stimulation |
2015-09-24 | Perforation |
2015-09-24 | Performed Stage 16 of Stimulation |
2015-09-24 | Performed Stage 17 of Stimulation |
2015-09-24 | Performed Stage 18 of Stimulation |
2016-06-24 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-19 | 2015-09-24 | 7,171 | 8,520,040 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CS-500-SI | FTS International | Scale inhibitor | Ethylene glycol | 107-21-1 | 10 | 0.00251519 | 2018.02 |
FRW-900 | FTS International | Friction reducer | Oxyalkylated alcohol A | Proprietary | 5 | 0.00044652 | 358.258 | |
Alkyl alcohol | Proprietary | 10 | 0.000893039 | 716.516 | ||||
Hydrotreated light distillate | 64742-47-8 | 30 | 0.00267912 | 2149.55 | ||||
FE-100L | FTS International | Iron control | Citric acid | 77-92-9 | 55 | 0.000830273 | 666.156 | |
MC MX 437-5 | Multi-Chem Group | Calcium nitrate solution | Calcium nitrate | 10124-37-5 | 60 | 0.0567694 | 45548 | |
NE-100 | FTS International | Non-emulsifier | Dodecylbenzenesulfonic acid | 27176-87-0 | 5 | 0.00001030 | 8.262 | |
2-Butoxyethanol | 111-76-2 | 10 | 0.00002059 | 16.523 | ||||
2-Propanol | 67-63-0 | 10 | 0.00002059 | 16.523 | ||||
HVG-1 4.0 | FTS International | Water gelling agent | Quartz | 14808-60-7 | 4 | 0.00002907 | 23.326 | |
Isotridecanol, ethoxylated | 9043-30-5 | 2 | 0.00001454 | 11.663 | ||||
Guar gum | 9000-30-0 | 50 | 0.000363413 | 291.578 | ||||
Raffinates, Sorption process | 64741-85-1 | 55 | 0.000399754 | 320.736 | ||||
Water | FTS International | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.6161 | 71,099,700.0 | |
APB-1 | FTS International | Gel breaker | Ammonium persulfate | 7727-54-0 | 95 | 0.00000829 | 6.65 | |
Sand (Proppant) | FTS International | Proppant | Silica Substrate | 14808-60-7 | 100 | 11.0398 | 8,857,630.0 | |
FRW-600 | FTS International | Friction reducer | Ammonium acetate | 631-61-8 | 6 | 0.00475021 | 3811.26 | |
Hydrotreated light distillate | 64742-47-8 | 30 | 0.0237511 | 19056.3 | ||||
CI-150 | FTS International | Acid corrosion inhibitor | Quaternary ammonium compound | Proprietary | 10 | 0.00002368 | 19.002 | |
Dimethylformamide | 68-12-2 | 10 | 0.00002368 | 19.002 | ||||
Isopropanol | 67-63-0 | 30 | 0.00007105 | 57.005 | ||||
Aromatic aldehyde | Proprietary | 10 | 0.00002368 | 19.002 | ||||
Organic amine resin salt | Proprietary | 30 | 0.00007105 | 57.005 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00007105 | 57.005 | ||||
Hydrochloric Acid (15%) | FTS International | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0200321 | 16072.5 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-09-19 | 1 | SAND | 2,877,630 | 8,843 | 9,306 |
2015-09-20 | 2 | SAND | 2,877,630 | 9,018 | 9,297 |
2015-09-20 | 3 | SAND | 2,877,630 | 9,051 | 9,373 |
2015-09-20 | 4 | SAND | 2,877,630 | 9,161 | 9,498 |
2015-09-20 | 5 | SAND | 2,877,630 | 9,197 | 9,462 |
2015-09-21 | 6 | SAND | 2,877,630 | 9,119 | 9,701 |
2015-09-21 | 7 | SAND | 2,877,630 | 9,178 | 9,394 |
2015-09-21 | 8 | SAND | 2,877,630 | 9,095 | 9,404 |
2015-09-22 | 9 | SAND | 2,877,630 | 9,043 | 9,291 |
2015-09-22 | 10 | SAND | 2,877,630 | 9,022 | 9,302 |
2015-09-22 | 11 | SAND | 2,877,630 | 9,053 | 9,423 |
2015-09-22 | 12 | SAND | 2,877,630 | 8,777 | 9,392 |
2015-09-22 | 13 | SAND | 2,877,630 | 8,444 | 8,861 |
2015-09-23 | 14 | SAND | 2,877,630 | 8,382 | 8,927 |
2015-09-23 | 15 | SAND | 2,877,630 | 8,353 | 9,461 |
2015-09-24 | 16 | SAND | 2,877,630 | 8,471 | 9,948 |
2015-09-24 | 17 | SAND | 2,877,630 | 7,900 | 8,900 |
2015-09-24 | 18 | SAND | 2,877,630 | 8,571 | 9,599 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2015 | EQT PROD CO | 121,049.00 | 28 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 938,579.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 587,141.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 436,046.00 | 361 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 357,844.00 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | EQT PROD CO | Produced Fluid | 3,026.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | EQT PROD CO | Drilling Fluid Waste | 1,850.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Drill Cuttings | 406.00 Tons | LANDFILL | 100434 |
2015 | EQT PROD CO | Drill Cuttings | 414.78 Tons | LANDFILL | 101397 |
2015 | EQT PROD CO | Drill Cuttings | 265.00 Tons | LANDFILL | 100585 |
2015 | EQT PROD CO | Fracing Fluid Waste | 9,330.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Fracing Fluid Waste | 590.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | EQT PROD CO | Produced Fluid | 7,022.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Servicing Fluid | 22.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | EQT PROD CO | Produced Fluid | 5,347.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | EQT PROD CO | Fracturing Fluid Waste | 65.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Produced Fluid | 300.00 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3097 |
2016 | EQT PROD CO | Synthetic Liner Materials | 42.43 Tons | LANDFILL | 100277 |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Produced Fluid | 3,192.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 142.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 22,293.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EQT PROD CO | Produced Fluid | 2,982.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 110.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | 2,765.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | EQT PROD CO | Produced Fluid | 1,775.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 1,067.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | 1,225.00 Bbl | REUSE (AT WELL PAD) | ||
2017 | EQT PROD CO | 527.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 | |
