Well ID: 37-005-31316 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.686847,"lon":-79.681331,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Freeport Borough | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 155139 | |
Farm/Lease Name: TRILOGY B 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2018-03-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.686847 | |
Longitude: -79.681331 |
Date | Event |
---|---|
2018-03-12 | New Permit Application |
2018-09-17 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | XTO ENERGY INC | 1,581,925.88 | 135 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | XTO ENERGY INC | Drilling Fluid Waste | 480.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Drill Cuttings | 634.70 Tons | LANDFILL | 100585 |
2019 | XTO ENERGY INC | Drill Cuttings | 1,039.25 Tons | LANDFILL | 100585 |
2019 | XTO ENERGY INC | Produced Fluid | 1,271.15 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Unused Fracturing Fluid Waste | 13.33 Tons | LANDFILL | 100434 |
2019 | XTO ENERGY INC | Produced Fluid | 1,205.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 345.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Drill Cuttings | 117.68 Tons | LANDFILL | 100172 |
2019 | XTO ENERGY INC | Produced Fluid | 1,792.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 1,019.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 122.13 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 52,888.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 50.00 Bbl | REUSE (AT WELL PAD) | |
2019 | XTO ENERGY INC | Synthetic Liner Materials | 53.50 Tons | LANDFILL | 100585 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2778284 | Primary Facility | 2018-09-21 | Drilling/Alteration | No Violations Noted | This well was spudded to 40' and had 40' of 30" pipe installed and cemented back to surface. All equipment on site looked ok. |
2778803 | Primary Facility | 2018-09-24 | Drilling/Alteration | No Violations Noted | This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.
On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok. |
2790011 | Primary Facility | 2018-10-17 | Drilling/Alteration | No Violations Noted | This well was spudded to 42' and had 42' of 40" pipe installed and cemented back to surface inside an 8'x10' cellar. All equipment on site looked ok.
On this return date, the top hole rig was on site drilling at 1383' at the time of this inspection. All well log information and equipment on site looks ok. |
2821634 | Primary Facility | 2019-01-03 | Drilling/Alteration | No Violations Noted | The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok. |
2853390 | Primary Facility | 2019-03-12 | Drilling/Alteration | No Violations Noted | At the time of inspection, Patterson 579 was drilling 8 3/4" hole in the curve. Once they land the curve, they will switch to a 8 1/2" bit. The BOP was tested on 3/10. Containment appeared to be in good condition, with fuel and mud within double containment. |