37-005-31318

Well Details

Well ID: 37-005-31318
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Freeport Borough
Operator Name: XTO ENERGY INC
Well Pad ID: 155139
Farm/Lease Name: TRILOGY C 4H
License Status:
Spud Date:
Permit Date: 2018-03-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.686864
Longitude: -79.681397

For data sources see[1][2][3]

Well History

Date Event
2018-03-12 New Permit Application
2018-09-17 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 XTO ENERGY INC 1,494,123.60 139 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 XTO ENERGY INC Drilling Fluid Waste 1,080.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Drill Cuttings 719.09 Tons LANDFILL 100585
2018 XTO ENERGY INC Drill Cuttings 14.77 Tons LANDFILL 100434
2019 XTO ENERGY INC Drill Cuttings 1,060.01 Tons LANDFILL 100585
2019 XTO ENERGY INC Produced Fluid 1,016.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Unused Fracturing Fluid Waste 13.32 Tons LANDFILL 100434
2019 XTO ENERGY INC Produced Fluid 1,504.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Other Oil & Gas Wastes 253.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Drill Cuttings 167.00 Tons LANDFILL 100172
2019 XTO ENERGY INC Produced Fluid 1,463.06 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 1,118.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 XTO ENERGY INC Waste Water Treatment Sludge 122.13 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Produced Fluid 53,898.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Other Oil & Gas Wastes 50.00 Bbl REUSE (AT WELL PAD)
2019 XTO ENERGY INC Synthetic Liner Materials 53.50 Tons LANDFILL 100585

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2775897 Primary Facility 2018-09-17 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.
2778793 Primary Facility 2018-09-24 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

2800614 Primary Facility 2018-11-08 Drilling/Alteration No Violations Noted This well was spudded to a depth of 40' and had 40' of 30" conductor pipe cemented to surface inside a cellar which measures 10' in diameter by 8' deep. All equipment on site looked ok.

On this return date, the well bore hole had been deepened to 68' and the Rig had run 68' of 24" pipe, cemented it to surface and covered the well cellar with a steel plate until the next Rig returns to continue the drilling operation. The well log record and all equipment on site looked ok.

On this date the rig had finished their top hole portion of this well and had TD'd at 6278' and was moving equipment off the well. All paperwork and equipment on site looked ok.

2821638 Primary Facility 2019-01-03 Drilling/Alteration No Violations Noted The top hole portion of this well has been drilled and the well casing is capped off waiting on the finishing rig to arrive. The well head casing and all equipment on site looks ok.

For data sources see[7]