2018 | EQT PROD CO | Produced Fluid | 2,955.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 40.71 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 455.38 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 21.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 776.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 220.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | EQT PROD CO | Produced Fluid | 123.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 108.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Produced Fluid | 54.07 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | EQT PROD CO | Produced Fluid | 16.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | EQT PROD CO | Produced Fluid | 156.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 30.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 2.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 74.29 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 1,125.63 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 36.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2362082 | Primary Facility | 2015-04-16 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. All cut and fill slopes had been temporarily stabilized with seed and mulch. All site and access road controls had been properly installed and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2378055 | Primary Facility | 2015-06-10 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. All cut and fill slopes had been temporarily stabilized with seed and mulch. All site and access road controls had been properly installed and there was no observed accelerated erosion or sedimentation in relation to the site or access road. One of the two impoundments shown on the plan drawings had been constructed, lined and a fence had been installed. |
2378261 | Primary Facility | 2015-05-01 | Drilling/Alteration | No Violations Noted | drilling 591764 |
2378316 | Primary Facility | 2015-05-28 | Drilling/Alteration | No Violations Noted | drilling 590948 |
2378324 | Primary Facility | 2015-05-20 | Drilling/Alteration | No Violations Noted | drilling 591764 |
2378339 | Primary Facility | 2015-05-13 | Drilling/Alteration | No Violations Noted | drilling 591662 |
2378344 | Primary Facility | 2015-05-05 | Drilling/Alteration | No Violations Noted | drilling 591764 |
2401265 | Primary Facility | 2015-07-10 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no E&S concerns and no freeboard issues were present at the site. Drilling well 591764 |
2406777 | Primary Facility | 2015-09-14 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, wells were not equipped for production. Work was underway onsite to prep the site for well stimulation activities. Containment was being laid and Baker Tanks were onsite to be put into place on containment. Impoundments had been constructed onsite, they had been properly lined and contained fluids. There was more than two feet of lined freeboard in each impoundment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2417362 | Primary Facility | 2015-08-10 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no E&S concerns and no freeboard issues were present at the site. Drilling well 590948 |
2417411 | Primary Facility | 2015-08-20 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no freeboard issues were present at the site. Drilling well 591775. |
2420118 | Primary Facility | 2015-08-31 | Drilling/Alteration | No Violations Noted | Well Id sign and E&S plan were present at access road. At the time of the inspection, no freeboard issues were present at the site. Drilling well 591661 |
2437904 | Primary Facility | 2016-01-04 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production unit-tank battery-dike-equipment all ok. |
2441184 | Primary Facility | 2016-01-15 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. All E&S controls had been implemented properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. Impoundments located onsite and they both contained fluids and had more than the required freeboard. |
2470320 | Primary Facility | 2016-03-31 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set-equipment-tank battery and dike look ok. |
2478036 | Primary Facility | 2016-04-25 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. All E&S controls had been implemented properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. Impoundments located onsite and they both contained fluids and had more than the required freeboard. Based upon the observation of deposits in both impoundments it was inferred that flowback fluids had been contained within each of the impoundments. |
2507382 | Primary Facility | 2016-08-02 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. All E&S controls had been implemented properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. Impoundments located onsite and they both contained fluids and had more than the required freeboard. Work was underway to empty the impoundments of their fluid contents and solids to prepare them for liner removal and regrading. |
2529543 | Primary Facility | 2016-10-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. All E&S controls had been implemented properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. Earthwork was underway to restore the site and bring it into agreement with the PCSM plan contained within the ESCGP. |
2547491 | Primary Facility | 2016-12-28 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that earthmoving activities to restore the site had been completed. The site had been temporarily stabilized and thatnthe vegetation had begun to grow but had not yet attained 70% uniform coverage. |
2560262 | Primary Facility | 2017-02-09 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2595750 | Primary Facility | 2017-05-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2658890 | Primary Facility | 2017-11-09 | Site Restoration | No Violations Noted | Multi-well pad. At time of inspection, well drilled and appears equipped for production. |
2709284 | Primary Facility | 2018-03-23 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2720551 | Primary Facility | 2018-04-12 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. At time of inspection, wells 591765, 590949, 591764, 590948, 591775, 591662, 591661 drilled and appear equipped for production.
The ESCGP for this site was previously terminated on 10/27/2017. |
2774773 | Primary Facility | 2018-09-13 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and complete tank battery look ok. |
2820885 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[9]